Home solar in ZIP code 93640, California

Service city recorded on most installs: Mendota. County: Fresno County.

How many homes in ZIP code 93640 have solar?

PG&E, SCE and SDG&E interconnected 563 residential solar systems in ZIP code 93640 through Aug 31, 2026, 118 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Mendota, Fresno County, as the service city on 563 of them. Tesla Energy Operations (formerly SolarCity) has the most installs recorded in this ZIP, 75.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
563
Last 24 months
118 (Sep 2024 through Aug 2026)
Capacity
3,347 kW DC
Median system size
5.4 kW DC
Net Billing Tariff (NEM 3.0)
164 installs, 29.1% of those with a tariff recorded
Utility
PGE 563
First install in data
Dec 30, 2002
Latest install in data
Aug 13, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200210
200300
200400
200500
200600
200710
200800
200900
201010
201100
201210
201330
201480
2015320
2016650
2017370
2018210
2019351
2020210
2021390
2022530
2023859
20245931
20256964
2026 (through Aug 31, 2026)3224

Battery storage

22.9% of the residential solar installs here include battery storage across all years (129 of 563). In the last 24 months the share was 85.6% (101 of 118).

Net metering tariff

Of the 563 installs with a net metering tariff recorded: NEM 1.0 115 (20.4%), NEM 2.0 284 (50.4%), the Net Billing Tariff (often called NEM 3.0) 164 (29.1%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

38.5% of the 563 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 346 are recorded as not third-party owned. Ownership types recorded: PPA 169, lease 40, prepaid lease 2, other 6.

Installers by installs in 93640

Installers with a page in this index, most installs in this ZIP first. 79 such installers have at least one install here. 14 more installs were by 11 installer names without a page in this index. 12 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 93640Last 24 months
Tesla Energy Operations (formerly SolarCity)750
Sunrun7437
Empower Electric Solar3212
Valley Solar, Inc.300
GRID Alternatives2511
PGS SOLAR ELECTRICAL240
ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING195
LE HOMES194
FREEDOM FOREVER LLC175
GREEN DAY POWER160

City and county recorded for 93640

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Mendota563
County: Fresno County563

Common questions

How common are home batteries with solar in 93640?

22.9% of the residential solar installs here include battery storage across all years (129 of 563). In the last 24 months the share was 85.6% (101 of 118).

How many solar installs in 93640 are under NEM 3.0?

164 of the 563 installs here with a tariff recorded (29.1%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 93640?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Tesla Energy Operations (formerly SolarCity) (75), Sunrun (74), Empower Electric Solar (32). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.