Solar installers in Orange County, California
Who installs the most solar in Orange County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Orange County are Sunrun (3,786), Tesla Energy Operations (formerly SolarCity) (1,303) and ORANGE COUNTY CONTRACTING SERVICES (664). They account for 5,753 of the 16,817 residential solar installs interconnected there in that window.
In all, 133,331 homes in Orange County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 713 installers with installs in this window. 447 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 3,786 | 14,331 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,303 | 17,179 |
| 3 | ORANGE COUNTY CONTRACTING SERVICES | 664 | 1,568 |
| 4 | SUNNOVA ENERGY CORPORATION | 506 | 1,534 |
| 5 | FREEDOM FOREVER LLC | 504 | 2,136 |
| 6 | GAF Energy | 501 | 536 |
| 7 | SOLARA HOME ENERGY LLC | 438 | 442 |
| 8 | SunPower | 436 | 9,539 |
| 9 | BRIGHT OPS | 427 | 491 |
| 10 | SWSS ELECTRICAL | 282 | 1,256 |
| 11 | INFINITY SOLAR | 254 | 640 |
| 12 | ECOSOLAR USA ELECTRICAL LLC | 204 | 617 |
| 13 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 189 | 246 |
| 14 | Aikyum Solar | 188 | 697 |
| 15 | Solar Optimum Inc. | 181 | 1,354 |
| 16 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 177 | 999 |
| 17 | Complete Solar | 170 | 567 |
| 18 | Semper Solaris Construction Inc | 169 | 2,146 |
| 19 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 166 | 166 |
| 20 | SOLAR TECH ENERGY SYSTEMS INC | 140 | 426 |
| 21 | AXIA SOLAR CORP | 133 | 138 |
| 22 | SolarMax Renewable Energy Provider, Inc | 132 | 1,529 |
| 23 | Bright Planet Solar | 127 | 1,710 |
| 24 | AMECO SOLAR LLC | 112 | 511 |
| 25 | Freedom Solar Co | 108 | 476 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 17,179 | 17,179 |
| 2 | Sunrun | 14,331 | 14,331 |
| 3 | SunPower | 9,539 | 9,539 |
| 4 | Vivint Solar Developer, LLC | 4,073 | 4,073 |
| 5 | Semper Solaris Construction Inc | 2,146 | 2,146 |
| 6 | FREEDOM FOREVER LLC | 2,136 | 2,136 |
| 7 | Bright Planet Solar | 1,710 | 1,710 |
| 8 | Verengo | 1,656 | 1,656 |
| 9 | ORANGE COUNTY CONTRACTING SERVICES | 1,568 | 1,568 |
| 10 | SUNNOVA ENERGY CORPORATION | 1,534 | 1,534 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 15,223 | 1,952 |
| 2023 | 19,814 | 2,488 |
| 2024 | 9,079 | 4,091 |
| 2025 | 8,376 | 5,469 |
| 2026 (through Aug 31, 2026) | 5,878 | 4,209 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Under the Net Billing Tariff (NEM 3.0)
19,618 of the 133,331 residential solar installs in Orange County (14.7% of the 133,285 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.9% of those on PG&E and SCE records include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Orange County
