SOLAR SAVINGS DIRECT INC
How many solar installs has SOLAR SAVINGS DIRECT INC done in California, and which license number is on its installs?
SOLAR SAVINGS DIRECT INC has 2,424 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Feb 21, 2018 to Jun 18, 2026), most of them in El Dorado County (414), Contra Costa County (398) and Kern County (258). CSLB lists license 1065773 (SOLAR AND ROOF DIRECT) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-39, C-46, expires May 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to SOLAR SAVINGS DIRECT INC here carry more than one CSLB license number: 1065773 on 2,325 (CSLB holder SOLAR AND ROOF DIRECT, Shingle Springs) and 950064 on 95 (CSLB holder GREENPEAK DEVELOPMENT LLC, Cameron Park), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 2,424
- Last 24 months
- 579
- Total capacity
- 19,648.4 kW DC
- Median system size
- 7.4 kW DC
- With battery storage
- 34.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 3.0% of 2,424 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 824 installs, latest Jun 18, 2026
- Ownership types recorded
- PPA 71, lease 1
- Median battery size
- 13.5 kWh (167 installs list a capacity)
- First install
- Feb 21, 2018
- Latest install
- Jun 18, 2026
- Counties
- 46
- Utilities
- PGE 2,352, SCE 54, SDGE 18
- CSLB license
- 1065773, 950064
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2018 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2018 | 21 | 1 |
| 2019 | 41 | 0 |
| 2020 | 96 | 3 |
| 2021 | 211 | 10 |
| 2022 | 374 | 18 |
| 2023 | 697 | 25 |
| 2024 | 617 | 462 |
| 2025 | 341 | 303 |
| 2026 (through Aug 31, 2026) | 26 | 10 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
824 of its 2,424 interconnected installs (34.0% of the 2,424 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 18, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 1 | 0.0% | not counted |
| NEM 2.0 | 1,599 | 66.0% | 75 (4.7%) |
| Net Billing Tariff | 824 | 34.0% | 757 (93.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 72 of SOLAR SAVINGS DIRECT INC’s installs the utility recorded a third-party ownership type: PPA 71, lease 1, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches SOLAR SAVINGS DIRECT INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| EverBright | 45 |
| Lightreach | 8 |
| SOLAR AND ROOF DIREC | 5 |
| EnFin | 3 |
| Sunnova | 2 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 515 of SOLAR SAVINGS DIRECT INC’s 579 installs name a module maker in the “Generator Manufacturer” fields, and most of those (264, 51.3%) used modules recorded as United Renewable Energy.
In the last 24 months, 579 of SOLAR SAVINGS DIRECT INC’s 579 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (426, 73.6%) used inverters recorded as Enphase.
In the last 24 months, 451 of SOLAR SAVINGS DIRECT INC’s 579 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (283, 62.7%) used batteries recorded as Enphase.
740 of 832 battery-paired PG&E and SCE installs (88.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | United Renewable Energy | 264 | 680 |
| LONGi | 83 | 85 | |
| REC | 69 | 122 | |
| Qcells | 68 | 1,040 | |
| VSUN (Vietnam Sunergy) | 28 | 127 | |
| Inverter maker | Enphase | 426 | 2,128 |
| Tesla | 188 | 237 | |
| SolarEdge | 21 | 161 | |
| Qcells | 11 | not in top list | |
| SMA | 10 | 36 | |
| Battery maker | Enphase | 283 | 523 |
| Tesla | 163 | 202 | |
| Q.SAVE | 3 | 3 | |
| FranklinWH | 1 | 5 | |
| SolarEdge | 1 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,230 of 2,424 installs, inverters on 2,424. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names SOLAR SAVINGS DIRECT INC as developer on 809 battery storage projects and as installer on 811 (804 name it as both), 816 projects in all with 14,484 kWh of storage. 200 have the status Paid, with $4,803,577 in current incentive allocations. Applications were received from Aug 27, 2019 to Feb 24, 2026.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 200 | 4,992 | $4,803,577 |
