FREEDOM GREEN CONSTRUCTION

How many solar installs has FREEDOM GREEN CONSTRUCTION done in California, and which license number is on its installs?

FREEDOM GREEN CONSTRUCTION has 426 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Oct 8, 2019 to Aug 11, 2026), most of them in Santa Clara County (257), San Mateo County (143) and Alameda County (11). CSLB lists license 940672 (FREEDOM GREEN CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
426
Last 24 months
87
Total capacity
3,240.6 kW DC
Median system size
6.6 kW DC
With battery storage
31.9% all time; 67.8% last 24 months
Third-party owned
0.0% of 426 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
95 installs, latest Aug 11, 2026
Ownership types recorded
none recorded
Median battery size
13.5 kWh (31 installs list a capacity)
First install
Oct 8, 2019
Latest install
Aug 11, 2026
Counties
8
Utilities
PGE 426
CSLB license
940672

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
2019240
2020555
2021516
20227220
202311031
20244324
20255436
2026 (through Aug 31, 2026)1714

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

95 of its 426 interconnected installs (22.3% of the 426 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.4% of those include battery storage. The latest Net Billing Tariff install was approved Aug 11, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.010.2%not counted
NEM 2.033077.5%70 (21.2%)
Net Billing Tariff9522.3%65 (68.4%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on FREEDOM GREEN CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches FREEDOM GREEN CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 79 of FREEDOM GREEN CONSTRUCTION’s 87 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (35, 44.3%) used modules recorded as SunPower.

In the last 24 months, 87 of FREEDOM GREEN CONSTRUCTION’s 87 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (57, 65.5%) used inverters recorded as Tesla.

In the last 24 months, 47 of FREEDOM GREEN CONSTRUCTION’s 87 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (45, 95.7%) used batteries recorded as Tesla.

99 of 136 battery-paired PG&E and SCE installs (72.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSunPower35321
Qcells2121
REC1922
Hyundai44
Canadian Solar1not in top list
Inverter makerTesla57112
Enphase3950
SunPower25344
FranklinWH2not in top list
Xantrex Technology Inc.2not in top list
Battery makerTesla4581
FranklinWH22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 371 of 426 installs, inverters on 426. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
940672FREEDOM GREEN CONSTRUCTION (Corporation)CLEARB General Building ContractorDec 8, 2009Dec 31, 2027426

License numbers are the ones the utilities recorded on the interconnection applications (426 of 426 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 940672. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Other names reported under the same license

Counties

CountyInstalls
Santa Clara257
San Mateo143
Alameda11
Santa Cruz8
Contra Costa3
Monterey2
Marin1
San Benito1

Top cities

CityInstalls
San Jose112
Los Gatos28
San Carlos28
Los Altos27
Saratoga25
Menlo Park19
Sunnyvale15
Belmont14
Redwood City14
Mountain View12
San Mateo12
Campbell11
Burlingame10
Hillsborough10
Portola Valley9

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
FREEDOM GREEN CONSTRUCTION426

Common questions

Where does FREEDOM GREEN CONSTRUCTION install solar?

Its installs are spread across 8 counties. The most are in Santa Clara County (257 installs), followed by San Mateo County (143).

How often does FREEDOM GREEN CONSTRUCTION install batteries with solar?

31.9% of its interconnected solar installs include battery storage across all years, and 67.8% in the last 24 months (59 of 87).

How many FREEDOM GREEN CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

95 of its 426 interconnected installs (22.3% of the 426 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 68.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.