| 1 | Sunrun | 4,774 | 3,665 | 89.2% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,500 | 1,217 | 92.9% |
| 3 | ORANGE COUNTY CONTRACTING SERVICES | 665 | 640 | 96.2% |
| 4 | FREEDOM FOREVER LLC | 654 | 613 | 93.7% |
| 5 | GAF Energy | 513 | 442 | 91.5% |
| 6 | SUNNOVA ENERGY CORPORATION | 507 | 353 | 69.6% |
| 7 | BRIGHT OPS | 491 | 467 | 95.1% |
| 8 | SWSS ELECTRICAL | 449 | 180 | 40.1% |
| 9 | SOLARA HOME ENERGY LLC | 442 | 7 | 1.6% |
| 10 | SunPower | 421 | 164 | 42.5% |
| 11 | INFINITY SOLAR | 288 | 258 | 89.6% |
| 12 | ECOSOLAR USA ELECTRICAL LLC | 252 | 41 | 16.3% |
| 13 | Bright Planet Solar | 233 | 40 | 48.2% |
| 14 | Solar Optimum Inc. | 232 | 167 | 83.5% |
| 15 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 219 | 198 | 95.7% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Orange County
| City | All-time installs |
|---|---|
| Irvine | 16,422 |
| Santa Ana | 7,547 |
| Huntington Beach | 7,478 |
| Mission Viejo | 6,952 |
| Ramona | 6,287 |
| Orange | 6,197 |
| San Clemente | 5,743 |
| Yorba Linda | 5,691 |
| Fullerton | 5,561 |
| Garden Grove | 5,231 |
| Lake Forest | 4,825 |
| Laguna Niguel | 4,055 |
| Buena Park | 3,583 |
| Tustin | 3,152 |
| Placentia | 3,119 |
| Westminster | 3,045 |
| Costa Mesa | 3,021 |
| Fountain Valley | 2,874 |
| San Juan Capo | 2,608 |
| Cypress | 2,497 |
ZIP codes in Orange County
ZIP codes with their own page where the utilities recorded Orange County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 92618 | 7,443 | 7,447 | 1,551 |
| 92065 | 6,287 | 6,288 | 475 |
| 92630 | 4,534 | 4,538 | 470 |
| 92677 | 4,057 | 4,059 | 268 |
| 92886 | 4,051 | 4,053 | 436 |
| 92679 | 3,796 | 3,799 | 382 |
| 92691 | 3,544 | 3,547 | 419 |
| 92673 | 3,409 | 3,409 | 246 |
| 92692 | 3,404 | 3,406 | 348 |
| 92870 | 3,109 | 3,110 | 415 |
| 92683 | 3,040 | 3,046 | 496 |
| 92646 | 2,978 | 2,979 | 418 |
| 92620 | 2,956 | 2,956 | 270 |
| 92708 | 2,868 | 2,874 | 407 |
| 92705 | 2,816 | 2,820 | 349 |
| 92675 | 2,607 | 2,939 | 226 |
| 90630 | 2,422 | 2,424 | 329 |
| 92867 | 2,409 | 2,410 | 274 |
| 90631 | 2,403 | 2,837 | 452 |
| 92672 | 2,334 | 2,334 | 201 |
| 90620 | 2,332 | 2,336 | 262 |
| 92688 | 2,284 | 2,284 | 249 |
| 92602 | 2,280 | 2,281 | 296 |
| 92869 | 2,080 | 2,080 | 280 |
| 92821 | 2,078 | 2,082 | 221 |
| 92647 | 1,981 | 1,983 | 292 |
| 92833 | 1,927 | 1,931 | 245 |
| 92626 | 1,808 | 1,809 | 227 |
| 92835 | 1,797 | 1,798 | 287 |
| 92840 | 1,648 | 1,648 | 303 |
| 92887 | 1,626 | 1,627 | 221 |
| 92782 | 1,615 | 1,616 | 129 |
| 92694 | 1,555 | 4,979 | 743 |
| 92656 | 1,541 | 1,585 | 208 |
