Solar installers in Jurupa Valley, California
Most installs here are in Riverside County.
Who installs the most solar in Jurupa Valley?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Jurupa Valley are Sunrun (225), SUNNOVA ENERGY CORPORATION (118) and LIFESTYLE SOLAR INC (55). They account for 398 of the 700 residential solar installs interconnected there in that window.
In all, 3,768 homes in Jurupa Valley have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 74 installers with installs in this window. 13 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | SunStreet Energy Group LLC | 793 | 793 |
| 2 | SUNNOVA ENERGY CORPORATION | 585 | 585 |
| 3 | Sunrun | 415 | 415 |
| 4 | SunPower | 294 | 294 |
| 5 | Tesla Energy Operations (formerly SolarCity) | 146 | 146 |
| 6 | FREEDOM FOREVER LLC | 92 | 92 |
| 7 | Lennar Homes/Sunstreet Energy | 83 | 83 |
| 8 | SolarMax Renewable Energy Provider, Inc | 76 | 76 |
| 9 | V3 Electric | 71 | 71 |
| 10 | Bright Planet Solar | 69 | 69 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 534 | 25 |
| 2023 | 512 | 51 |
| 2024 | 294 | 105 |
| 2025 | 376 | 191 |
| 2026 (through Aug 31, 2026) | 231 | 160 |
Under the Net Billing Tariff (NEM 3.0)
842 of the 3,768 residential solar installs in Jurupa Valley (22.3% of the 3,768 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 54.0% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Jurupa Valley
| 1 | Sunrun | 241 | 145 | 60.2% |
| 2 | SUNNOVA ENERGY CORPORATION | 161 | 8 | 5.0% |
| 3 | LIFESTYLE SOLAR INC | 55 | 1 | 1.8% |
| 4 | GAF Energy | 51 | 51 | 100.0% |
| 5 | OFF GRID ENERGY SOLUTIONS LLC | 32 | 32 | 100.0% |
| 6 | V3 Electric | 26 | 25 | 96.2% |
| 7 | Tesla Energy Operations (formerly SolarCity) | 24 | 22 | 91.7% |
| 8 | BRIGHT OPS | 22 | 21 | 95.5% |
| 9 | SunPower | 22 | 21 | 95.5% |
| 10 | LIFESTYLE SOLAR ELECTRIC | 15 | 0 | 0.0% |
| 11 | FREEDOM FOREVER LLC | 13 | 12 | 92.3% |
| 12 | Bright Planet Solar | 9 | 2 | 22.2% |
| 13 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 9 | 5 | 55.6% |
| 14 | Current Home | 7 | 7 | 100.0% |
| 15 | SolarMax Renewable Energy Provider, Inc | 7 | 1 | 14.3% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 699 of Jurupa Valley’s 700 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (296, 42.3%) used modules recorded as Qcells.
In the last 24 months, 700 of Jurupa Valley’s 700 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (507, 72.4%) used inverters recorded as Enphase.
In the last 24 months, 383 of Jurupa Valley’s 700 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (204, 53.3%) used batteries recorded as Tesla.
569 of 580 battery-paired PG&E and SCE installs (98.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 296 | 1,001 |
| Canadian Solar | 126 | 275 | |
| LONGi | 119 | 238 | |
| JA Solar | 88 | 162 | |
| Silfab | 24 | not in top list | |
| Inverter maker | Enphase | 507 | 2,259 |
| Tesla | 167 | 255 | |
| SolarEdge | 71 | 858 | |
| Delta Electronics | 10 | 58 | |
| SunPower | 8 | 270 | |
| Battery maker | Tesla | 204 | 279 |
| Enphase | 96 | 132 | |
| FranklinWH | 55 | 59 | |
| SolarEdge | 26 | 48 | |
| LG | 2 | 45 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,568 of 3,768 installs, inverters on 3,768. See the methodology and the equipment index.
ZIP codes in Jurupa Valley
ZIP codes with their own page where the utilities recorded Jurupa Valley on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Jurupa Valley
The SGIP report lists 67 battery storage projects with the city Jurupa Valley, 38 with the status Paid ($270,780 in current incentive allocations, 569 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 38 | 569 | $270,780 |
| PBI in Process | 1 | 236 | $59,087 |
| Reserved | 7 | 305 | $140,749 |
| Waitlist | 1 | 13 | $29,487 |
| Cancelled | 17 | 277 | $171,355 |
| RRF Rejected | 3 | 26 | $4,581 |
Installers named on the most SGIP storage projects in Jurupa Valley
3 of the 67 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Jurupa Valley is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 3,768
- Last 24 months
- 700
- Capacity
- 22.2 MW DC
- Median system size
- 4.2 kW DC
- With battery storage
- 15.4% all time; 55.0% last 24 months
- Third-party owned
- 65.1% where reported
- Ownership types recorded
- PPA 2,047, lease 275, prepaid lease 1, other 64
- Median battery size
- 13.5 kWh
- Earliest install in data
- May 14, 2012
Common questions
How many homes in Jurupa Valley have solar?
3,768 residential solar systems in Jurupa Valley were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 700 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Jurupa Valley?
74 installer names have at least one install interconnected in Jurupa Valley in the last 24 months, and 243 appear in the full record.
How common are batteries with new solar in Jurupa Valley?
15.4% of the solar installs interconnected in Jurupa Valley include battery storage across all years, and 55.0% in the last 24 months (385 of 700).
How many solar installs in Jurupa Valley are under NEM 3.0?
842 of the 3,768 residential solar installs in Jurupa Valley (22.3% of the 3,768 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 54.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.