Solar installers in Tulare County, California

Who installs the most solar in Tulare County?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Tulare County are Sunrun (2,535), Citadel Roofing and Solar (864) and LIFESTYLE SOLAR INC (628). They account for 4,027 of the 8,071 residential solar installs interconnected there in that window.

In all, 42,455 homes in Tulare County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 232 installers with installs in this window. 143 installs in the window were self-installed or had no installer recorded.

1Sunrun2,5357,308
2Citadel Roofing and Solar864893
3LIFESTYLE SOLAR INC6281,751
4BRIGHT OPS390474
5FREEDOM FOREVER LLC2691,209
6LIFESTYLE SOLAR ELECTRIC230238
7SOLAR NEGOTIATORS222604
8Empower Electric Solar187683
9GRID Alternatives1811,622
10BRATTON SOLAR INC149167
11Tesla Energy Operations (formerly SolarCity)1173,974
12Bright House Energy Construction115488
13BRYTON POWER LLC104109
14EXO Energy100142
15Divine Power USA77136
16SunPower691,804
17GAF Energy6060
18DISCOUNT CONSTRUCTION & ENGINEERING5354
19FREEDOM FOREVER NORTHERN CALIFORNIA LLC5353
20FREEDOM FOREVER SOUTHERN CALIFORNIA LLC5151
21JP ELECTRICAL SOLAR INC42641
22ALTSYS SOLAR INC41349
23MMC ELECTRIC INC3840
24DEMAND CONSTRUCTION3546
25ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING35574

Most installs, all time

1Sunrun7,3087,308
2Tesla Energy Operations (formerly SolarCity)3,9743,974
3Vivint Solar Developer, LLC2,6812,681
4SunPower1,8041,804
5LIFESTYLE SOLAR INC1,7511,751
6GRID Alternatives1,6221,622
7FREEDOM FOREVER LLC1,2091,209
8Citadel Roofing and Solar893893
9SOLGEN ELECTRIC715715
10Empower Electric Solar683683

Installs by year

YearInstalls interconnectedWith battery storage
20225,947175
20235,741416
20244,1802,675
20254,2443,255
2026 (through Aug 31, 2026)2,4041,578

Under the Net Billing Tariff (NEM 3.0)

10,285 of the 42,455 residential solar installs in Tulare County (24.2% of the 42,455 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.4% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Tulare County

1Sunrun3,4343,32096.7%
2Citadel Roofing and Solar88649055.3%
3LIFESTYLE SOLAR INC654456.9%
4BRIGHT OPS47440385.0%
5FREEDOM FOREVER LLC36734995.1%
6Empower Electric Solar31629292.4%
7SOLAR NEGOTIATORS27427299.3%
8LIFESTYLE SOLAR ELECTRIC23673.0%
9GRID Alternatives23013257.4%
10Bright Planet Solar2074019.3%
11SunPower2022210.9%
12BRATTON SOLAR INC1498456.4%
13Tesla Energy Operations (formerly SolarCity)12511491.2%
14Bright House Energy Construction11810.8%
15EXO Energy1138877.9%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Cities in Tulare County

CityAll-time installs
Visalia18,049
Tulare8,075
Porterville5,818
Dinuba2,596
Exeter1,483
Lindsay1,118
Woodlake879
Farmersville648
Goshen483
Orosi474
Springville447
Earlimart294
Strathmore289
Terra Bella264
Three Rivers262
Ivanhoe221
Pixley201
Cutler166
Kingsburg151
Tipton97

ZIP codes in Tulare County

ZIP codes with their own page where the utilities recorded Tulare County on at least 10% of the ZIP’s installs, through Aug 31, 2026.

932917,9657,9761,439
932747,9157,9181,817
932575,7915,7931,179
932925,1265,139970
932775,0585,060717
936182,5962,606492
932211,4831,486239
932471,1161,116176
93286877878251
9322364864898
9364747447498
9326544544581
9322733533526
9321929529758
9326729029058
9327026326449
9327126126163
9323522222334
9325620120146
9361516516551
937241221222
93272969619
93261757615
9324461627
93218595914
9235750501
9367333336
9320131346
9239111397

Equipment recorded

In the last 24 months, 7,996 of Tulare County’s 8,071 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (2,056, 25.7%) used modules recorded as Qcells.

