Solar installers in Los Altos, California
Most installs here are in Santa Clara County.
Who installs the most solar in Los Altos?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Los Altos are Tesla Energy Operations (formerly SolarCity) (75), Cobalt Power Systems, Inc. (64) and Sunrun (45). They account for 184 of the 539 residential solar installs interconnected there in that window.
In all, 3,613 homes in Los Altos have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 112 installers with installs in this window. 14 installs in the window were self-installed or had no installer recorded.
| 1 | Tesla Energy Operations (formerly SolarCity) | 75 | 601 |
| 2 | Cobalt Power Systems, Inc. | 64 | 510 |
| 3 | Sunrun | 45 | 184 |
| 4 | CINNAMON ENERGY SYSTEMS INC | 30 | 78 |
| 5 | INFINIUM SOLAR, INC. | 21 | 70 |
| 6 | NRG Clean Power | 20 | 54 |
| 7 | Clean Solar | 15 | 122 |
| 8 | Semper Solaris Construction Inc | 12 | 37 |
| 9 | HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION | 11 | 45 |
| 10 | ROCKIN ROOFERS | 11 | 26 |
| 11 | YOUR ENERGY SOLUTIONS | 9 | 39 |
| 12 | Citadel Roofing and Solar | 8 | 25 |
| 13 | Solar Optimum Inc. | 8 | 42 |
| 14 | Solar Technologies | 8 | 54 |
| 15 | SOLARFARGO | 8 | 9 |
| 16 | NABU ENERGY LLC | 7 | 20 |
| 17 | SOLEEVA ENERGY INC | 7 | 16 |
| 18 | SUNVAULT | 7 | 16 |
| 19 | FREEDOM FOREVER LLC | 6 | 15 |
| 20 | RISE & SHINE SOLAR LLC | 6 | 19 |
| 21 | SunPower | 6 | 152 |
| 22 | AXIA SOLAR CORP | 4 | 4 |
| 23 | FREEDOM GREEN CONSTRUCTION | 4 | 27 |
| 24 | Hooked On Solar | 4 | 13 |
| 25 | INDASPEC LLC | 4 | 10 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 601 | 601 |
| 2 | Cobalt Power Systems, Inc. | 510 | 510 |
| 3 | Sunrun | 184 | 184 |
| 4 | SunPower | 152 | 152 |
| 5 | Clean Solar | 122 | 122 |
| 6 | CINNAMON ENERGY SYSTEMS INC | 78 | 78 |
| 7 | INFINIUM SOLAR, INC. | 70 | 70 |
| 8 | Slingshot Power | 55 | 55 |
| 9 | NRG Clean Power | 54 | 54 |
| 10 | Solar Technologies | 54 | 54 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 355 | 141 |
| 2023 | 462 | 132 |
| 2024 | 266 | 179 |
| 2025 | 269 | 218 |
| 2026 (through Aug 31, 2026) | 189 | 164 |
Under the Net Billing Tariff (NEM 3.0)
551 of the 3,613 residential solar installs in Los Altos (15.3% of the 3,613 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.5% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Los Altos
| 1 | Tesla Energy Operations (formerly SolarCity) | 113 | 108 | 95.6% |
| 2 | Cobalt Power Systems, Inc. | 69 | 64 | 92.8% |
| 3 | Sunrun | 50 | 48 | 96.0% |
| 4 | CINNAMON ENERGY SYSTEMS INC | 27 | 25 | 92.6% |
| 5 | INFINIUM SOLAR, INC. | 18 | 15 | 83.3% |
| 6 | NRG Clean Power | 17 | 14 | 82.4% |
| 7 | Clean Solar | 12 | 10 | 83.3% |
| 8 | Solar Optimum Inc. | 12 | 12 | 100.0% |
| 9 | Semper Solaris Construction Inc | 11 | 9 | 81.8% |
| 10 | YOUR ENERGY SOLUTIONS | 10 | 9 | 90.0% |
| 11 | RISE & SHINE SOLAR LLC | 9 | 8 | 88.9% |
| 12 | ROCKIN ROOFERS | 9 | 9 | 100.0% |
| 13 | Solar Technologies | 9 | 8 | 88.9% |
| 14 | HIGHLIGHT SOLAR INC A CALIFORNIA CORPORATION | 8 | 5 | 62.5% |
| 15 | FREEDOM FOREVER LLC | 7 | 7 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 492 of Los Altos’ 539 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (138, 28.0%) used modules recorded as Qcells.
In the last 24 months, 539 of Los Altos’ 539 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (325, 60.3%) used inverters recorded as Tesla.
In the last 24 months, 336 of Los Altos’ 539 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (234, 69.6%) used batteries recorded as Tesla.
816 of 999 battery-paired PG&E and SCE installs (81.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 138 | 509 |
| REC | 136 | 389 | |
| SunPower | 67 | 856 | |
| JA Solar | 37 | not in top list | |
| Hyundai | 36 | not in top list | |
| Inverter maker | Tesla | 325 | 754 |
| Enphase | 198 | 1,016 | |
| SolarEdge | 42 | 824 | |
| FranklinWH | 33 | not in top list | |
| SunPower | 21 | 644 | |
| Battery maker | Tesla | 234 | 569 |
| Enphase | 49 | 84 | |
| FranklinWH | 32 | 51 | |
| Lunar Energy | 7 | 7 | |
| SolarEdge | 6 | 7 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 3,339 of 3,613 installs, inverters on 3,612. See the methodology and the equipment index.
ZIP codes in Los Altos
ZIP codes with their own page where the utilities recorded Los Altos on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Los Altos
The SGIP report lists 248 battery storage projects with the city Los Altos, 177 with the status Paid ($1,674,577 in current incentive allocations, 5,164 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 177 | 5,164 | $1,674,577 |
| PBI in Process | 1 | 79 | $27,840 |
| Reserved | 5 | 117 | $33,055 |
| Cancelled | 56 | 2,785 | $1,914,498 |
| RRF Rejected | 9 | 141 | $22,156 |
Installers named on the most SGIP storage projects in Los Altos
5 of the 248 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Los Altos is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 3,613
- Last 24 months
- 539
- Capacity
- 26.8 MW DC
- Median system size
- 6.8 kW DC
- With battery storage
- 27.7% all time; 81.1% last 24 months
- Third-party owned
- 6.0% where reported
- Ownership types recorded
- PPA 172, lease 37, prepaid lease 4, other 3
- Median battery size
- 14 kWh
- Earliest install in data
- Oct 22, 2001
Common questions
How many homes in Los Altos have solar?
3,613 residential solar systems in Los Altos were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 539 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Los Altos?
112 installer names have at least one install interconnected in Los Altos in the last 24 months, and 399 appear in the full record.
How common are batteries with new solar in Los Altos?
27.7% of the solar installs interconnected in Los Altos include battery storage across all years, and 81.1% in the last 24 months (437 of 539).
How many solar installs in Los Altos are under NEM 3.0?
551 of the 3,613 residential solar installs in Los Altos (15.3% of the 3,613 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 87.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.