Solar installers in Amador County, California
Who installs the most solar in Amador County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Amador County are Sunrun (144), V3 Electric (79) and BRIGHT OPS (54). They account for 277 of the 605 residential solar installs interconnected there in that window.
In all, 4,441 homes in Amador County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 90 installers with installs in this window. 26 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | V3 Electric | 789 | 789 |
| 2 | Sunrun | 465 | 465 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 194 | 194 |
| 4 | SunPower | 181 | 181 |
| 5 | Gold Rush Energy Solutions | 131 | 131 |
| 6 | Citadel Roofing and Solar | 127 | 127 |
| 7 | I Love My Solar | 108 | 108 |
| 8 | FREEDOM FOREVER LLC | 94 | 94 |
| 9 | Bright Planet Solar | 84 | 84 |
| 10 | SunnyCal Solar Inc | 83 | 83 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 599 | 63 |
| 2023 | 667 | 119 |
| 2024 | 370 | 241 |
| 2025 | 358 | 299 |
| 2026 (through Aug 31, 2026) | 146 | 119 |
Under the Net Billing Tariff (NEM 3.0)
779 of the 4,441 residential solar installs in Amador County (17.5% of the 4,440 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.8% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Amador County
| 1 | Sunrun | 172 | 170 | 98.8% |
| 2 | V3 Electric | 145 | 135 | 93.1% |
| 3 | BRIGHT OPS | 60 | 56 | 93.3% |
| 4 | I Love My Solar | 38 | 35 | 92.1% |
| 5 | SOLAR SAVINGS DIRECT INC | 27 | 26 | 96.3% |
| 6 | SENGA ENERGY LLC | 21 | 16 | 76.2% |
| 7 | Tesla Energy Operations (formerly SolarCity) | 21 | 20 | 95.2% |
| 8 | NORTH VALLEY LLC | 18 | 18 | 100.0% |
| 9 | FREEDOM FOREVER LLC | 13 | 12 | 92.3% |
| 10 | SOLAR AND ROOF DIRECT | 13 | 12 | 92.3% |
| 11 | Bright Planet Solar | 10 | 6 | 60.0% |
| 12 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 10 | 9 | 90.0% |
| 13 | AXIA SOLAR CORP | 9 | 8 | 88.9% |
| 14 | Future Energy Corporation | 9 | 8 | 88.9% |
| 15 | BETTER EARTH ELECTRIC INC | 8 | 8 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Amador County
| City | All-time installs |
|---|---|
| Ione | 1,650 |
| Jackson | 823 |
| Sutter Creek | 502 |
| Pine Grove | 440 |
| Plymouth | 423 |
| Pioneer | 302 |
| Volcano | 117 |
| Fiddletown | 108 |
| Amador City | 39 |
| Drytown | 22 |
| River Pines | 6 |
| Martell | 2 |
| Mount Aukum | 1 |
| Placerville | 1 |
| Vacaville | 1 |
ZIP codes in Amador County
ZIP codes with their own page where the utilities recorded Amador County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 95640 | 1,650 | 1,650 | 210 |
| 95642 | 825 | 825 | 91 |
| 95685 | 503 | 503 | 76 |
| 95665 | 440 | 440 | 63 |
| 95669 | 420 | 421 | 71 |
| 95666 | 303 | 303 | 49 |
| 95689 | 119 | 119 | 15 |
| 95629 | 107 | 110 | 15 |
| 95601 | 39 | 39 | 8 |
Equipment recorded
In the last 24 months, 571 of Amador County’s 605 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (163, 28.5%) used modules recorded as Qcells.
In the last 24 months, 605 of Amador County’s 605 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (244, 40.3%) used inverters recorded as Enphase.
In the last 24 months, 372 of Amador County’s 605 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (187, 50.3%) used batteries recorded as Tesla.
795 of 990 battery-paired PG&E and SCE installs (80.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 163 | 1,203 |
| JA Solar | 116 | 230 | |
| LONGi | 73 | 381 | |
| Silfab | 42 | not in top list | |
| EG4 | 35 | not in top list | |
| Inverter maker | Enphase | 244 | 1,316 |
| Tesla | 244 | 521 | |
| SolarEdge | 131 | 1,890 | |
| EG4 | 35 | not in top list | |
| FranklinWH | 14 | not in top list | |
| Battery maker | Tesla | 187 | 406 |
| Enphase | 83 | 156 | |
| SolarEdge | 66 | 97 | |
| FranklinWH | 14 | 20 | |
| Generac | 6 | 21 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,110 of 4,441 installs, inverters on 4,440. See the methodology and the equipment index.
SGIP battery storage projects in Amador County
The SGIP public project report downloaded Nov 16, 2026 lists 285 battery storage projects in Amador County with the status Paid, carrying $4,348,601 in current incentive allocations and 6,374 kWh of storage. Across every status it lists 449 storage projects there, 136 of them cancelled and 28 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 285 | 6,374 | $4,348,601 |
| PBI in Process | 4 | 4,244 | $1,350,498 |
| Reserved | 10 | 731 | $782,562 |
| Pending Reservation | 2 | 26 | $50,199 |
| Cancelled | 136 | 4,281 | $2,686,354 |
| RRF Rejected | 12 | 180 | $29,513 |
Installers named on the most SGIP storage projects in Amador County
| Installer | Projects | Paid |
|---|---|---|
| V3 Electric | 154 | 96 |
| Hooked On Solar | 45 | 35 |
| Infinity Energy, Inc | 29 | 16 |
| Semper Solaris Construction Inc | 29 | 21 |
| SOLAR SAVINGS DIRECT INC | 23 | 16 |
| Sunrun | 20 | 13 |
| SunPower | 19 | 11 |
| Tesla | 11 | 7 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 10 | 9 |
| SolarNorcal, LLC | 9 | 8 |
12 of the 449 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Amador County (EIA)
EIA’s 2025 Service Territory file lists 2 utilities serving Amador County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Kirkwood Meadows PUD. For short form filers, EIA’s net metering file note says its state adjustments “include PV capacity from the short form.”
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in Amador County
6 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Amador County as the county: 5 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 1 C-10 Electrical license in Amador County carries a license number the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Amador County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 4,441
- Last 24 months
- 605
- Capacity
- 31.4 MW DC
- Median system size
- 6.4 kW DC
- With battery storage
- 22.3% all time; 80.0% last 24 months
- Third-party owned
- 35.4% where reported
- Ownership types recorded
- PPA 1,414, lease 142, prepaid lease 3, other 14
- Median battery size
- 13.5 kWh
- Earliest install in data
- Aug 9, 2001
Common questions
How many homes in Amador County have solar?
4,441 residential solar systems in Amador County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 605 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Amador County?
90 installer names have at least one install interconnected in Amador County in the last 24 months, and 382 appear in the full record.
How common are batteries with new solar in Amador County?
22.3% of the solar installs interconnected in Amador County include battery storage across all years, and 80.0% in the last 24 months (484 of 605).
How many solar installs in Amador County are under NEM 3.0?
779 of the 4,441 residential solar installs in Amador County (17.5% of the 4,440 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.