Bright House Energy Construction

How many solar installs has Bright House Energy Construction done in California, and which license number is on its installs?

Bright House Energy Construction has 528 residential solar installs interconnected in California, active in the records from 2016 through 2026 (Sep 27, 2016 to Aug 31, 2026), most of them in Tulare County (488), Fresno County (13) and Kern County (12). CSLB lists license 1053671 (BRIGHT HOUSE ENERGY CONSTRUCTION INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires May 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to Bright House Energy Construction here carry more than one CSLB license number: 1053671 on 397 (CSLB holder BRIGHT HOUSE ENERGY CONSTRUCTION INC, Strathmore), 979642 on 90 (not found in the CSLB License Master file) and 99642 on 39 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
528
Last 24 months
123
Total capacity
4,797 kW DC
Median system size
8.5 kW DC
With battery storage
0.4% all time; 1.6% last 24 months
Third-party owned
0.0% of 528 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
125 installs, latest Aug 31, 2026
Ownership types recorded
none recorded
Median battery size
10 kWh (1 installs list a capacity)
First install
Sep 27, 2016
Latest install
Aug 31, 2026
Counties
7
Utilities
SCE 492, PGE 36
CSLB license
1053671, 979642, 99642

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2016 to 2026

YearInstalls interconnectedWith battery storage
201630
2017330
2018500
2019600
2020700
2021630
2022530
2023480
2024400
2025421
2026 (through Aug 31, 2026)661

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

125 of its 528 interconnected installs (23.7% of the 528 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.6% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0193.6%not counted
NEM 2.038472.7%0 (0.0%)
Net Billing Tariff12523.7%2 (1.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Bright House Energy Construction’s installs. No residential system in the file lists a third-party owner name that matches Bright House Energy Construction exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 123 of Bright House Energy Construction’s 123 installs name a module maker in the “Generator Manufacturer” fields, and most of those (97, 78.9%) used modules recorded as LONGi.

In the last 24 months, 123 of Bright House Energy Construction’s 123 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (122, 99.2%) used inverters recorded as Enphase.

In the last 24 months, 2 of Bright House Energy Construction’s 123 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (2, 100.0%) used batteries recorded as Enphase.

2 of 2 battery-paired PG&E and SCE installs (100.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi97152
Qcells864
LG6not in top list
Axitec483
Canadian Solar444
Inverter makerEnphase122392
Tesla18
Battery makerEnphase22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 521 of 528 installs, inverters on 528. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1053671BRIGHT HOUSE ENERGY CONSTRUCTION INC (Corporation)CLEARB General Building ContractorMay 16, 2019May 31, 2027397
979642Not found in the CSLB License Master file pulled Nov 4, 202690
99642Not found in the CSLB License Master file pulled Nov 4, 202639

License numbers are the ones the utilities recorded on the interconnection applications (526 of 528 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1053671. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Tulare488
Fresno13
Kern12
Kings8
San Bernardino5
Riverside1
San Joaquin1

Top cities

CityInstalls
Porterville225
Visalia86
Springville45
Exeter32
Tulare32
Lindsay16
Terra Bella15
Strathmore9
Bakersfield7
Pixley7
Three Rivers5
Apple Valley4
Hanford4
Orosi4
Sanger4

Names as recorded by the utilities

The utilities recorded this installer under 5 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
BRIGHT HOUSE ENERGY CONSTRUCTION INC397
Bright House Energy Construction103
BRIGHT HOUSE ENERGY CONSTRUCTION25
Bright House Energy Construction Inc2
Bright House Energy construction1

Common questions

Where does Bright House Energy Construction install solar?

Its installs are spread across 7 counties. The most are in Tulare County (488 installs), followed by Fresno County (13).

How often does Bright House Energy Construction install batteries with solar?

0.4% of its interconnected solar installs include battery storage across all years, and 1.6% in the last 24 months (2 of 123).

How many Bright House Energy Construction installs are under NEM 3.0 (the Net Billing Tariff)?

125 of its 528 interconnected installs (23.7% of the 528 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 1.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.