| Reserved | 259 | 3,704 | $6,518,691 |
| Pending Reservation | 48 | 647 | $1,323,340 |
| Waitlist | 5 | 66 | $128,268 |
| Cancelled | 303 | 5,049 | $7,822,674 |
| RRF Rejected | 1 | 26 | $3,480 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Residential Solar and Storage Equity - AB 209 Non-POU | 488 | 6,442 | $12,781,939 | 14 | $264,342 |
| Equity Resiliency | 252 | 6,837 | $6,596,384 | 171 | $4,454,435 |
| Residential Solar and Storage Equity - AB 209 | 28 | 370 | $661,760 | 0 | $0 |
| Small Residential Storage | 20 | 367 | $53,798 | 10 | $24,700 |
| Residential Solar and Storage Equity - AB 209 POU | 16 | 224 | $395,718 | 2 | $40,088 |
| Large-Scale Storage | 6 | 152 | $34,351 | 3 | $20,011 |
| Residential Solar and Storage Equity - Ratepayer | 5 | 66 | $72,600 | 0 | $0 |
| Not stated | 1 | 26 | $3,480 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1065773 | SOLAR AND ROOF DIRECT (Corporation) | CLEAR | C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor; C-46 Solar Contractor | May 11, 2020 | May 31, 2028 | 2,325 |
| 950064 | GREENPEAK DEVELOPMENT LLC (Limited Liability) | CLEAR | B General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar Contractor | Jul 16, 2010 | Jan 31, 2028 | 95 |
License numbers are the ones the utilities recorded on the interconnection applications (2,421 of 2,424 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1065773, 950064. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list SOLAR SAVINGS DIRECT INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|
| City and County of San Francisco | 1065773 | 0 | 1 | 0 | 1 | 2 |
| unincorporated San Diego County | 1065773 | 0 | 0 | 4 | 5 | 9 |
| unincorporated Marin County | 1065773 | 1 | 0 | 0 | 0 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- SOLAR AND ROOF DIRECT: 874 installs, license 1065773
Counties
| County | Installs |
|---|---|
| El Dorado | 414 |
| Contra Costa | 398 |
| Kern | 258 |
| San Joaquin | 180 |
| Placer | 165 |
| Alameda | 157 |
| Solano | 128 |
| Yolo | 73 |
| Santa Clara | 68 |
| Calaveras | 66 |
| Amador | 54 |
| Sonoma | 47 |
| San Mateo | 41 |
| Lake | 39 |
| Fresno | 38 |
| Nevada | 38 |
| Napa | 35 |
| Marin | 22 |
| Tuolumne | 21 |
| Yuba | 18 |
| Los Angeles | 17 |
| Sutter | 17 |
| Tulare | 17 |
| San Diego | 14 |
| Butte | 11 |
| Shasta | 11 |
| Stanislaus | 10 |
| Monterey | 8 |
| Merced | 7 |
| Riverside | 6 |
| San Bernardino | 6 |
| Santa Cruz | 6 |
| Santa Barbara | 5 |
| Kings | 4 |
| Mariposa | 4 |
| Orange | 4 |
| Madera | 3 |
| Mendocino | 3 |
| Plumas | 2 |
| San Luis Obispo | 2 |
| Tehama | 2 |
| Colusa | 1 |
| Glenn | 1 |
| Humboldt | 1 |
| Sacramento | 1 |
| Ventura | 1 |
Top cities
| City | Installs |
|---|---|
| Bakersfield | 204 |
| Stockton | 107 |
| El Dorado Hills | 93 |
| Placerville | 88 |
| Cameron Park | 70 |
| Shingle Springs | 66 |
| Brentwood | 58 |
| Concord | 47 |
| Antioch | 40 |
| Fairfield | 37 |
| San Jose | 37 |
| Copperopolis | 36 |
| Oakley | 36 |
| Auburn | 33 |
| Vallejo | 31 |
Names as recorded by the utilities
The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| SOLAR SAVINGS DIRECT INC | 2,306 |
| Solar Savings Direct | 52 |
| SOLAR SAVINGS DIRECT | 50 |
| Solar Savings Direct, Inc. | 14 |
| Solar Savings Direct Inc | 1 |
| SOLAR-SAVINGS-DIRECT-INC | 1 |
Common questions
Where does SOLAR SAVINGS DIRECT INC install solar?
Its installs are spread across 46 counties. The most are in El Dorado County (414 installs), followed by Contra Costa County (398).
How often does SOLAR SAVINGS DIRECT INC install batteries with solar?
34.6% of its interconnected solar installs include battery storage across all years, and 90.2% in the last 24 months (506 of 561). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many SOLAR SAVINGS DIRECT INC installs are under NEM 3.0 (the Net Billing Tariff)?
824 of its 2,424 interconnected installs (34.0% of the 2,424 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)