ACCELERATED ENVIRONMENTAL SERVICES INC

How many solar installs has ACCELERATED ENVIRONMENTAL SERVICES INC done in California, and which license number is on its installs?

ACCELERATED ENVIRONMENTAL SERVICES INC has 166 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Jun 20, 2024 to Apr 16, 2026), most of them in Kern County (72), Los Angeles County (19) and Riverside County (15). CSLB lists license 890769 (ACCELERATED ENVIRONMENTAL SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications A, expires Feb 28, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
166
Last 24 months
136
Total capacity
1,331.7 kW DC
Median system size
7.5 kW DC
With battery storage
98.8% all time; 99.3% last 24 months
Third-party owned
92.2% of 166 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
164 installs, latest Apr 16, 2026
Ownership types recorded
PPA 152, lease 1
Median battery size
5 kWh (65 installs list a capacity)
First install
Jun 20, 2024
Latest install
Apr 16, 2026
Counties
19
Utilities
PGE 107, SCE 59
CSLB license
890769

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20248281
20258281
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

164 of its 166 interconnected installs (98.8% of the 166 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.8% of those include battery storage. The latest Net Billing Tariff install was approved Apr 16, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.021.2%2 (100.0%)
Net Billing Tariff16498.8%162 (98.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 153 of ACCELERATED ENVIRONMENTAL SERVICES INC’s installs the utility recorded a third-party ownership type: PPA 152, lease 1, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches ACCELERATED ENVIRONMENTAL SERVICES INC exactly.

Third-party owner named on its installsInstalls
Everbright141
EnFin9
Goodleap2
Sunpower1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 122 of ACCELERATED ENVIRONMENTAL SERVICES INC’s 136 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (43, 35.2%) used modules recorded as VSUN (Vietnam Sunergy).

In the last 24 months, 136 of ACCELERATED ENVIRONMENTAL SERVICES INC’s 136 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (128, 94.1%) used inverters recorded as Enphase.

In the last 24 months, 114 of ACCELERATED ENVIRONMENTAL SERVICES INC’s 136 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (108, 94.7%) used batteries recorded as Enphase.

137 of 164 battery-paired PG&E and SCE installs (83.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVSUN (Vietnam Sunergy)4364
Qcells3738
Axitec3030
Mission Solar1818
SunPower1010
Inverter makerEnphase128158
SolarEdge1213
Qcells66
SunPower58
ABB33
Battery makerEnphase108130
Tesla44
SolarEdge22
LG11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 146 of 166 installs, inverters on 166. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
890769ACCELERATED ENVIRONMENTAL SERVICES INC (Corporation)CLEARA General Engineering ContractorFeb 7, 2007Feb 28, 2027166

License numbers are the ones the utilities recorded on the interconnection applications (166 of 166 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 890769. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Kern72
Los Angeles19
Riverside15
Tulare13
Tehama10
Kings8
Yuba7
Fresno4
Butte3
San Bernardino3
San Joaquin3
Santa Clara2
Colusa1
Contra Costa1
El Dorado1
San Mateo1
Solano1
Sutter1
Yolo1

Top cities

CityInstalls
Bakersfield63
Beaumont9
Lancaster9
Hanford6
Olivehurst5
Tulare5
Palmdale4
Tehama3
Visalia3
Corning2
Corona2
Jurupa Valley2
Kingsburg2
Los Molinos2
Oroville2

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
ACCELERATED ENVIRONMENTAL SERVICES INC166

Common questions

Where does ACCELERATED ENVIRONMENTAL SERVICES INC install solar?

Its installs are spread across 19 counties. The most are in Kern County (72 installs), followed by Los Angeles County (19).

How often does ACCELERATED ENVIRONMENTAL SERVICES INC install batteries with solar?

98.8% of its interconnected solar installs include battery storage across all years, and 99.3% in the last 24 months (135 of 136).

How many ACCELERATED ENVIRONMENTAL SERVICES INC installs are under NEM 3.0 (the Net Billing Tariff)?

164 of its 166 interconnected installs (98.8% of the 166 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 98.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.