| 92780 | 1,521 | 1,524 | 252 |
| 90720 | 1,509 | 1,510 | 196 |
| 92704 | 1,488 | 1,491 | 191 |
| 92649 | 1,339 | 1,342 | 192 |
| 92629 | 1,302 | 1,302 | 121 |
| 90621 | 1,246 | 1,247 | 144 |
| 92627 | 1,210 | 1,211 | 154 |
| 92841 | 1,195 | 1,195 | 199 |
| 92648 | 1,171 | 1,173 | 214 |
| 92831 | 1,169 | 1,169 | 154 |
| 92651 | 1,159 | 1,160 | 173 |
| 92660 | 1,076 | 1,090 | 171 |
| 92843 | 1,031 | 1,032 | 208 |
| 92706 | 1,024 | 1,025 | 147 |
| 92865 | 992 | 993 | 132 |
| 92004 | 976 | 976 | 69 |
| 92604 | 901 | 901 | 119 |
| 92707 | 896 | 896 | 121 |
| 92845 | 878 | 878 | 118 |
| 90680 | 856 | 859 | 137 |
| 92610 | 853 | 853 | 87 |
| 90623 | 841 | 842 | 104 |
| 90740 | 812 | 812 | 102 |
| 92603 | 798 | 800 | 115 |
| 92703 | 743 | 744 | 106 |
| 92861 | 687 | 689 | 94 |
| 92832 | 662 | 662 | 81 |
| 92625 | 589 | 592 | 128 |
| 92606 | 583 | 584 | 73 |
| 92701 | 571 | 571 | 87 |
| 92617 | 565 | 566 | 122 |
| 92663 | 487 | 487 | 119 |
| 92844 | 476 | 476 | 85 |
| 92653 | 463 | 2,412 | 205 |
| 92614 | 461 | 461 | 64 |
| 92804 | 442 | 444 | 62 |
| 92868 | 418 | 419 | 39 |
| 92624 | 391 | 407 | 42 |
| 92823 | 381 | 382 | 40 |
| 92657 | 369 | 369 | 48 |
| 92612 | 340 | 340 | 62 |
| 92866 | 316 | 317 | 43 |
| 92676 | 184 | 185 | 48 |
| 92637 | 183 | 183 | 27 |
| 92655 | 158 | 158 | 33 |
| 92661 | 124 | 124 | 26 |
| 92662 | 66 | 69 | 15 |
| 92623 | 59 | 59 | 0 |
| 92678 | 36 | 36 | 2 |
| 92807 | 32 | 32 | 6 |
| 92709 | 28 | 28 | 0 |
Equipment recorded
In the last 24 months, 16,415 of Orange County’s 16,817 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6,404, 39.0%) used modules recorded as Qcells.
In the last 24 months, 16,771 of Orange County’s 16,817 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (7,254, 43.3%) used inverters recorded as Tesla.
In the last 24 months, 10,961 of Orange County’s 16,817 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (7,891, 72.0%) used batteries recorded as Tesla.
20,378 of 21,212 battery-paired PG&E and SCE installs (96.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 6,404 | 25,687 |
| LONGi | 1,632 | 5,372 | |
| JA Solar | 1,407 | 4,289 | |
| Silfab | 1,285 | not in top list | |
| REC | 1,269 | 7,903 | |
| Inverter maker | Tesla | 7,254 | 9,827 |
| Enphase | 6,536 | 44,981 | |
| SolarEdge | 2,519 | 41,334 | |
| Delta Electronics | 270 | 3,054 | |
| SunPower | 225 | 11,264 | |
| Battery maker | Tesla | 7,891 | 12,609 |
| Enphase | 1,613 | 2,941 | |
| SolarEdge | 805 | 1,074 | |
| FranklinWH | 362 | 409 | |
| LG | 137 | 2,603 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 113,169 of 133,331 installs, inverters on 132,333. See the methodology and the equipment index.
