Affinity Energy

How many solar installs has Affinity Energy done in California, and which license number is on its installs?

Affinity Energy has 60 residential solar installs interconnected in California, active in the records from 2004 through 2013 (Apr 23, 2004 to Oct 28, 2013), most of them in Sonoma County (49), Marin County (5) and Lake County (3). The utilities did not record a CSLB license number on enough of these installs to look one up.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
60
Last 24 months
0
Total capacity
301.6 kW DC
Median system size
3.9 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
0.0% of 60 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
none recorded
First install
Apr 23, 2004
Latest install
Oct 28, 2013
Counties
6
Utilities
PGE 60
CSLB license
none reported

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2004 to 2026

YearInstalls interconnectedWith battery storage
200460
2005100
200650
200780
2008150
200940
201020
201170
201210
201320
201400
201500
201600
201700
201800
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 60 interconnected installs with a tariff recorded (60) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.060100.0%not counted
NEM 2.000.0%0
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Affinity Energy’s installs. No residential system in the file lists a third-party owner name that matches Affinity Energy exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 60 of Affinity Energy’s 60 installs name a module maker in the “Generator Manufacturer” fields, and most of those (47, 78.3%) used modules recorded as Sharp.

Across all years, 60 of Affinity Energy’s 60 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (42, 70.0%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSharp047
Kyocera03
Sanyo03
United Solar Systems Corp.02
BP Solar01
Inverter makerSMA042
Enphase06
Xantrex Technology Inc.05
Sharp04
Fronius02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 60 of 60 installs, inverters on 60. See the methodology and the equipment index.

Contractor license

The utilities did not record a license number for enough of these installs to look one up.

License numbers are the ones the utilities recorded on the interconnection applications (0 of 60 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it.

Counties

CountyInstalls
Sonoma49
Marin5
Lake3
Alameda1
Santa Clara1
Yolo1

Top cities

CityInstalls
Santa Rosa19
Sebastopol6
Windsor6
Healdsburg5
Cloverdale3
Sonoma3
Forestville2
Glen Ellen2
Guerneville1
Hidden Valley Lake1
Inverness1
Kelseyville1
Larkspur1
Middletown1
Novato1

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Affinity Energy60

Common questions

Where does Affinity Energy install solar?

Its installs are spread across 6 counties. The most are in Sonoma County (49 installs), followed by Marin County (5).

How often does Affinity Energy install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many Affinity Energy installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 60 interconnected installs with a tariff recorded (60) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.