FREEDOM FOREVER NORTHERN CALIFORNIA LLC

How many solar installs has FREEDOM FOREVER NORTHERN CALIFORNIA LLC done in California, and which license number is on its installs?

FREEDOM FOREVER NORTHERN CALIFORNIA LLC has 533 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Oct 9, 2024 to Aug 12, 2026), most of them in Contra Costa County (78), Fresno County (78) and Tulare County (53). The license number recorded on most of its installs, 1125479, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
533
Last 24 months
533
Total capacity
3,999.3 kW DC
Median system size
6.9 kW DC
With battery storage
97.2% all time; 97.2% last 24 months
Third-party owned
82.4% of 533 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
524 installs, latest Jul 7, 2026
Ownership types recorded
PPA 285, lease 154
Median battery size
9.7 kWh (500 installs list a capacity)
First install
Oct 9, 2024
Latest install
Aug 12, 2026
Counties
43
Utilities
PGE 469, SCE 64
CSLB license
1125479

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
202464
2025522510
2026 (through Aug 31, 2026)54

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

524 of its 533 interconnected installs (98.3% of the 533 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.5% of those include battery storage. The latest Net Billing Tariff install was approved Jul 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.091.7%7 (77.8%)
Net Billing Tariff52498.3%511 (97.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 439 of FREEDOM FOREVER NORTHERN CALIFORNIA LLC’s installs the utility recorded a third-party ownership type: PPA 285, lease 154, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches FREEDOM FOREVER NORTHERN CALIFORNIA LLC exactly.

Third-party owner named on its installsInstalls
EnFin302
Goodleap66
Sunrun33
Good Leap24
Everbright5

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 451 of FREEDOM FOREVER NORTHERN CALIFORNIA LLC’s 533 installs name a module maker in the “Generator Manufacturer” fields, and most of those (311, 69.0%) used modules recorded as Qcells.

In the last 24 months, 533 of FREEDOM FOREVER NORTHERN CALIFORNIA LLC’s 533 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (354, 66.4%) used inverters recorded as SolarEdge.

In the last 24 months, 452 of FREEDOM FOREVER NORTHERN CALIFORNIA LLC’s 533 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (293, 64.8%) used batteries recorded as SolarEdge.

451 of 518 battery-paired PG&E and SCE installs (87.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells311311
Trina Solar113113
JA Solar1414
SunPower1212
Canadian Solar99
Inverter makerSolarEdge354354
Tesla172172
Enphase5454
SunPower1111
SMA77
Battery makerSolarEdge293293
Tesla147147
Enphase1313
Schneider Electric11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 451 of 533 installs, inverters on 533. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names FREEDOM FOREVER NORTHERN CALIFORNIA LLC as developer on 0 battery storage projects and as installer on 1 (0 name it as both), 1 projects in all with 13 kWh of storage. 1 have the status Paid, with $1,980 in current incentive allocations. Applications were received from Mar 4, 2025 to Mar 4, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid113$1,980

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage113$1,9801$1,980

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1125479Not found in the CSLB License Master file pulled Nov 4, 2026533

License numbers are the ones the utilities recorded on the interconnection applications (533 of 533 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list FREEDOM FOREVER NORTHERN CALIFORNIA LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202420252026Total
City and County of San Francisco1125479422632

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Contra Costa78
Fresno78
Tulare53
Kern42
Santa Clara40
Solano40
San Joaquin21
Alameda20
San Mateo17
Yolo17
Tehama16
Merced11
Sonoma9
Kings8
Madera8
Humboldt7
Butte6
Lake6
Shasta6
El Dorado5
San Luis Obispo5
Monterey4
Colusa3
Glenn3
Placer3
San Bernardino3
Santa Cruz3
Mendocino2
Mono2
Napa2
Sutter2
Yuba2
Amador1
Calaveras1
Los Angeles1
Marin1
Nevada1
Riverside1
San Benito1
San Francisco1
Santa Barbara1
Stanislaus1
Tuolumne1

Top cities

CityInstalls
Fresno43
Bakersfield35
Antioch25
Visalia23
San Jose22
Clovis15
Vallejo13
Vacaville12
Porterville11
Fairfield10
Oakley10
Stockton10
Corning8
Richmond8
Brentwood6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FREEDOM FOREVER NORTHERN CALIFORNIA LLC533

Common questions

Where does FREEDOM FOREVER NORTHERN CALIFORNIA LLC install solar?

Its installs are spread across 43 counties. The most are in Contra Costa County (78 installs), followed by Fresno County (78).

How often does FREEDOM FOREVER NORTHERN CALIFORNIA LLC install batteries with solar?

97.2% of its interconnected solar installs include battery storage across all years, and 97.2% in the last 24 months (518 of 533).

How many FREEDOM FOREVER NORTHERN CALIFORNIA LLC installs are under NEM 3.0 (the Net Billing Tariff)?

524 of its 533 interconnected installs (98.3% of the 533 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.