Vivint Solar Developer, LLC

How many solar installs has Vivint Solar Developer, LLC done in California, and which license number is on its installs?

Vivint Solar Developer, LLC has 87,358 residential solar installs interconnected in California, active in the records from 2012 through 2025 (Sep 24, 2012 to Nov 15, 2025), most of them in San Diego County (12,969), Riverside County (8,367) and Kern County (7,518). CSLB lists license 973756 (VIVINT SOLAR) with status Liab Ins Susp in the License Master file pulled Nov 4, 2026, classifications C-10, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
87,358
Last 24 months
4
Total capacity
545,355.7 kW DC
Median system size
5.6 kW DC
With battery storage
2.5% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 0.0% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
83.5% of 82,433 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
0 installs
Ownership types recorded
PPA 65,618, lease 3,005, prepaid lease 5, other 164
Median battery size
9.8 kWh (1,744 installs list a capacity)
First install
Sep 24, 2012
Latest install
Nov 15, 2025
Counties
46
Utilities
PGE 41,188, SCE 32,322, SDGE 13,848
CSLB license
973756

Is Vivint Solar still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (2 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2012 to 2026

YearInstalls interconnectedWith battery storage
20122430
20132,4480
20144,4190
20158,0640
20168,3210
20176,5804
20189,4258
201914,6073
202012,917169
202115,7491,232
20224,476397
2023963
202491
202540
2026 (through Aug 31, 2026)00

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

None of its 87,358 interconnected installs with a tariff recorded (87,358) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.024,35227.9%not counted
NEM 2.063,00672.1%1,817 (3.5%)
Net Billing Tariff00.0%0

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 68,792 of Vivint Solar Developer, LLC’s installs the utility recorded a third-party ownership type: PPA 65,618, lease 3,005, prepaid lease 5, other 164. Across all installers, 66,889 residential systems list a third-party owner name that matches Vivint Solar Developer, LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Vivint Solar Developer LLC65,713
VivintSolar Developer, LLC.1,454
Vivint Solar Develop474
VIVINT SOLAR DEVELOPER LCC321
VivintSolarDeveloper, LLC232

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 1 of Vivint Solar Developer, LLC’s 4 installs name a module maker in the “Generator Manufacturer” fields, and most of those (1, 100.0%) used modules recorded as LONGi.

In the last 24 months, 4 of Vivint Solar Developer, LLC’s 4 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (4, 100.0%) used inverters recorded as SolarEdge.

In the last 24 months, none of Vivint Solar Developer, LLC’s 4 installs name a battery maker in the “Generator Manufacturer” fields; the fields are blank or unreadable on those records.

1,563 of 1,817 battery-paired PG&E and SCE installs (86.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerLONGi12,399
Inverter makerSolarEdge457,983
Enphase128,716
Battery makerLG01,517
sonnen044
Tesla02

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 73,242 of 87,358 installs, inverters on 87,193. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Vivint Solar Developer, LLC as developer on 998 battery storage projects and as installer on 994 (994 name it as both), 998 projects in all with 9,617 kWh of storage. 126 have the status Paid, with $222,941 in current incentive allocations. Applications were received from Jul 13, 2017 to Jun 14, 2022.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid1261,166$222,941
Cancelled7227,063$1,334,363
RRF Rejected1501,389$266,612

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage8388,066$1,513,156125$215,541
Large-Scale Storage9153$36,7480$0
Equity Resiliency110$7,3991$7,399
Not stated1501,389$266,6120$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
973756VIVINT SOLAR (Limited Liability)Liab Ins Susp, WC Susp PendingC-10 Electrical ContractorJun 6, 2012Jun 30, 202881,474

License numbers are the ones the utilities recorded on the interconnection applications (82,151 of 87,358 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 973756. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Vivint Solar Developer, LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023Total
City and County of San Francisco97375666450021
unincorporated San Diego County973756827840656845713,176
unincorporated Marin County973756110130015

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
San Diego12,969
Riverside8,367
Kern7,518
Los Angeles6,692
San Bernardino5,903
Fresno5,072
Ventura4,162
Orange4,073
Contra Costa3,964
San Joaquin3,696
Santa Clara3,235
Tulare2,681
Solano2,498
Alameda1,969
Sonoma1,460
Placer1,432
Monterey1,319
Merced1,244
Butte1,063
Yolo960
Santa Barbara811
Kings632
San Benito571
Madera540
Sutter526
Stanislaus494
Santa Cruz487
Yuba475
San Luis Obispo449
San Mateo421
Glenn273
Tehama264
Napa249
El Dorado214
Calaveras179
Colusa165
Shasta87
Tuolumne78
Nevada48
Amador44
Marin33
Lake16
San Francisco10
Mariposa6
Sacramento5
Mendocino4

Top cities

CityInstalls
Bakersfield6,211
San Diego4,398
Fresno2,793
San Jose2,069
Stockton1,756
Lancaster1,559
Visalia1,559
Chula Vista1,142
Escondido1,086
Clovis1,002
El Cajon990
Moreno Valley937
Lincoln926
Vacaville920
Oceanside889

Names as recorded by the utilities

The utilities recorded this installer under 24 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
Vivint Solar Developer, LLC27,109
Vivint Solar Developer, LLC.20,404
VIVINT SOLAR19,233
Vivint Solar8,984
VIVINT SOLAR DEVELOPER LLC7,777
VIVINT SOLAR DEVELOPER, LLC1,721
Vivint Solar LLC Developer1,044
Vivint Solar Developer LLC936
Vivint Solar Developer94
Vivint Solar Developer LLC.29
Vivint Solar Developer, llc5
VIVINT SOLAR INC5
Vivint solar Developer, LLC3
Vivint Solar Developer, LLc2
VIVINT SOLAR DEVELOPER, LLC.2
Vivint Solar LLC2
Vivint Solar Developer , LLC1
Vivint Solar Developer LLc1
Vivint Solar Developer, Inc.1
VIvint Solar Developer, LLC1
Vivint Solar Developer, LLc.1
Vivint SOlar Developer, LLC.1
Vivint Solar Developer,Inc1
Vivint Solar Developer,LLC1

Common questions

Where does Vivint Solar Developer, LLC install solar?

Its installs are spread across 46 counties. The most are in San Diego County (12,969 installs), followed by Riverside County (8,367).

How often does Vivint Solar Developer, LLC install batteries with solar?

2.5% of its interconnected solar installs include battery storage across all years, and 0.0% in the last 24 months (0 of 1). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Vivint Solar Developer, LLC installs are under NEM 3.0 (the Net Billing Tariff)?

None of its 87,358 interconnected installs with a tariff recorded (87,358) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.