How many solar installs has SOLAR AND ROOF DIRECT done in California, and which license number is on its installs?
SOLAR AND ROOF DIRECT has 874 residential solar installs interconnected in California, active in the records from 2025 through 2026 (Feb 21, 2025 to Aug 31, 2026), most of them in Kern County (229), El Dorado County (58) and San Joaquin County (58). CSLB lists license 1065773 (SOLAR AND ROOF DIRECT) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-20, C-39, C-46, expires May 31, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 874
- Last 24 months
- 874
- Total capacity
- 7,181.1 kW DC
- Median system size
- 7.7 kW DC
- With battery storage
- 95.0% all time; 95.0% last 24 months
- Third-party owned
- 39.4% of 874 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 829 installs, latest Aug 31, 2026
- Ownership types recorded
- PPA 329, lease 5, prepaid lease 10
- Median battery size
- 13.5 kWh (647 installs list a capacity)
- First install
- Feb 21, 2025
- Latest install
- Aug 31, 2026
- Counties
- 43
- Utilities
- PGE 712, SCE 162
- CSLB license
- 1065773
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2025 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2025 | 422 | 408 |
| 2026 (through Aug 31, 2026) | 452 | 422 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
829 of its 874 interconnected installs (94.9% of the 874 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 9 | 1.0% | not counted |
| NEM 2.0 | 36 | 4.1% | 27 (75.0%) |
| Net Billing Tariff | 829 | 94.9% | 795 (95.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 344 of SOLAR AND ROOF DIRECT’s installs the utility recorded a third-party ownership type: PPA 329, lease 5, prepaid lease 10, other 0. Across all installers, 208 residential systems list a third-party owner name that matches SOLAR AND ROOF DIRECT exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| Solar and Roof Direct | 207 |
| Goodleap | 100 |
| Credit Human | 8 |
| Enfin | 7 |
| Everbright | 5 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 838 of SOLAR AND ROOF DIRECT’s 874 installs name a module maker in the “Generator Manufacturer” fields, and most of those (489, 58.4%) used modules recorded as Qcells.
In the last 24 months, 874 of SOLAR AND ROOF DIRECT’s 874 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (468, 53.5%) used inverters recorded as Tesla.
In the last 24 months, 674 of SOLAR AND ROOF DIRECT’s 874 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (417, 61.9%) used batteries recorded as Tesla.
671 of 830 battery-paired PG&E and SCE installs (80.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 489 | 489 |
| LONGi | 159 | 159 | |
| VSUN (Vietnam Sunergy) | 127 | 127 | |
| Silfab | 32 | 32 | |
| REC | 30 | 30 | |
| Inverter maker | Tesla | 468 | 468 |
| SolarEdge | 237 | 237 | |
| Enphase | 233 | 233 | |
| Qcells | 86 | 86 | |
| SunPower | 22 | 22 | |
| Battery maker | Tesla | 417 | 417 |
| SolarEdge | 136 | 136 | |
| Enphase | 106 | 106 | |
| Q.SAVE | 16 | 16 | |
| LG | 2 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 838 of 874 installs, inverters on 874. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1065773 | SOLAR AND ROOF DIRECT (Corporation) | CLEAR | C-10 Electrical Contractor; C-20 Warm-Air Heating, Ventilating and Air-Conditioning Contractor; C-39 Roofing Contractor; C-46 Solar Contractor | May 11, 2020 | May 31, 2028 | 872 |
License numbers are the ones the utilities recorded on the interconnection applications (874 of 874 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1065773. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list SOLAR AND ROOF DIRECT’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2023 | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|
| City and County of San Francisco | 1065773 | 0 | 1 | 0 | 1 | 2 |
| unincorporated San Diego County | 1065773 | 0 | 0 | 4 | 5 | 9 |
| unincorporated Marin County | 1065773 | 1 | 0 | 0 | 0 | 1 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- SOLAR SAVINGS DIRECT INC: 2,424 installs, license 1065773
Counties
Top cities
| City | Installs |
|---|---|
| Bakersfield | 186 |
| Stockton | 36 |
| San Jose | 20 |
| Auburn | 17 |
| Fresno | 13 |
| Lincoln | 13 |
| Shingle Springs | 13 |
| El Dorado Hills | 12 |
| Placerville | 11 |
| Tracy | 11 |
| San Bernardino | 10 |
| Hanford | 9 |
| Vacaville | 9 |
| Clovis | 8 |
| Ione | 8 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| SOLAR AND ROOF DIRECT | 874 |
Common questions
Where does SOLAR AND ROOF DIRECT install solar?
Its installs are spread across 43 counties. The most are in Kern County (229 installs), followed by El Dorado County (58).
How often does SOLAR AND ROOF DIRECT install batteries with solar?
95.0% of its interconnected solar installs include battery storage across all years, and 95.0% in the last 24 months (830 of 874).
How many SOLAR AND ROOF DIRECT installs are under NEM 3.0 (the Net Billing Tariff)?
829 of its 874 interconnected installs (94.9% of the 874 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 95.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.