1st Light Energy Inc

How many solar installs has 1st Light Energy Inc done in California, and which license number is on its installs?

1st Light Energy Inc has 2,615 residential solar installs interconnected in California, active in the records from 2007 through 2026 (Mar 22, 2007 to May 13, 2026), most of them in San Joaquin County (478), Kern County (432) and San Bernardino County (291). The license number recorded on most of its installs, 921371, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
2,615
Last 24 months
7
Total capacity
17,580.2 kW DC
Median system size
6.1 kW DC
With battery storage
1.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 14.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
1.0% of 2,552 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
13 installs, latest Mar 3, 2025
Ownership types recorded
PPA 22, lease 3
Median battery size
9.8 kWh (10 installs list a capacity)
First install
Mar 22, 2007
Latest install
May 13, 2026
Counties
43
Utilities
PGE 1,861, SCE 713, SDGE 41
CSLB license
921371

Is 1st Light Energy Inc still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (1 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2007 to 2026

YearInstalls interconnectedWith battery storage
2007140
2008330
2009200
2010110
201130
2012480
2013660
20141590
20152760
20163390
20174650
20185665
20192069
20201055
20211634
2022862
2023351
2024186
202510
2026 (through Aug 31, 2026)10

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

13 of its 2,615 interconnected installs (0.5% of the 2,615 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.5% of those include battery storage. The latest Net Billing Tariff install was approved Mar 3, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.01,04039.8%not counted
NEM 2.01,56259.7%27 (1.8%)
Net Billing Tariff130.5%5 (38.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 25 of 1st Light Energy Inc’s installs the utility recorded a third-party ownership type: PPA 22, lease 3, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches 1st Light Energy Inc exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
ORE Developer Corporate Entity18
NRG Suncap LLC3
SunRun2
1st Light Energy1
ORE Developer Corproate Entity1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 6 of 1st Light Energy Inc’s 7 installs name a module maker in the “Generator Manufacturer” fields, and most of those (6, 100.0%) used modules recorded as VSUN (Vietnam Sunergy).

In the last 24 months, 7 of 1st Light Energy Inc’s 7 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 57.1%) used inverters recorded as GoodWe Technologies Co., Ltd..

In the last 24 months, 1 of 1st Light Energy Inc’s 7 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used batteries recorded as FranklinWH.

25 of 32 battery-paired PG&E and SCE installs (78.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerVSUN (Vietnam Sunergy)6not in top list
Inverter makerGoodWe Technologies Co., Ltd.4not in top list
Solis (Ginlong)262
Enphase1280
FranklinWH1not in top list
Fronius1200
Battery makerFranklinWH14

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,415 of 2,615 installs, inverters on 2,614. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names 1st Light Energy Inc as developer on 33 battery storage projects and as installer on 33 (33 name it as both), 33 projects in all with 333 kWh of storage. 23 have the status Paid, with $71,013 in current incentive allocations. Applications were received from Jan 15, 2018 to Jun 2, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid23237$71,013
Reserved113$12,250
Cancelled982$41,627

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage28277$61,99421$51,249
Equity Resiliency330$29,6462$19,764
Residential Solar and Storage Equity - Ratepayer113$12,2500$0
Residential Storage Equity113$21,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
921371Not found in the CSLB License Master file pulled Nov 4, 20262,447

License numbers are the ones the utilities recorded on the interconnection applications (2,452 of 2,615 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list 1st Light Energy Inc’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2018201920202022202320242025Total
City and County of San Francisco921371011142211
unincorporated San Diego County9213711060000016

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Joaquin478
Kern432
San Bernardino291
Stanislaus201
Tulare193
Fresno183
Kings123
Merced96
Contra Costa84
Calaveras67
Lake55
Orange54
Yuba40
Alameda34
San Diego32
Madera28
Tuolumne28
Santa Clara27
Riverside26
Los Angeles25
Ventura21
Placer17
Solano11
El Dorado9
Amador7
Sutter7
Colusa6
San Mateo6
Mariposa5
Nevada5
Yolo5
Monterey3
Tehama3
Butte2
Napa2
San Francisco2
Humboldt1
Mendocino1
Sacramento1
San Benito1
Santa Barbara1
Santa Cruz1
Sonoma1

Top cities

CityInstalls
Bakersfield247
Stockton186
Oakdale141
Manteca131
Fresno101
Apple Valley97
Hanford81
Visalia70
Victorville64
Porterville61
Wasco54
Helendale51
Tracy51
Merced50
Riverbank44

Names as recorded by the utilities

The utilities recorded this installer under 20 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
1st Light Energy Inc691
1st Light Energy685
1ST LIGHT ENERGY INC638
1st Light Energy Inc.506
1ST LIGHT ENERGY54
1st Light Energy, Inc.20
1st Light Energy inc3
1st light energy2
1st light Energy2
1st light energy inc.2
1st Light Energy inc.2
1st. Light Energy Inc.2
1st Light energy1
1st LIght Energy1
1st light energy inc1
1st light energy Inc1
1St Light energy Inc.1
1st Light Energy, Inc1
1st Light Energy., Inc1
1St. Light Energy1

Common questions

Where does 1st Light Energy Inc install solar?

Its installs are spread across 43 counties. The most are in San Joaquin County (478 installs), followed by Kern County (432).

How often does 1st Light Energy Inc install batteries with solar?

1.2% of its interconnected solar installs include battery storage across all years, and 14.3% in the last 24 months (1 of 7). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many 1st Light Energy Inc installs are under NEM 3.0 (the Net Billing Tariff)?

13 of its 2,615 interconnected installs (0.5% of the 2,615 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 38.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.