American Dream Construction, Inc

How many solar installs has American Dream Construction, Inc done in California, and which license number is on its installs?

American Dream Construction, Inc has 98 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Feb 9, 2023 to May 26, 2026), most of them in Butte County (91), Shasta County (3) and Lake County (2). CSLB lists license 1040201 (AMERICAN DREAM CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
98
Last 24 months
51
Total capacity
358.1 kW DC
Median system size
3 kW DC
With battery storage
3.1% all time; 5.9% last 24 months
Third-party owned
0.0% of 98 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
74 installs, latest May 26, 2026
Ownership types recorded
none recorded
First install
Feb 9, 2023
Latest install
May 26, 2026
Counties
5
Utilities
PGE 98
CSLB license
1040201

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
2023270
2024260
2025280
2026 (through Aug 31, 2026)173

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

74 of its 98 interconnected installs (75.5% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 4.1% of those include battery storage. The latest Net Billing Tariff install was approved May 26, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.02424.5%0 (0.0%)
Net Billing Tariff7475.5%3 (4.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on American Dream Construction, Inc’s installs. No residential system in the file lists a third-party owner name that matches American Dream Construction, Inc exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 50 of American Dream Construction, Inc’s 51 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (25, 50.0%) used modules recorded as Canadian Solar.

In the last 24 months, 51 of American Dream Construction, Inc’s 51 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (51, 100.0%) used inverters recorded as Enphase.

In the last 24 months, 3 of American Dream Construction, Inc’s 51 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3, 100.0%) used batteries recorded as Enphase.

3 of 3 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar2532
Mission Solar1313
LONGi66
AMPS Solar22
JA Solar2not in top list
Inverter makerEnphase5198
Battery makerEnphase33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 96 of 98 installs, inverters on 98. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1040201AMERICAN DREAM CONSTRUCTION INC (Corporation)CLEARB General Building ContractorJun 5, 2018Jun 30, 202853

License numbers are the ones the utilities recorded on the interconnection applications (53 of 98 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1040201. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Butte91
Shasta3
Lake2
Mendocino1
Sonoma1

Top cities

CityInstalls
Paradise79
Berry Creek4
Magalia4
French Gulch2
Oroville2
Clearlake1
Clearlake Oaks1
Redding1
Redwood Valley1
Santa Rosa1

Names as recorded by the utilities

The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
American Dream Construction, Inc45
American Dream Construction, Inc.38
American Dream Construction8
AMERICAN DREAM CONSTRUCTION INC7

Common questions

Where does American Dream Construction, Inc install solar?

Its installs are spread across 5 counties. The most are in Butte County (91 installs), followed by Shasta County (3).

How often does American Dream Construction, Inc install batteries with solar?

3.1% of its interconnected solar installs include battery storage across all years, and 5.9% in the last 24 months (3 of 51).

How many American Dream Construction, Inc installs are under NEM 3.0 (the Net Billing Tariff)?

74 of its 98 interconnected installs (75.5% of the 98 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 4.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.