Nexus Energy Systems: latest installs on record in California

Is Nexus Energy Systems still installing solar in California?

The most recent install credited to Nexus Energy Systems in California’s interconnection data was approved in August 2026; it has 463 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 359060 (NEXUS ENERGY SYSTEMS INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Jul 31, 2027, the number recorded on 455 of those installs.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 31, 2026
Last 12 complete months
463 installs, September 2025 through August 2026
Last 24 months
802 installs
All time
6,091 installs, first approved Dec 30, 2010
License on most recent installs
359060, NEXUS ENERGY SYSTEMS INC, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
Full record
Nexus Energy Systems installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to Nexus Energy Systems
August 202625
July 202634
June 202631
May 202629
April 202648
March 202659
February 202644
January 202645
December 202546
November 202527
October 202541
September 202534
Total463

Net Billing Tariff installs

622 of the installs credited to Nexus Energy Systems (10.2% of the 6,082 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 79.7% of those on PG&E and SCE records include battery storage. The latest was approved Aug 28, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
201010
2011110
2012160
2013190
2014670
20154090
20164360
20174450
20187281
20197411
202054415
202146736
202258226
202367546
2024231112
2025404214
2026 (through Aug 31, 2026)315166

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
359060NEXUS ENERGY SYSTEMS INCCLEARB General Building ContractorJul 31, 2027455

Names written on these installs: NEXUS ENERGY SYSTEMS INC (444), Nexus Energy Systems (19). 455 of the 463 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.

Other installer names in the records

Installer names that share a license number with Nexus Energy Systems, or contain the same brand word. A shared word or number does not by itself mean the same company.

InstallerWhy listedLatest installLast 12 monthsAll time
NEXUS ENERGYsame license 359060October 20190181
Nexus Solarsame license 359060August 2017037

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to Nexus Energy Systems approved?

The latest App Approved date on an install credited to Nexus Energy Systems is Aug 31, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Dec 30, 2010.

How many solar installs has Nexus Energy Systems had in California in the last 12 months?

463 residential solar installs credited to Nexus Energy Systems were approved for interconnection from September 2025 through August 2026. Across all years it has 6,091.

Does a recent install mean Nexus Energy Systems is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.