Home solar in ZIP code 95242, California

Service city recorded on most installs: Lodi. County: San Joaquin County.

How many homes in ZIP code 95242 have solar?

PG&E, SCE and SDG&E interconnected 303 residential solar systems in ZIP code 95242 through Aug 31, 2026, 62 of them in the last 24 months (Sep 2024 through Aug 2026). The utilities recorded Lodi, San Joaquin County, as the service city on 303 of them. Sunrun has the most installs recorded in this ZIP, 26.

Counts of interconnected systems from utility records, not a rating of any installer.

Data: California DG Stats interconnection records (Interconnected_Project_Sites_2026-08-31.zip), which run through Aug 31, 2026. ZIP codes are the service ZIP the utility recorded on each project.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

At a glance

Residential solar installs
303
Last 24 months
62 (Sep 2024 through Aug 2026)
Capacity
2,921.8 kW DC
Median system size
8.4 kW DC
Net Billing Tariff (NEM 3.0)
64 installs, 21.1% of those with a tariff recorded
Utility
PGE 303
First install in data
Apr 21, 2004
Latest install in data
Jul 21, 2026

Installs by year

YearInstalls interconnectedWith battery storage
200430
200510
200630
200700
200820
200910
201050
201160
201240
2013110
2014130
2015230
2016150
2017140
2018160
2019192
2020161
2021131
2022322
2023306
20242820
20252524
2026 (through Aug 31, 2026)2315

Battery storage

23.4% of the residential solar installs here include battery storage across all years (71 of 303). In the last 24 months the share was 85.5% (53 of 62).

Net metering tariff

Of the 303 installs with a net metering tariff recorded: NEM 1.0 87 (28.7%), NEM 2.0 152 (50.2%), the Net Billing Tariff (often called NEM 3.0) 64 (21.1%). The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Lease, PPA or owned

21.5% of the 303 installs with ownership recorded are third-party owned (a lease or power purchase agreement); the other 238 are recorded as not third-party owned. Ownership types recorded: PPA 59, lease 5, prepaid lease 1.

Installers by installs in 95242

Installers with a page in this index, most installs in this ZIP first. 98 such installers have at least one install here. 22 more installs were by 15 installer names without a page in this index. 21 were self-installed or had no installer recorded. Counts of connected systems, not a rating.

InstallerInstalls in 95242Last 24 months
Sunrun2612
V3 Electric2421
Tesla Energy Operations (formerly SolarCity)161
SENGA ENERGY LLC75
BTA Solar60
Infinity Energy, Inc60
The Solar Company60
FREEDOM FOREVER LLC51
Fusion Power Design51
SunPower50

City and county recorded for 95242

The Service City and Service County the utilities entered on this ZIP’s installs, as recorded. No outside ZIP directory is used.

Recorded asInstalls
City: Lodi303
County: San Joaquin County303

Common questions

How common are home batteries with solar in 95242?

23.4% of the residential solar installs here include battery storage across all years (71 of 303). In the last 24 months the share was 85.5% (53 of 62).

How many solar installs in 95242 are under NEM 3.0?

64 of the 303 installs here with a tariff recorded (21.1%) were interconnected under the Net Billing Tariff, often called NEM 3.0, which applies to interconnection applications submitted on or after April 15, 2023.

Which solar installers have the most installs in 95242?

Among installers with a page in this index, by installs interconnected here through Aug 31, 2026: Sunrun (26), V3 Electric (24), Tesla Energy Operations (formerly SolarCity) (16). These are counts of connected systems, not a rating of price, workmanship or service.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.