In the last 24 months, 8,071 of Tulare County’s 8,071 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (3,480, 43.1%) used inverters recorded as Tesla.

In the last 24 months, 5,627 of Tulare County’s 8,071 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (3,439, 61.1%) used batteries recorded as Tesla.

7,960 of 8,340 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2,0567,750
JA Solar1,8445,123
LONGi1,3623,713
Canadian Solar1,0733,113
Trina Solar5091,636
Inverter makerTesla3,4804,193
SolarEdge2,69314,207
Enphase1,98413,300
Delta Electronics1651,185
Qcells141not in top list
Battery makerTesla3,4394,325
Enphase9321,355
SolarEdge766982
LG203812
FranklinWH139207

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 36,953 of 42,455 installs, inverters on 42,440. See the methodology and the equipment index.

SGIP battery storage projects in Tulare County

The SGIP public project report downloaded Nov 16, 2026 lists 342 battery storage projects in Tulare County with the status Paid, carrying $7,626,079 in current incentive allocations and 11,293 kWh of storage. Across every status it lists 795 storage projects there, 283 of them cancelled and 170 at another stage.

Status as publishedProjectsStorage kWhCurrent incentive
Paid34211,293$7,626,079
PBI in Process2033,943$13,101,691
Reserved9836,821$8,831,880
Pending Reservation10337$366,257
Waitlist32459$757,897
Cancelled28368,967$42,992,701
RRF Rejected10150$24,800

Installers named on the most SGIP storage projects in Tulare County

InstallerProjectsPaid
GRID Alternatives152125
RICHARD HEATH & ASSOCIATES INC7725
Sunrun7135
HAVEN ENERGY SERVICES INC4017
Tesla3311
Infinity Energy, Inc2615
Semper Solaris Construction Inc2516
LIFESTYLE SOLAR INC210
Tesla Energy Operations (formerly SolarCity)2118
SOLAR 4 AMERICA1411

179 of the 795 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

Electric utilities serving Tulare County (EIA)

EIA’s 2025 Service Territory file lists 2 utilities serving Tulare County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.

Utility (EIA name)Ownership (EIA)PV installationsResidentialPV capacity MWUnitPV-paired batteries
Pacific Gas & Electric Co.Investor Owned949,590924,8549,449.31AC178,468
Southern California Edison CoInvestor Owned746,002734,4526,267.868AC130,848

From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”

All California utilities in EIA’s net metering data.

SolarAPP+ automated permitting

Tulare County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

Solar contractor licenses in Tulare County

8 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Tulare County as the county: 6 with the business type Corporation, Limited Liability, Partnership or JointVenture and 2 Sole Owner. 5 C-10 Electrical licenses in Tulare County carry license numbers the utilities recorded on 10 or more residential solar records.

Solar contractor licenses in Tulare County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.

At a glance

Residential solar installs
42,455
Last 24 months
8,071
Capacity
323.7 MW DC
Median system size
6.6 kW DC
With battery storage
19.6% all time; 73.1% last 24 months
Third-party owned
50.2% where reported
Ownership types recorded
PPA 14,188, lease 4,817, prepaid lease 42, other 1,047
Median battery size
13.5 kWh
Earliest install in data
Jul 25, 2001

Common questions

How many homes in Tulare County have solar?

42,455 residential solar systems in Tulare County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 8,071 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Tulare County?

232 installer names have at least one install interconnected in Tulare County in the last 24 months, and 921 appear in the full record.

How common are batteries with new solar in Tulare County?

19.6% of the solar installs interconnected in Tulare County include battery storage across all years, and 73.1% in the last 24 months (5,903 of 8,071).

How many solar installs in Tulare County are under NEM 3.0?

10,285 of the 42,455 residential solar installs in Tulare County (24.2% of the 42,455 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.