Solar installers in Ventura County, California

Who installs the most solar in Ventura County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Ventura County are Sunrun (1,899), Tesla Energy Operations (formerly SolarCity) (504) and ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING (230). They account for 2,633 of the 6,587 residential solar installs interconnected there in that window.

In all, 42,885 homes in Ventura County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 353 installers with installs in this window. 136 installs in the window were self-installed or had no installer recorded.

1Sunrun1,8996,228
2Tesla Energy Operations (formerly SolarCity)5044,595
3ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING230813
4SunPower2092,124
5ORANGE COUNTY CONTRACTING SERVICES142143
6PORTICADE ENERGY LLC139139
7SESPE POWER SOLUTIONS132384
8FREEDOM FOREVER LLC1251,123
9SHELTER ROOFING & SOLAR CONSTRUCTION125385
10GAF Energy123125
11SOLARA HOME ENERGY LLC101101
12CALIFORNIA SOLAR ELECTRIC SYSTEMS INC93366
13Solar Optimum Inc.93482
14Complete Solar91234
15Quantum Solar Designs, Inc.85652
16AXIA SOLAR CORP7072
17COASTAL SOLAR65184
18A P ELECTRICAL64333
19AMECO SOLAR LLC63168
20NRG Clean Power59206
21SUNNOVA ENERGY CORPORATION56335
22V3 Electric53128
23BRIGHT OPS5156
24WAYNE PENDREY CONSTRUCTION INC DBA THE SOLAR CONTRACTOR46105
25APOLLO HOME POWER LLC4545

Most installs, all time

1Sunrun6,2286,228
2Tesla Energy Operations (formerly SolarCity)4,5954,595
3Vivint Solar Developer, LLC4,1624,162
4SunPower2,1242,124
5FREEDOM FOREVER LLC1,1231,123
6Kota Construction LLC1,0101,010
7Verengo818818
8ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING813813
9Quantum Solar Designs, Inc.652652
10Semper Solaris Construction Inc497497

Installs by year

YearInstalls interconnectedWith battery storage
20225,7701,480
20235,6671,546
20242,5731,974
20253,5413,140
2026 (through Aug 31, 2026)2,2681,998

Under the Net Billing Tariff (NEM 3.0)

7,165 of the 42,885 residential solar installs in Ventura County (16.7% of the 42,885 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.2% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Ventura County

1Sunrun2,1942,05493.6%
2Tesla Energy Operations (formerly SolarCity)54952996.4%
3ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING26926096.7%
4FREEDOM FOREVER LLC21420495.3%
5SunPower15811975.3%
6ORANGE COUNTY CONTRACTING SERVICES141141100.0%
7PORTICADE ENERGY LLC139139100.0%
8SESPE POWER SOLUTIONS13613599.3%
9GAF Energy1233931.7%
10SHELTER ROOFING & SOLAR CONSTRUCTION11710791.5%
11Solar Optimum Inc.1029290.2%
12SOLARA HOME ENERGY LLC1019897.0%
13Quantum Solar Designs, Inc.948893.6%
14Complete Solar807391.3%
15Kota Construction LLC757498.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Ventura County

CityAll-time installs
Simi Valley10,110
Camarillo5,393
Ventura5,297
Thousand Oaks5,167
Oxnard4,187
Newbury Park2,976
Moorpark2,402
Ojai1,729
Fillmore1,457
Santa Paula1,404
Oak Park872
Santa Rosa Valley422
Oak View377
Piru335
Port Hueneme266
Somis228
Bell Canyon183
Lake Sherwood59
Westlake Village10
Santa Clarita3

ZIP codes in Ventura County

ZIP codes with their own page where the utilities recorded Ventura County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

930655,8995,903797
930634,1934,197586
913203,2743,277629
930103,2513,252456
913603,0293,032420
930122,5622,565420
930032,4232,427498
930212,3962,396310
930041,9041,905317
930231,7231,723219
913621,6152,202334
930151,4611,462138
930601,4041,404259
930361,2161,218148
930331,1721,172193
930301,1271,128158
93001969970187
91377872877141
93035672674114
9302237837845
93040329329154
913612861,172196
9304126626750
9306622822832
9130718224636

Equipment recorded

In the last 24 months, 6,530 of Ventura County’s 6,587 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2,481, 38.0%) used modules recorded as Qcells.

In the last 24 months, 6,586 of Ventura County’s 6,587 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (2,806, 42.6%) used inverters recorded as Tesla.

In the last 24 months, 5,647 of Ventura County’s 6,587 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3,723, 65.9%) used batteries recorded as Tesla.

11,682 of 12,283 battery-paired PG&E and SCE installs (95.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2,4819,044
JA Solar6621,928
LONGi6001,869
REC4542,592
Silfab430not in top list
Inverter makerTesla2,8063,560
Enphase2,49114,027
SolarEdge1,03713,743
SunPower1343,402
SMA1012,437
Battery makerTesla3,7237,094
Enphase1,1541,948
FranklinWH362439
SolarEdge259498
Lunar Energy4343

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 34,216 of 42,885 installs, inverters on 42,868. See the methodology and the equipment index.

SGIP battery storage projects in Ventura County

The SGIP public project report downloaded Nov 16, 2026 lists 3,015 battery storage projects in Ventura County with the status Paid, carrying $47,238,100 in current incentive allocations and 72,262 kWh of storage. Across every status it lists 4,965 storage projects there, 1,291 of them cancelled and 659 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid3,01572,262$47,238,100
PBI in Process7692,832$76,243,134
Reserved41334,099$25,553,364
Pending Reservation501,469$2,385,361
Waitlist791,313$1,990,107
Cancelled1,291103,832$71,201,302
RRF Rejected411,268$468,863

Installers named on the most SGIP storage projects in Ventura County

InstallerProjectsPaid
SWELL SERVICES INC DBA SWELL CONTRACTORS536402
Sunrun487314
LA Solar Group454357
Semper Solaris Construction Inc331281
Plug It In Solar223148
Tesla216137
SunPower193113
Solar Optimum Inc.174118
SESPE POWER SOLUTIONS173107
PLUG IT IN SYSTEMS INC164110

428 of the 4,965 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Ventura County (EIA)

EIA’s 2025 Service Territory file lists 1 utility serving Ventura County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Southern California Edison CoInvestor Owned746,002734,4526,267.868AC130,848

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Ventura County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Ventura County

17 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Ventura County as the county: 11 with the business type Corporation, Limited Liability, Partnership or JointVenture and 6 Sole Owner. 25 C-10 Electrical licenses in Ventura County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Ventura County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
42,885
Last 24 months
6,587
Capacity
286.3 MW DC
Median system size
5.9 kW DC
With battery storage
28.6% all time; 88.2% last 24 months
Third-party owned
37.4% where reported
Ownership types recorded
PPA 11,243, lease 2,930, prepaid lease 49, other 364
Median battery size
13.5 kWh
Earliest install in data
Sep 15, 1999

Common questions

How many homes in Ventura County have solar?

42,885 residential solar systems in Ventura County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 6,587 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Ventura County?

353 installer names have at least one install interconnected in Ventura County in the last 24 months, and 1,324 appear in the full record.

How common are batteries with new solar in Ventura County?

28.6% of the solar installs interconnected in Ventura County include battery storage across all years, and 88.2% in the last 24 months (5,812 of 6,587).

How many solar installs in Ventura County are under NEM 3.0?

7,165 of the 42,885 residential solar installs in Ventura County (16.7% of the 42,885 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.2% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.