ARAGON ELECTRIC

How many solar installs has ARAGON ELECTRIC done in California, and which license number is on its installs?

ARAGON ELECTRIC has 51 residential solar installs interconnected in California, active in the records from 2005 through 2026 (Nov 23, 2005 to Jul 3, 2026), most of them in Sonoma County (36), Mendocino County (11) and Marin County (4). CSLB lists license 820874 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
51
Last 24 months
15
Total capacity
390.9 kW DC
Median system size
7.5 kW DC
With battery storage
31.4% all time; 60.0% last 24 months
Third-party owned
0.0% of 51 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
11 installs, latest Apr 15, 2026
Ownership types recorded
none recorded
First install
Nov 23, 2005
Latest install
Jul 3, 2026
Counties
3
Utilities
PGE 51
CSLB license
820874

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2005 to 2026

YearInstalls interconnectedWith battery storage
200510
200610
200700
200800
200910
201000
201100
201200
201300
201400
201510
201600
201700
201800
201930
202030
202173
202260
202383
202482
202554
2026 (through Aug 31, 2026)74

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

11 of its 51 interconnected installs (21.6% of the 51 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.8% of those include battery storage. The latest Net Billing Tariff install was approved Apr 15, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.047.8%not counted
NEM 2.03670.6%7 (19.4%)
Net Billing Tariff1121.6%9 (81.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on ARAGON ELECTRIC’s installs. No residential system in the file lists a third-party owner name that matches ARAGON ELECTRIC exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 15 of ARAGON ELECTRIC’s 15 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (7, 46.7%) used modules recorded as Mission Solar.

In the last 24 months, 15 of ARAGON ELECTRIC’s 15 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (14, 93.3%) used inverters recorded as Enphase.

In the last 24 months, 9 of ARAGON ELECTRIC’s 15 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 100.0%) used batteries recorded as Enphase.

13 of 16 battery-paired PG&E and SCE installs (81.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerMission Solar717
REC47
Hyundai22
Silfab113
VSUN (Vietnam Sunergy)1not in top list
Inverter makerEnphase1445
Fortress Power LLC11
Battery makerEnphase913

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 46 of 51 installs, inverters on 51. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names ARAGON ELECTRIC as developer on 9 battery storage projects and as installer on 9 (9 name it as both), 9 projects in all with 242 kWh of storage. 4 have the status Paid, with $74,348 in current incentive allocations. Applications were received from May 12, 2020 to Jul 22, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid497$74,348
Cancelled5145$145,230

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency8213$213,1723$67,942
Large-Scale Storage129$6,4061$6,406

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
820874Sole owner license (name not shown)CLEARC-10 Electrical ContractorJun 18, 2003Jun 30, 202748

License numbers are the ones the utilities recorded on the interconnection applications (48 of 51 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 820874. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list ARAGON ELECTRIC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2026Total
unincorporated Marin County82087411

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Sonoma36
Mendocino11
Marin4

Top cities

CityInstalls
Sonoma10
Santa Rosa8
Petaluma3
Philo3
Redwood Valley3
Windsor3
Cotati2
Penngrove2
Sebastopol2
The Sea Ranch2
Willits2
Cloverdale1
Forestville1
Glen Ellen1
Gualala1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ARAGON ELECTRIC47
Aragon Electric4

Common questions

Where does ARAGON ELECTRIC install solar?

Its installs are spread across 3 counties. The most are in Sonoma County (36 installs), followed by Mendocino County (11).

How often does ARAGON ELECTRIC install batteries with solar?

31.4% of its interconnected solar installs include battery storage across all years, and 60.0% in the last 24 months (9 of 15).

How many ARAGON ELECTRIC installs are under NEM 3.0 (the Net Billing Tariff)?

11 of its 51 interconnected installs (21.6% of the 51 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 81.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.