City of Glendale - (CA): net-metered solar

How many net-metered solar customers does City of Glendale - (CA) have?

City of Glendale - (CA) reported 4,014 net-metered solar PV installations (3,874 residential) with 36.171 MW of PV capacity (reported in AC) to EIA for 2025, and 343 PV-paired battery installations. It also reported 6 distributed generators that are not net metered, 2.382 MW in all.

From EIA’s 2025 Form EIA-861 files, downloaded Nov 16, 2026. Figures are as the utility reported them to EIA.

EIA utility number
7294
Ownership type (EIA)
Municipal
Capacity unit reported
AC
Balancing authority
LDWP
California counties served (EIA)
Los Angeles

This utility’s customers are not in the PG&E, SCE and SDG&E interconnection records the installer pages on this site are built from.

Net-metered solar PV by sector, 2025

MeasureResidentialCommercialIndustrialTransportationTotal
PV installations3,8741404,014
PV capacity MW24.25711.91436.171

Other net metering fields, 2025

Energy sold back (MWh)
645
Virtual net metering under 1 MW: customers
0
Virtual net metering under 1 MW: capacity
0 MW
Virtual net metering 1 MW and over: customers
0
Virtual net metering 1 MW and over: capacity
0 MW
PV-paired battery installations
343
PV-paired battery capacity
2.793 MW
PV-paired battery energy capacity (MWh)
6
Batteries not paired with PV: installations
3,534
Batteries not paired with PV: capacity
33.379 MW

Distributed generators that are not net metered, 2025

Number of generators
6
Total capacity
2.382 MW
Photovoltaic capacity
1.102 MW
Battery capacity
0 MW

EIA’s note on this file: “Note: Data includes distributed generators less than 1 MW capacity, not net metered, and not reported on the EIA-860. Data is reported as collected. Type refers to the nature of the PV system reporting. EIA uses the type reported from Net Metering unless they informed us otherwise. All non AC units are converted to AC when summed. Generators may be installed at or near a customer's site, or at other locations. They may be owned by either the customers of the distribution utility or the utility. Other generators includes generators for which technology is not specified. Number of generators is not available by individual technology type. Some utilities reclassified net metering as non net metering distributed, or vice versa. Some utilties were double counting net metering as distributed in previous years. Source: U.S. Energy Information Administration, Form EIA-861, 'Annual Electric Power Industry Report.'”

City of Glendale - (CA) has no rows in EIA’s 2026 EIA-861M net metering workbook, which covers a sample of utilities each month.

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities and EIA’s definitions, quoted.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.