SGIP battery storage projects in Orange County
The SGIP public project report downloaded Nov 16, 2026 lists 3,462 battery storage projects in Orange County with the status Paid, carrying $59,301,433 in current incentive allocations and 112,354 kWh of storage. Across every status it lists 5,575 storage projects there, 1,456 of them cancelled and 657 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 3,462 | 112,354 | $59,301,433 |
| PBI in Process | 68 | 54,466 | $23,413,218 |
| Reserved | 376 | 44,707 | $15,051,495 |
| Pending Reservation | 69 | 3,054 | $11,279,573 |
| Waitlist | 40 | 1,218 | $2,143,218 |
| Cancelled | 1,456 | 155,204 | $87,435,841 |
| RRF Rejected | 104 | 2,135 | $518,381 |
Installers named on the most SGIP storage projects in Orange County
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 938 | 614 |
| Semper Solaris Construction Inc | 589 | 465 |
| SunPower | 308 | 167 |
| Tesla | 296 | 262 |
| Tesla Energy Operations (formerly SolarCity) | 246 | 219 |
| LA Solar Group | 238 | 169 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 233 | 171 |
| Solar Optimum Inc. | 202 | 147 |
| ORANGE COUNTY CONTRACTING SERVICES | 198 | 102 |
| SolarMax Renewable Energy Provider, Inc | 158 | 97 |
642 of the 5,575 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Orange County (EIA)
EIA’s 2025 Service Territory file lists 3 utilities serving Orange County. 3 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Southern California Edison Co | Investor Owned | 746,002 | 734,452 | 6,267.868 | AC | 130,848 |
| San Diego Gas & Electric Co | Investor Owned | 346,738 | 340,500 | 2,361.405 | AC | 10,687 |
| City of Anaheim - (CA) | Municipal | 5,544 | 5,351 | 55.62 | DC | 0 |
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Orange County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Orange County
77 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Orange County as the county: 57 with the business type Corporation, Limited Liability, Partnership or JointVenture and 20 Sole Owner. 55 C-10 Electrical licenses in Orange County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Orange County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
Solar permit data in Orange County
One permit dataset in Orange County is published as open data that this index can read. Each counts permits issued by the agency named, with its own filter, so the rows are not added together. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Area covered | Agency | Solar permits, 2025 | Battery permits, 2025 | Full table |
|---|---|---|---|---|
| City of Anaheim | City of Anaheim | 257 | 6 | Below |
Solar permits issued in the City of Anaheim
From The City of Anaheim’s open data: Building Permits (public view of Accela building permits), City of Anaheim ArcGIS layer. Counted by calendar year of the permitissued field. Solar: typeofwork is 'Photovoltaic System', 'Photovoltaic with Micro-Inverters' or 'Phototvoltaic with Micro-Inverters' (as spelled in the data), and comres starts with 'Residential'. Battery: those solar permits whose description mentions BATTER, ENERGY STORAGE or POWERWALL (any case). Latest solar permit issue date in the data: Nov 15, 2026. Checked Nov 16, 2026.
| Year | Solar permits | Battery permits |
|---|---|---|
| 2018 | 170 | 9 |
| 2019 | 200 | 14 |
| 2020 | 178 | 22 |
| 2021 | 249 | 79 |
| 2022 | 308 | 97 |
| 2023 | 385 | 28 |
| 2024 | 296 | 9 |
| 2025 | 257 | 6 |
| 2026 (through Nov 16, 2026) | 166 | 4 |
A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected. Anaheim homes are served by Anaheim Public Utilities, a city utility that does not report to California DG Stats, so the city’s permits are the public record of rooftop solar there on this site. The layer names the contractor but no license number, so permits are not linked to installers.
At a glance
- Residential solar installs
- 133,331
- Last 24 months
- 16,817
- Capacity
- 917.3 MW DC
- Median system size
- 6.2 kW DC
- With battery storage
- 20.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 75.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 30.7% where reported
- Ownership types recorded
- PPA 28,616, lease 7,448, prepaid lease 180, other 1,308
- Median battery size
- 13.5 kWh
- Earliest install in data
- Mar 30, 1999
Common questions
How many homes in Orange County have solar?
133,331 residential solar systems in Orange County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 16,817 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Orange County?
713 installer names have at least one install interconnected in Orange County in the last 24 months, and 2,891 appear in the full record.
How common are batteries with new solar in Orange County?
20.0% of the solar installs interconnected in Orange County include battery storage across all years, and 75.2% in the last 24 months (11,180 of 14,864). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many solar installs in Orange County are under NEM 3.0?
19,618 of the 133,331 residential solar installs in Orange County (14.7% of the 133,285 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.