Green Convergence: latest installs on record in California

Is Green Convergence still installing solar in California?

The most recent install credited to Green Convergence in California’s interconnection data was approved in August 2026; it has 96 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 927678 (GREEN CONVERGENCE) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, C-39, expires Jan 31, 2027, the number recorded on 96 of those installs.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 14, 2026
Last 12 complete months
96 installs, September 2025 through August 2026
Last 24 months
184 installs
All time
2,589 installs, first approved Jul 30, 2009
License on most recent installs
927678, GREEN CONVERGENCE, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
Full record
Green Convergence installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to Green Convergence
August 20261
July 20265
June 20262
May 20261
April 202610
March 20262
February 20266
January 202613
December 202528
November 20257
October 202514
September 20257
Total96

Net Billing Tariff installs

172 of the installs credited to Green Convergence (6.6% of the 2,589 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.8% of those include battery storage. The latest was approved Jul 24, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
200970
2010210
2011180
2012800
2013980
20141040
20151680
20161460
20171861
20182009
201914617
202014134
202122143
202237160
202339578
202412968
2025118113
2026 (through Aug 31, 2026)4035

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
927678GREEN CONVERGENCECLEARB General Building Contractor; C-10 Electrical Contractor; C-39 Roofing ContractorJan 31, 202796

Names written on these installs: GREEN CONVERGENCE (95), Green Convergence (1). 96 of the 96 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to Green Convergence approved?

The latest App Approved date on an install credited to Green Convergence is Aug 14, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Jul 30, 2009.

How many solar installs has Green Convergence had in California in the last 12 months?

96 residential solar installs credited to Green Convergence were approved for interconnection from September 2025 through August 2026. Across all years it has 2,589.

Does a recent install mean Green Convergence is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.