Solar installers in Tulare, California

Most installs here are in Tulare County.

Who installs the most solar in Tulare?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Tulare are Sunrun (638), Citadel Roofing and Solar (429) and LIFESTYLE SOLAR INC (150). They account for 1,217 of the 1,826 residential solar installs interconnected there in that window.

In all, 8,077 homes in Tulare have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 105 installers with installs in this window. 24 installs in the window were self-installed or had no installer recorded.

1Sunrun6381,622
2Citadel Roofing and Solar429440
3LIFESTYLE SOLAR INC150492
4BRIGHT OPS7494
5SOLAR NEGOTIATORS38105
6FREEDOM FOREVER LLC36246
7LIFESTYLE SOLAR ELECTRIC3539
8Tesla Energy Operations (formerly SolarCity)29794
9EXO Energy2733
10Empower Electric Solar24134
11DISCOUNT CONSTRUCTION & ENGINEERING1717
12SunPower17336
13BRYTON POWER LLC1517
14GRID Alternatives15132
15ALTSYS SOLAR INC14109
16BETTER EARTH ELECTRIC INC1367
17Sunergy Solar Inc.1313
18LUMIO HX INC1247
19DEMAND CONSTRUCTION1012
20AXIA SOLAR CORP77
21ACCELERATED ENVIRONMENTAL SERVICES INC55
22Air Sun Inc571
23Bright House Energy Construction532
24FREEDOM FOREVER NORTHERN CALIFORNIA LLC55
25FREEDOM FOREVER SOUTHERN CALIFORNIA LLC55

Most installs, all time

1Sunrun1,6221,622
2Tesla Energy Operations (formerly SolarCity)794794
3LIFESTYLE SOLAR INC492492
4Vivint Solar Developer, LLC490490
5Citadel Roofing and Solar440440
6SunPower336336
7FREEDOM FOREVER LLC246246
8SunStreet Energy Group LLC165165
9ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING150150
10SOLGEN ELECTRIC146146

Installs by year

YearInstalls interconnectedWith battery storage
20221,00217
20231,18073
20241,038655
2025943772
2026 (through Aug 31, 2026)481348

Under the Net Billing Tariff (NEM 3.0)

2,388 of the 8,077 residential solar installs in Tulare (29.6% of the 8,077 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.5% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Tulare

1Sunrun88985996.6%
2Citadel Roofing and Solar43927963.6%
3LIFESTYLE SOLAR INC1522013.2%
4BRIGHT OPS948287.2%
5SunPower9144.4%
6FREEDOM FOREVER LLC625995.2%
7Empower Electric Solar524688.5%
8SOLAR NEGOTIATORS4949100.0%
9LIFESTYLE SOLAR ELECTRIC3912.6%
10LUMIO HX INC3825.3%
11Tesla Energy Operations (formerly SolarCity)333090.9%
12EXO Energy292275.9%
13Bright Planet Solar27725.9%
14BETTER EARTH ELECTRIC INC242395.8%
15GRID Alternatives201575.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 1,824 of Tulare’s 1,826 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (526, 28.8%) used modules recorded as JA Solar.

In the last 24 months, 1,826 of Tulare’s 1,826 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (928, 50.8%) used inverters recorded as Tesla.

In the last 24 months, 1,368 of Tulare’s 1,826 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (893, 65.3%) used batteries recorded as Tesla.

1,854 of 1,906 battery-paired PG&E and SCE installs (97.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerJA Solar5261,267
Qcells3741,460
LONGi349898
Canadian Solar233548
Trina Solar118288
Inverter makerTesla9281,068
SolarEdge5962,674
Enphase3402,343
Delta Electronics41324
Qcells27not in top list
Battery makerTesla8931,045
Enphase170245
SolarEdge124171
LG122307
FranklinWH2833

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,188 of 8,077 installs, inverters on 8,074. See the methodology and the equipment index.

ZIP codes in Tulare

ZIP codes with their own page where the utilities recorded Tulare on at least 10% of the ZIP’s installs, through Aug 31, 2026.

932747,9037,9181,817
937241221222

SGIP battery storage projects in Tulare

The SGIP report lists 115 battery storage projects with the city Tulare, 56 with the status Paid ($2,537,944 in current incentive allocations, 3,485 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid563,485$2,537,944
PBI in Process31,686$456,300
Reserved2414,383$1,104,005
Pending Reservation111$1,716
Waitlist798$148,279
Cancelled2415,846$8,801,314

Installers named on the most SGIP storage projects in Tulare

InstallerProjectsPaid
GRID Alternatives1515
LIFESTYLE SOLAR INC130
HAVEN ENERGY SERVICES INC106
Sunrun73
APOLLO HOME POWER LLC51
SOLAR 4 AMERICA52
PetersenDean42
Tesla44
ALTSYS SOLAR INC33
FREEDOM FOREVER LLC33

26 of the 115 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Tulare is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
8,077
Last 24 months
1,826
Capacity
59.1 MW DC
Median system size
6.3 kW DC
With battery storage
23.6% all time; 76.6% last 24 months
Third-party owned
51.2% where reported
Ownership types recorded
PPA 2,722, lease 1,096, prepaid lease 8, other 93
Median battery size
13.5 kWh
Earliest install in data
Oct 11, 2001

Common questions

How many homes in Tulare have solar?

8,077 residential solar systems in Tulare were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,826 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Tulare?

105 installer names have at least one install interconnected in Tulare in the last 24 months, and 373 appear in the full record.

How common are batteries with new solar in Tulare?

23.6% of the solar installs interconnected in Tulare include battery storage across all years, and 76.6% in the last 24 months (1,399 of 1,826).

How many solar installs in Tulare are under NEM 3.0?

2,388 of the 8,077 residential solar installs in Tulare (29.6% of the 8,077 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 74.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.