Solar installers in Riverside County, California

Who installs the most solar in Riverside County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Riverside County are Sunrun (9,829), SUNNOVA ENERGY CORPORATION (1,812) and SunPower (1,698). They account for 13,339 of the 29,736 residential solar installs interconnected there in that window.

In all, 203,423 homes in Riverside County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 596 installers with installs in this window. 440 installs in the window were self-installed or had no installer recorded.

1Sunrun9,82924,719
2SUNNOVA ENERGY CORPORATION1,8126,455
3SunPower1,69823,523
4BRIGHT OPS1,2741,682
5Tesla Energy Operations (formerly SolarCity)1,13816,191
6GAF Energy9981,001
7FREEDOM FOREVER LLC6684,701
8Current Home5612,712
9Renova Energy Corp4178,375
10Complete Solar4021,423
11V3 Electric3841,112
12ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING3672,105
13LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC356545
14Hot Purple Energy3112,185
15SOLARA HOME ENERGY LLC309309
16BETTER EARTH ELECTRIC INC2951,067
17Empower Electric Solar283544
18EXO Energy2701,081
19MY SMART HOUSE LLC267276
20APOLLO HOME POWER LLC256256
21SolarMax Renewable Energy Provider, Inc2552,861
22New Day Solar2201,611
23FREEDOM FOREVER SOUTHERN CALIFORNIA LLC210210
24SOLAR TECH ENERGY SYSTEMS INC205459
25LIFESTYLE SOLAR INC174192

Most installs, all time

1Sunrun24,71924,719
2SunPower23,52323,523
3Tesla Energy Operations (formerly SolarCity)16,19116,191
4Renova Energy Corp8,3758,375
5Vivint Solar Developer, LLC8,3678,367
6SUNNOVA ENERGY CORPORATION6,4556,455
7Solcius5,4345,434
8Horizon Solar Power5,1625,162
9FREEDOM FOREVER LLC4,7014,701
10SunStreet Energy Group LLC4,2044,204

Installs by year

YearInstalls interconnectedWith battery storage
202225,6152,478
202327,0403,791
202417,8009,996
202515,09611,242
2026 (through Aug 31, 2026)9,4507,449

Under the Net Billing Tariff (NEM 3.0)

35,771 of the 203,423 residential solar installs in Riverside County (17.6% of the 203,423 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.1% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Riverside County

1Sunrun11,1778,76378.4%
2SUNNOVA ENERGY CORPORATION2,6701,81568.0%
3SunPower1,94352026.8%
4BRIGHT OPS1,6821,53591.3%
5Tesla Energy Operations (formerly SolarCity)1,2481,15292.3%
6FREEDOM FOREVER LLC1,04999294.6%
7GAF Energy99998898.9%
8Current Home72971998.6%
9Renova Energy Corp68457283.6%
10V3 Electric54152997.8%
11LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC48540783.9%
12ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING47244894.9%
13Bright Planet Solar46820844.4%
14EXO Energy44527060.7%
15BETTER EARTH ELECTRIC INC42240896.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Riverside County

CityAll-time installs
Corona17,957
Murrieta16,321
Menifee15,637
Temecula14,311
Moreno Valley11,284
Riverside10,920
Hemet10,372
Lake Elsinore10,154
Palm Springs8,889
Beaumont8,863
Winchester8,784
Palm Desert8,407
Perris8,135
Cathedral City6,404
San Jacinto5,678
Rancho Mirage5,361
Eastvale5,006
Desert Hot Springs4,507
Wildomar4,293
Jurupa Valley3,768

ZIP codes in Riverside County

ZIP codes with their own page where the utilities recorded Riverside County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

9258412,04512,0471,630
922239,3679,3721,194
925639,3169,321888
925968,7008,7032,151
925928,6478,654895
928807,5197,587913
925627,1717,176784
922346,3936,394924
925306,0916,0971,205
928835,6415,650852
922625,4515,456655
925095,3985,3991,035
922705,3595,361472
925915,2505,254855
925854,9154,917882
922604,5454,547522
925714,4984,499788
925454,2674,270767
922404,2324,236792
925954,1834,185569
928824,0764,079523
925574,0674,070529
925323,9613,961462
922113,8553,855524
925443,7763,778517
925703,5273,529653
922643,4123,413459
917523,2313,255280
925533,1433,145445
925863,0083,010711
928812,9442,947324
925822,8182,819595
925072,7412,743459
925032,7232,723376
925872,6952,697272
925832,6812,684500
925432,4892,492485
925552,3032,304258
928602,2872,288256
928792,0652,069303
922101,8621,863180
925511,8291,833266
923201,7051,709126
922251,2551,255200
925041,0811,082149
925481,0401,040392
92567926927185
9250856556558
9259037337552
9287833133199
9224126927041
9254918118122
9250115315358
9250614714724
9228213213224
9222012412415
9223011011016
92531949494
9253643557
92514363618
9287728280

Equipment recorded

In the last 24 months, 29,541 of Riverside County’s 29,736 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (14,155, 47.9%) used modules recorded as Qcells.

