Who installs the most solar in Stanislaus County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Stanislaus County are Sunrun (322), SIG SOLAR, S.I.G. (129) and Citadel Roofing and Solar (98). They account for 549 of the 958 residential solar installs interconnected there in that window.
In all, 6,551 homes in Stanislaus County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 87 installers with installs in this window. 29 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 322 | 832 |
| 2 | SIG SOLAR, S.I.G. | 129 | 618 |
| 3 | Citadel Roofing and Solar | 98 | 128 |
| 4 | BRIGHT OPS | 52 | 65 |
| 5 | POWER UP SOLUTIONS LLC | 27 | 27 |
| 6 | ALLEN ELECTRIC INC | 23 | 77 |
| 7 | Empower Electric Solar | 23 | 73 |
| 8 | Tesla Energy Operations (formerly SolarCity) | 22 | 630 |
| 9 | BETTER EARTH ELECTRIC INC | 17 | 39 |
| 10 | FREEDOM FOREVER LLC | 14 | 132 |
| 11 | V3 Electric | 12 | 34 |
| 12 | Mid-State Solar | 10 | 110 |
| 13 | RADIUS ENERGY | 10 | 10 |
| 14 | Momentum Solar | 8 | 38 |
| 15 | SKYLINE SMART ENERGY | 8 | 30 |
| 16 | Citadel | 7 | 7 |
| 17 | FIVE STAR SOLAR | 7 | 23 |
| 18 | RODRIGUEZ BROS ELECTRIC | 7 | 9 |
| 19 | Semper Solaris Construction Inc | 7 | 37 |
| 20 | SENGA ENERGY LLC | 7 | 15 |
| 21 | Sunlectric | 6 | 152 |
| 22 | American Array Solar | 5 | 102 |
| 23 | Masellis Electric & Solar, Inc. | 5 | 56 |
| 24 | POWUR HOME CONSTRUCTION | 5 | 5 |
| 25 | 1st Light Energy Inc | 4 | 201 |
Most installs, all time
| 1 | Sunrun | 832 | 832 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 630 | 630 |
| 3 | SIG SOLAR, S.I.G. | 618 | 618 |
| 4 | Vivint Solar Developer, LLC | 494 | 494 |
| 5 | 1st Light Energy Inc | 201 | 201 |
| 6 | Sunlectric | 152 | 152 |
| 7 | SOLAR INSTALLATION GROUP, INC. | 141 | 141 |
| 8 | FREEDOM FOREVER LLC | 132 | 132 |
| 9 | Citadel Roofing and Solar | 128 | 128 |
| 10 | Mid-State Solar | 110 | 110 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 667 | 28 |
| 2023 | 697 | 79 |
| 2024 | 583 | 324 |
| 2025 | 524 | 375 |
| 2026 (through Aug 31, 2026) | 261 | 171 |
Under the Net Billing Tariff (NEM 3.0)
1,040 of the 6,551 residential solar installs in Stanislaus County (15.9% of the 6,551 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Stanislaus County
| 1 | Sunrun | 347 | 340 | 98.0% |
| 2 | SIG SOLAR, S.I.G. | 150 | 138 | 92.0% |
| 3 | BRIGHT OPS | 65 | 60 | 92.3% |
| 4 | Empower Electric Solar | 57 | 53 | 93.0% |
| 5 | Citadel Roofing and Solar | 31 | 0 | 0.0% |
| 6 | POWER UP SOLUTIONS LLC | 25 | 25 | 100.0% |
| 7 | BETTER EARTH ELECTRIC INC | 24 | 23 | 95.8% |
| 8 | V3 Electric | 23 | 22 | 95.7% |
| 9 | Tesla Energy Operations (formerly SolarCity) | 22 | 20 | 90.9% |
| 10 | WESTERN VALLEY DEVELOPMENT INC | 22 | 4 | 18.2% |
| 11 | SKYLINE SMART ENERGY | 20 | 18 | 90.0% |
| 12 | FREEDOM FOREVER LLC | 19 | 17 | 89.5% |
| 13 | Bright Planet Solar | 12 | 2 | 16.7% |
| 14 | NORTH VALLEY LLC | 12 | 12 | 100.0% |
| 15 | GLOBAL ENERGY LLC | 10 | 10 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Stanislaus County
| City | All-time installs |
|---|---|
| Oakdale | 3,360 |
| Riverbank | 1,624 |
| Newman | 1,289 |
| La Grange | 141 |
| Grayson | 39 |
| Patterson | 23 |
| Modesto | 15 |
| Westley | 15 |
| Knights Ferry | 13 |
| Crows Landing | 6 |
| Farmington | 6 |
| Valley Home | 4 |
| Escalon | 3 |
| Vernalis | 3 |
| Waterford | 2 |
| Denair | 1 |
| Manteca | 1 |
| Twain Harte | 1 |
ZIP codes in Stanislaus County
ZIP codes with their own page where the utilities recorded Stanislaus County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
Equipment recorded
In the last 24 months, 874 of Stanislaus County’s 958 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (239, 27.3%) used modules recorded as Silfab.
