How many solar installs has BDS Solar Inc done in California, and which license number is on its installs?

BDS Solar Inc has 66 residential solar installs interconnected in California, active in the records from 2010 through 2018 (Jun 22, 2010 to Aug 15, 2018), most of them in Los Angeles County (37), Ventura County (9) and Kern County (7). The license number recorded on most of its installs, 965274, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
66
Last 24 months
0
Total capacity
541.9 kW DC
Median system size
7 kW DC
With battery storage
0.0% all time; no installs in the last 24 months last 24 months
Third-party owned
37.5% of 56 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
lease 20, other 1
First install
Jun 22, 2010
Latest install
Aug 15, 2018
Counties
6
Utilities
SCE 56, PGE 10
CSLB license
965274

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2010 to 2026

YearInstalls interconnectedWith battery storage
201010
201180
2012170
2013180
201480
201540
201690
201700
201810
201900
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 66 interconnected installs with a tariff recorded (66) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.06598.5%not counted
NEM 2.011.5%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 21 of BDS Solar Inc’s installs the utility recorded a third-party ownership type: PPA 0, lease 20, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches BDS Solar Inc exactly.

Third-party owner named on its installsInstalls
NRG SunCap LLC9
Kilowatt Systems LLC7
BriteLease, LLC4
NRG Residential Solar Solutions LLC.1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 21 of BDS Solar Inc’s 66 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (9, 42.9%) used modules recorded as Canadian Solar.

Across all years, 66 of BDS Solar Inc’s 66 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (32, 48.5%) used inverters recorded as SMA.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar09
SolarWorld04
Yingli03
Sun Edison02
JinkoSolar01
Inverter makerSMA032
Fronius020
Advanced Energy, Inc.06
Enphase04
ABB03

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 21 of 66 installs, inverters on 66. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names BDS Solar Inc as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 17 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Oct 12, 2020 to Oct 12, 2020.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled117$3,065

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage117$3,0650$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
965274Not found in the CSLB License Master file pulled Nov 4, 202657

License numbers are the ones the utilities recorded on the interconnection applications (57 of 66 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Counties

CountyInstalls
Los Angeles37
Ventura9
Kern7
San Bernardino6
San Luis Obispo6
Marin1

Top cities

CityInstalls
Palmdale7
Calabasas6
Apple Valley5
Atascadero5
Agoura Hills4
Bakersfield3
Camarillo2
Lancaster2
Littlerock2
Simi Valley2
Thousand Oaks2
Bell Canyon1
Chatsworth1
Covina1
Diamond Bar1

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BDS SOLAR44
BDS Solar Inc7
BDS SOLAR INC6
BDS Solar4
BDS SOLAR INC.2
BDS Solar, Inc.2
BDS Solar Inc.1

Common questions

Where does BDS Solar Inc install solar?

Its installs are spread across 6 counties. The most are in Los Angeles County (37 installs), followed by Ventura County (9).

How often does BDS Solar Inc install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years.

How many BDS Solar Inc installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 66 interconnected installs with a tariff recorded (66) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.