In the last 24 months, 29,736 of Riverside County’s 29,736 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (13,667, 46.0%) used inverters recorded as Enphase.

In the last 24 months, 21,625 of Riverside County’s 29,736 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (13,740, 63.5%) used batteries recorded as Tesla.

37,211 of 38,582 battery-paired PG&E and SCE installs (96.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells14,15546,963
JA Solar3,99810,139
LONGi3,47412,312
Canadian Solar1,65210,257
Silfab1,333not in top list
Inverter makerEnphase13,66771,624
Tesla10,96714,611
SolarEdge5,71163,319
SunPower66622,308
Delta Electronics5105,086
Battery makerTesla13,74019,766
Enphase3,7125,787
SolarEdge2,0143,821
FranklinWH1,5031,944
LG2864,008

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 172,359 of 203,423 installs, inverters on 203,344. See the methodology and the equipment index.

SGIP battery storage projects in Riverside County

The SGIP public project report downloaded Nov 16, 2026 lists 4,199 battery storage projects in Riverside County with the status Paid, carrying $43,263,386 in current incentive allocations and 92,880 kWh of storage. Across every status it lists 7,645 storage projects there, 2,049 of them cancelled and 1,397 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid4,19992,880$43,263,386
PBI in Process4650,591$30,022,646
Reserved68587,979$40,663,657
Pending Reservation11710,430$3,850,094
Waitlist4269,859$16,509,789
Cancelled2,049217,913$119,016,943
RRF Rejected1233,545$968,683

Installers named on the most SGIP storage projects in Riverside County

InstallerProjectsPaid
Sunrun1,230683
Hot Purple Energy807698
Semper Solaris Construction Inc612443
APOLLO HOME POWER LLC507105
Renova Energy Corp427356
SolarMax Renewable Energy Provider, Inc406225
SunPower300121
HAVEN ENERGY SERVICES INC21468
Tesla208121
Infinity Energy, Inc176102

749 of the 7,645 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Riverside County (EIA)

EIA’s 2025 Service Territory file lists 8 utilities serving Riverside County. 5 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Southern California Edison CoInvestor Owned746,002734,4526,267.868AC130,848
Imperial Irrigation DistrictPolitical Subdivision12,07811,728163.208AC0
City of Riverside - (CA)Municipal8,2487,97579DC0
City of Moreno Valley - (CA)Municipal3,2253,20420.363AC87
City of Corona - (CA)Municipal25201.45AC0

Also listed for this county, with no utility-level net metering row in the 2025 file: Anza Electric Coop Inc; City of Banning - (CA); WAPA-- Western Area Power Administration. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Riverside County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Riverside County

81 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Riverside County as the county: 56 with the business type Corporation, Limited Liability, Partnership or JointVenture and 25 Sole Owner. 76 C-10 Electrical licenses in Riverside County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Riverside County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

Solar permit data in Riverside County

One permit dataset in Riverside County is published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Area coveredAgencySolar permits, 2025Battery permits, 2025Full table
City of CoronaCity of Corona921357City page

At a glance

Residential solar installs
203,423
Last 24 months
29,736
Capacity
1,463.9 MW DC
Median system size
6.2 kW DC
With battery storage
19.0% all time; 74.4% last 24 months
Third-party owned
47.8% where reported
Ownership types recorded
PPA 60,752, lease 23,584, prepaid lease 298, other 5,787
Median battery size
13.5 kWh
Earliest install in data
Apr 27, 1999

Common questions

How many homes in Riverside County have solar?

203,423 residential solar systems in Riverside County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 29,736 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Riverside County?

596 installer names have at least one install interconnected in Riverside County in the last 24 months, and 2,603 appear in the full record.

How common are batteries with new solar in Riverside County?

19.0% of the solar installs interconnected in Riverside County include battery storage across all years, and 74.4% in the last 24 months (22,135 of 29,736).

How many solar installs in Riverside County are under NEM 3.0?

35,771 of the 203,423 residential solar installs in Riverside County (17.6% of the 203,423 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 76.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.