SOLAR SAVINGS DIRECT INC

How many solar installs has SOLAR SAVINGS DIRECT INC done in California, and which license number is on its installs?

SOLAR SAVINGS DIRECT INC has 2,424 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Feb 21, 2018 to Jun 18, 2026), most of them in El Dorado County (414), Contra Costa County (398) and Kern County (258). CSLB lists license 1065773 (SOLAR AND ROOF DIRECT) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-39, C-46, expires May 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to SOLAR SAVINGS DIRECT INC here carry more than one CSLB license number: 1065773 on 2,325 (CSLB holder SOLAR AND ROOF DIRECT, Shingle Springs) and 950064 on 95 (CSLB holder GREENPEAK DEVELOPMENT LLC, Cameron Park), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
2,424
Last 24 months
579
Total capacity
19,648.4 kW DC
Median system size
7.4 kW DC
With battery storage
34.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 90.2% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
3.0% of 2,424 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
824 installs, latest Jun 18, 2026
Ownership types recorded
PPA 71, lease 1
Median battery size
13.5 kWh (167 installs list a capacity)
First install
Feb 21, 2018
Latest install
Jun 18, 2026
Counties
46
Utilities
PGE 2,352, SCE 54, SDGE 18
CSLB license
1065773, 950064

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
2018211
2019410
2020963
202121110
202237418
202369725
2024617462
2025341303
2026 (through Aug 31, 2026)2610

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

824 of its 2,424 interconnected installs (34.0% of the 2,424 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Jun 18, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.0%not counted
NEM 2.01,59966.0%75 (4.7%)
Net Billing Tariff82434.0%757 (93.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 72 of SOLAR SAVINGS DIRECT INC’s installs the utility recorded a third-party ownership type: PPA 71, lease 1, prepaid lease 0, other 0. Across all installers, 1 residential systems list a third-party owner name that matches SOLAR SAVINGS DIRECT INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
EverBright45
Lightreach8
SOLAR AND ROOF DIREC5
EnFin3
Sunnova2

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 515 of SOLAR SAVINGS DIRECT INC’s 579 installs name a module maker in the “Generator Manufacturer” fields, and most of those (264, 51.3%) used modules recorded as United Renewable Energy.

In the last 24 months, 579 of SOLAR SAVINGS DIRECT INC’s 579 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (426, 73.6%) used inverters recorded as Enphase.

In the last 24 months, 451 of SOLAR SAVINGS DIRECT INC’s 579 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (283, 62.7%) used batteries recorded as Enphase.

740 of 832 battery-paired PG&E and SCE installs (88.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerUnited Renewable Energy264680
LONGi8385
REC69122
Qcells681,040
VSUN (Vietnam Sunergy)28127
Inverter makerEnphase4262,128
Tesla188237
SolarEdge21161
Qcells11not in top list
SMA1036
Battery makerEnphase283523
Tesla163202
Q.SAVE33
FranklinWH15
SolarEdge13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,230 of 2,424 installs, inverters on 2,424. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SOLAR SAVINGS DIRECT INC as developer on 809 battery storage projects and as installer on 811 (804 name it as both), 816 projects in all with 14,484 kWh of storage. 200 have the status Paid, with $4,803,577 in current incentive allocations. Applications were received from Aug 27, 2019 to Feb 24, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid2004,992$4,803,577
Reserved2593,704$6,518,691
Pending Reservation48647$1,323,340
Waitlist566$128,268
Cancelled3035,049$7,822,674
RRF Rejected126$3,480

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU4886,442$12,781,93914$264,342
Equity Resiliency2526,837$6,596,384171$4,454,435
Residential Solar and Storage Equity - AB 20928370$661,7600$0
Small Residential Storage20367$53,79810$24,700
Residential Solar and Storage Equity - AB 209 POU16224$395,7182$40,088
Large-Scale Storage6152$34,3513$20,011
Residential Solar and Storage Equity - Ratepayer566$72,6000$0
Not stated126$3,4800$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1065773SOLAR AND ROOF DIRECT (Corporation)CLEARC-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor; C-46 Solar ContractorMay 11, 2020May 31, 20282,325
950064GREENPEAK DEVELOPMENT LLC (Limited Liability)CLEARB General Building Contractor; C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-46 Solar ContractorJul 16, 2010Jan 31, 202895

License numbers are the ones the utilities recorded on the interconnection applications (2,421 of 2,424 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for licenses 1065773, 950064. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list SOLAR SAVINGS DIRECT INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2023202420252026Total
City and County of San Francisco106577301012
unincorporated San Diego County106577300459
unincorporated Marin County106577310001

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
El Dorado414
Contra Costa398
Kern258
San Joaquin180
Placer165
Alameda157
Solano128
Yolo73
Santa Clara68
Calaveras66
Amador54
Sonoma47
San Mateo41
Lake39
Fresno38
Nevada38
Napa35
Marin22
Tuolumne21
Yuba18
Los Angeles17
Sutter17
Tulare17
San Diego14
Butte11
Shasta11
Stanislaus10
Monterey8
Merced7
Riverside6
San Bernardino6
Santa Cruz6
Santa Barbara5
Kings4
Mariposa4
Orange4
Madera3
Mendocino3
Plumas2
San Luis Obispo2
Tehama2
Colusa1
Glenn1
Humboldt1
Sacramento1
Ventura1

Top cities

CityInstalls
Bakersfield204
Stockton107
El Dorado Hills93
Placerville88
Cameron Park70
Shingle Springs66
Brentwood58
Concord47
Antioch40
Fairfield37
San Jose37
Copperopolis36
Oakley36
Auburn33
Vallejo31

Names as recorded by the utilities

The utilities recorded this installer under 6 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SOLAR SAVINGS DIRECT INC2,306
Solar Savings Direct52
SOLAR SAVINGS DIRECT50
Solar Savings Direct, Inc.14
Solar Savings Direct Inc1
SOLAR-SAVINGS-DIRECT-INC1

Common questions

Where does SOLAR SAVINGS DIRECT INC install solar?

Its installs are spread across 46 counties. The most are in El Dorado County (414 installs), followed by Contra Costa County (398).

How often does SOLAR SAVINGS DIRECT INC install batteries with solar?

34.6% of its interconnected solar installs include battery storage across all years, and 90.2% in the last 24 months (506 of 561). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many SOLAR SAVINGS DIRECT INC installs are under NEM 3.0 (the Net Billing Tariff)?

824 of its 2,424 interconnected installs (34.0% of the 2,424 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.