Infinity Energy, Inc: latest installs on record in California

Is Infinity Energy, Inc still installing solar in California?

The most recent install credited to Infinity Energy, Inc in California’s interconnection data was approved in August 2026; it has 50 in the last 12 complete months (September 2025 through August 2026). The license number recorded on most of those installs, 998627, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 17, 2026
Last 12 complete months
50 installs, September 2025 through August 2026
Last 24 months
880 installs
All time
22,317 installs, first approved Feb 11, 2015
License on most recent installs
998627, not found in the CSLB License Master file pulled Nov 4, 2026
Full record
Infinity Energy, Inc installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to Infinity Energy, Inc
August 20261
July 20262
June 20264
May 20264
April 202612
March 20265
February 20265
January 20260
December 20253
November 20252
October 20255
September 20257
Total50

Net Billing Tariff installs

615 of the installs credited to Infinity Energy, Inc (2.8% of the 22,317 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 46.2% of those on PG&E and SCE records include battery storage. The latest was approved Jul 8, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
20152360
20163920
20171,0650
20181,8160
20191,88721
20202,167197
20212,792223
20224,651328
20234,906342
20242,086518
202528658
2026 (through Aug 31, 2026)335

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
998627Not found in the CSLB License Master file pulled Nov 4, 202649

Names written on these installs: INFINITY ENERGY (18), Infinity Energy (14), INFINITY ENERGY INC (12), Infinity Energy, Inc (6). 49 of the 50 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other installer names in the records

Installer names that share a license number with Infinity Energy, Inc, or contain the same brand word. A shared word or number does not by itself mean the same company.

InstallerWhy listedLatest installLast 12 monthsAll time
Infinity Energy Inc NoCalsame license 998627October 20240525
Infinty Energysame license 998627May 2019037

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to Infinity Energy, Inc approved?

The latest App Approved date on an install credited to Infinity Energy, Inc is Aug 17, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Feb 11, 2015.

How many solar installs has Infinity Energy, Inc had in California in the last 12 months?

50 residential solar installs credited to Infinity Energy, Inc were approved for interconnection from September 2025 through August 2026. Months with none recorded: January 2026. Across all years it has 22,317.

Does a recent install mean Infinity Energy, Inc is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.