In the last 24 months, 958 of Stanislaus County’s 958 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (427, 44.6%) used inverters recorded as Enphase.
In the last 24 months, 484 of Stanislaus County’s 958 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (266, 55.0%) used batteries recorded as Tesla.
798 of 1,016 battery-paired PG&E and SCE installs (78.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Silfab | 239 | 612 |
| JA Solar | 228 | 416 | |
| Qcells | 210 | 1,234 | |
| LONGi | 79 | 358 | |
| Canadian Solar | 37 | 436 | |
| Inverter maker | Enphase | 427 | 2,358 |
| Tesla | 406 | 531 | |
| SolarEdge | 188 | 2,172 | |
| FranklinWH | 43 | not in top list | |
| APsystems (Altenergy Power System) | 28 | not in top list | |
| Battery maker | Tesla | 266 | 360 |
| Enphase | 100 | 195 | |
| SolarEdge | 67 | 113 | |
| FranklinWH | 42 | 71 | |
| EcoFlow | 6 | 6 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 6,022 of 6,551 installs, inverters on 6,551. See the methodology and the equipment index.
SGIP battery storage projects in Stanislaus County
The SGIP public project report downloaded Nov 16, 2026 lists 59 battery storage projects in Stanislaus County with the status Paid, carrying $298,219 in current incentive allocations and 863 kWh of storage. Across every status it lists 301 storage projects there, 83 of them cancelled and 159 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 59 | 863 | $298,219 |
| Reserved | 116 | 1,639 | $3,422,354 |
| Pending Reservation | 14 | 187 | $271,045 |
| Waitlist | 19 | 251 | $275,880 |
| Cancelled | 83 | 1,401 | $1,472,300 |
| RRF Rejected | 10 | 153 | $23,003 |
Installers named on the most SGIP storage projects in Stanislaus County
106 of the 301 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Stanislaus County (EIA)
EIA’s 2025 Service Territory file lists 4 utilities serving Stanislaus County. 3 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
| Modesto Irrigation District | Political Subdivision | 12,254 | 11,986 | 95.713 | AC | 1,175 |
| Turlock Irrigation District | Political Subdivision | 5,613 | 5,415 | 71.514 | AC | 0 |
Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Stanislaus County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Stanislaus County
16 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Stanislaus County as the county: 13 with the business type Corporation, Limited Liability, Partnership or JointVenture and 3 Sole Owner. 11 C-10 Electrical licenses in Stanislaus County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Stanislaus County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 6,551
- Last 24 months
- 958
- Capacity
- 52 MW DC
- Median system size
- 7.1 kW DC
- With battery storage
- 15.5% all time; 68.8% last 24 months
- Third-party owned
- 31.2% where reported
- Ownership types recorded
- PPA 1,721, lease 285, prepaid lease 5, other 31
- Median battery size
- 13.5 kWh
- Earliest install in data
- Sep 19, 2002
Common questions
How many homes in Stanislaus County have solar?
6,551 residential solar systems in Stanislaus County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 958 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Stanislaus County?
87 installer names have at least one install interconnected in Stanislaus County in the last 24 months, and 464 appear in the full record.
How common are batteries with new solar in Stanislaus County?
15.5% of the solar installs interconnected in Stanislaus County include battery storage across all years, and 68.8% in the last 24 months (659 of 958).
How many solar installs in Stanislaus County are under NEM 3.0?
1,040 of the 6,551 residential solar installs in Stanislaus County (15.9% of the 6,551 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.