Solar installers in San Benito County, California
Who installs the most solar in San Benito County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in San Benito County are Sunrun (317), Citadel Roofing and Solar (252) and BRIGHT OPS (73). They account for 642 of the 997 residential solar installs interconnected there in that window.
In all, 6,090 homes in San Benito County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 87 installers with installs in this window. 16 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | SunPower | 967 | 967 |
| 2 | Sunrun | 844 | 844 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 578 | 578 |
| 4 | Vivint Solar Developer, LLC | 571 | 571 |
| 5 | Citadel Roofing and Solar | 510 | 510 |
| 6 | FREEDOM FOREVER LLC | 199 | 199 |
| 7 | Infinity Energy, Inc | 145 | 145 |
| 8 | Nexus Energy Systems | 138 | 138 |
| 9 | Future Energy Corporation | 125 | 125 |
| 10 | BRIGHT OPS | 81 | 81 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 769 | 71 |
| 2023 | 767 | 64 |
| 2024 | 527 | 151 |
| 2025 | 515 | 258 |
| 2026 (through Aug 31, 2026) | 316 | 123 |
Under the Net Billing Tariff (NEM 3.0)
665 of the 6,090 residential solar installs in San Benito County (10.9% of the 6,089 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.5% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in San Benito County
| 1 | Sunrun | 271 | 203 | 74.9% |
| 2 | BRIGHT OPS | 80 | 77 | 96.3% |
| 3 | Citadel Roofing and Solar | 47 | 5 | 10.6% |
| 4 | Tesla Energy Operations (formerly SolarCity) | 42 | 40 | 95.2% |
| 5 | FREEDOM FOREVER LLC | 35 | 32 | 91.4% |
| 6 | Villara Building Systems | 10 | 1 | 10.0% |
| 7 | BETTER EARTH ELECTRIC INC | 9 | 8 | 88.9% |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 9 | 9 | 100.0% |
| 9 | Allterra Solar | 7 | 4 | 57.1% |
| 10 | L G C Y ELECTRIC | 7 | 7 | 100.0% |
| 11 | A P ELECTRICAL | 6 | 5 | 83.3% |
| 12 | LIFESTYLE SOLAR ELECTRIC | 6 | 0 | 0.0% |
| 13 | Semper Solaris Construction Inc | 6 | 5 | 83.3% |
| 14 | SUNTERNAL CONSTRUCTION INC | 6 | 5 | 83.3% |
| 15 | NRG Clean Power | 5 | 5 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in San Benito County
| City | All-time installs |
|---|---|
| Hollister | 5,674 |
| San Juan Bautista | 289 |
| Tres Pinos | 54 |
| Aromas | 41 |
| Paicines | 25 |
| Los Altos | 1 |
| Watsonville | 1 |
ZIP codes in San Benito County
ZIP codes with their own page where the utilities recorded San Benito County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
Equipment recorded
In the last 24 months, 940 of San Benito County’s 997 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (345, 36.7%) used modules recorded as Qcells.
In the last 24 months, 997 of San Benito County’s 997 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (624, 62.6%) used inverters recorded as Enphase.
In the last 24 months, 337 of San Benito County’s 997 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (192, 57.0%) used batteries recorded as Tesla.
617 of 756 battery-paired PG&E and SCE installs (81.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 345 | 1,054 |
| JA Solar | 320 | 489 | |
| LONGi | 88 | 535 | |
| REC | 35 | 451 | |
| Trina Solar | 33 | not in top list | |
| Inverter maker | Enphase | 624 | 2,467 |
| Tesla | 272 | 438 | |
| SolarEdge | 154 | 1,511 | |
| SunPower | 38 | 924 | |
| Delta Electronics | 12 | not in top list | |
| Battery maker | Tesla | 192 | 319 |
| SolarEdge | 81 | 98 | |
| Enphase | 38 | 60 | |
| FranklinWH | 9 | 11 | |
| Lunar Energy | 9 | 9 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,703 of 6,090 installs, inverters on 6,090. See the methodology and the equipment index.
SGIP battery storage projects in San Benito County
The SGIP public project report downloaded Nov 16, 2026 lists 58 battery storage projects in San Benito County with the status Paid, carrying $244,673 in current incentive allocations and 827 kWh of storage. Across every status it lists 111 storage projects there, 39 of them cancelled and 14 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 58 | 827 | $244,673 |
| Reserved | 7 | 243 | $117,800 |
| Cancelled | 39 | 9,749 | $1,760,166 |
| RRF Rejected | 7 | 118 | $18,345 |
Installers named on the most SGIP storage projects in San Benito County
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 22 | 18 |
| Semper Solaris Construction Inc | 20 | 7 |
| LA Solar Group | 7 | 4 |
| SOLAR 4 AMERICA | 6 | 4 |
| PetersenDean | 5 | 4 |
| Scudder Roofing Sun Energy Systems | 5 | 4 |
| Infinity Energy, Inc | 4 | 1 |
| SunPower | 4 | 2 |
| Tesla | 4 | 4 |
| FREEDOM FOREVER LLC | 3 | 3 |
7 of the 111 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving San Benito County (EIA)
EIA’s 2025 Service Territory file lists 2 utilities serving San Benito County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Central Coast Community Energy.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
San Benito County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in San Benito County
1 C-46 Solar license in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) lists San Benito County as the county: 1 with the business type Corporation, Limited Liability, Partnership or JointVenture and 0 Sole Owner. 6 C-10 Electrical licenses in San Benito County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in San Benito County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 6,090
- Last 24 months
- 997
- Capacity
- 33.7 MW DC
- Median system size
- 4.5 kW DC
- With battery storage
- 12.4% all time; 43.5% last 24 months
- Third-party owned
- 31.3% where reported
- Ownership types recorded
- PPA 1,444, lease 442, other 19
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jun 28, 2001
Common questions
How many homes in San Benito County have solar?
6,090 residential solar systems in San Benito County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 997 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in San Benito County?
87 installer names have at least one install interconnected in San Benito County in the last 24 months, and 351 appear in the full record.
How common are batteries with new solar in San Benito County?
12.4% of the solar installs interconnected in San Benito County include battery storage across all years, and 43.5% in the last 24 months (434 of 997).
How many solar installs in San Benito County are under NEM 3.0?
665 of the 6,090 residential solar installs in San Benito County (10.9% of the 6,089 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 73.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.