Verengo

How many solar installs has Verengo done in California, and which license number is on its installs?

Verengo has 13,964 residential solar installs interconnected in California, active in the records from 2009 through 2019 (Jan 14, 2009 to May 16, 2019), most of them in Los Angeles County (4,056), San Bernardino County (1,795) and Riverside County (1,763). The license number recorded on most of its installs, 935263, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
13,964
Last 24 months
0
Total capacity
76,990 kW DC
Median system size
5 kW DC
With battery storage
0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; no installs in the last 24 months last 24 months
Third-party owned
79.6% of 11,750 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 8,994, lease 35, prepaid lease 6, other 315
Median battery size
8 kWh (2 installs list a capacity)
First install
Jan 14, 2009
Latest install
May 16, 2019
Counties
45
Utilities
SCE 10,531, PGE 2,500, SDGE 933
CSLB license
935263

Is Verengo still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (0 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2009 to 2026

YearInstalls interconnectedWith battery storage
20091180
20103740
20111,1030
20122,3830
20132,6380
20142,4670
20152,4540
20161,7091
20172871
20183990
2019320
202000
202100
202200
202300
202400
202500
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 13,964 interconnected installs with a tariff recorded (13,964) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.013,17794.4%not counted
NEM 2.07875.6%0 (0.0%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 9,350 of Verengo’s installs the utility recorded a third-party ownership type: PPA 8,994, lease 35, prepaid lease 6, other 315. Across all installers, 65 residential systems list a third-party owner name that matches Verengo exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Sunrun, inc.4,803
Clean Power Finance1,151
Sun Run, Inc.1,035
Lennar Homes609
Kilowatt Systems LLC352

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

Across all years, 5,765 of Verengo’s 13,964 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2,032, 35.2%) used modules recorded as Hyundai.

Across all years, 13,928 of Verengo’s 13,964 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (4,935, 35.4%) used inverters recorded as Enphase.

Across all years, 2 of Verengo’s 13,964 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as sonnen.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerHyundai02,032
Trina Solar01,131
Qcells0957
LG0657
Yingli0633
Inverter makerEnphase04,935
ABB03,511
SMA02,625
Power-One02,222
Kaco0458
Battery makersonnen02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,765 of 13,964 installs, inverters on 13,928. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Verengo as developer on 0 battery storage projects and as installer on 80 (0 name it as both), 80 projects in all with 1,232 kWh of storage. 0 have the status Paid, with $0 in current incentive allocations. Applications were received from Feb 23, 2016 to Feb 23, 2016.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Cancelled801,232$955,776

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Not stated801,232$955,7760$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
935263Not found in the CSLB License Master file pulled Nov 4, 202611,952

License numbers are the ones the utilities recorded on the interconnection applications (11,956 of 13,964 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles4,056
San Bernardino1,795
Riverside1,763
Orange1,656
Kern894
Ventura818
Fresno800
San Diego733
Tulare299
Santa Clara143
San Joaquin132
Contra Costa130
Alameda117
Kings77
Solano76
San Mateo52
Merced45
Santa Barbara40
Sonoma40
Madera34
Monterey30
San Luis Obispo27
Santa Cruz26
San Francisco18
Marin17
Butte14
El Dorado12
Placer12
San Benito12
Stanislaus12
Calaveras11
Napa11
Yuba11
Mendocino10
Yolo7
Lake6
Sutter6
Inyo5
Amador4
Mariposa4
Shasta3
Tehama2
Tuolumne2
Humboldt1
Nevada1

Top cities

CityInstalls
Bakersfield538
Lancaster428
Fresno383
Palmdale380
Simi Valley380
Clovis329
Corona307
San Diego262
Apple Valley252
Santa Clarita223
Canyon Country188
Valencia172
Visalia169
Long Beach166
Victorville165

Names as recorded by the utilities

The utilities recorded this installer under 17 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
VERENGO4,395
VERENGO SOLAR3,762
Verengo2,872
Verengo Solar1,798
VERENGO, INC684
Verengo, Inc.183
Verengo, Inc90
Verengo Inc84
VERENGO INC45
Verengo Inc.35
VERENGO, INC.8
Verengo , Inc2
Verengo solar2
Verengo inc1
Verengo INC1
VERENGO INC.1
Verengo SOlar1

Common questions

Where does Verengo install solar?

Its installs are spread across 45 counties. The most are in Los Angeles County (4,056 installs), followed by San Bernardino County (1,795).

How often does Verengo install batteries with solar?

0.0% of its interconnected solar installs include battery storage across all years. Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Verengo installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 13,964 interconnected installs with a tariff recorded (13,964) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.