Southwest Sun Solar: latest installs on record in California

Is Southwest Sun Solar still installing solar in California?

The most recent install credited to Southwest Sun Solar in California’s interconnection data was approved in August 2026; it has 11 in the last 12 complete months (September 2025 through August 2026). CSLB lists license 1004667 (SWSS ELECTRICAL) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, expires Jun 30, 2027, the number recorded on 11 of those installs.

The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy.

Latest install approved
Aug 21, 2026
Last 12 complete months
11 installs, September 2025 through August 2026
Last 24 months
27 installs
All time
3,394 installs, first approved Jul 14, 2015
License on most recent installs
1004667, SWSS ELECTRICAL, CSLB status CLEAR in the License Master file pulled Nov 4, 2026
Full record
Southwest Sun Solar installer page

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs in each of the last 12 complete months

Month approvedInstalls credited to Southwest Sun Solar
August 20262
July 20261
June 20260
May 20260
April 20261
March 20261
February 20260
January 20260
December 20250
November 20251
October 20252
September 20253
Total11

Net Billing Tariff installs

42 of the installs credited to Southwest Sun Solar (1.2% of the 3,394 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those on PG&E and SCE records include battery storage. The latest was approved Aug 21, 2026.

Installs by year

YearInstalls interconnectedWith battery storage
20152090
20167180
20178140
20186620
20195342
20203100
2021280
2022420
2023350
2024190
2025181
2026 (through Aug 31, 2026)51

License numbers on installs in the last 12 months

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsExpiresInstalls
1004667SWSS ELECTRICALCLEARC-10 Electrical Contractor; C-39 Roofing ContractorJun 30, 202711

Names written on these installs: Southwest Sun Solar (10), SOUTH WEST SUN SOLAR INC (1). 11 of the 11 carry a CSLB number. Numbers on fewer than 3 installs or 1% of them are left out as likely typos.

Other installer names in the records

Installer names that share a license number with Southwest Sun Solar, or contain the same brand word. A shared word or number does not by itself mean the same company.

InstallerWhy listedLatest installLast 12 monthsAll time
SWSS ELECTRICALsame license 1004667August 20262332,768
GCI Solarsame license 1000000October 201801,615
Rayco Energy Inc.same license 1000000July 2017062

How to read this record

Each install is a home solar system that Pacific Gas and Electric, Southern California Edison or San Diego Gas & Electric approved to connect to the grid. The month is the App Approved date, which comes after the system is installed. The installer is the name written on the interconnection application. Counts run through Aug 31, 2026, the latest date in the DG Stats file Interconnected_Project_Sites_2026-08-31.zip.

To check a license today, use CSLB’s license check. See every installer’s latest install and the large installers with no installs in the last six months.

Common questions

When was the last install credited to Southwest Sun Solar approved?

The latest App Approved date on an install credited to Southwest Sun Solar is Aug 21, 2026, in the DG Stats file current through Aug 31, 2026. Its first was Jul 14, 2015.

How many solar installs has Southwest Sun Solar had in California in the last 12 months?

11 residential solar installs credited to Southwest Sun Solar were approved for interconnection from September 2025 through August 2026. Months with none recorded: December 2025, January 2026, February 2026, May 2026 and June 2026. Across all years it has 3,394.

Does a recent install mean Southwest Sun Solar is still in business?

No. The interconnection record shows installs the utilities approved to connect to the grid under an installer name. It cannot show whether a company is still in business, has been sold or has filed for bankruptcy. An installer name can stay on applications filed before a change, and a business can work under a new name or license.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. Neither record states whether a company is in business. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.