Solar installers in Contra Costa County, California
Who installs the most solar in Contra Costa County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Contra Costa County are Sunrun (2,659), BRIGHT OPS (1,090) and Tesla Energy Operations (formerly SolarCity) (1,039). They account for 4,788 of the 12,099 residential solar installs interconnected there in that window.
In all, 91,776 homes in Contra Costa County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 413 installers with installs in this window. 245 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 2,659 | 10,634 |
| 2 | BRIGHT OPS | 1,090 | 1,238 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 1,039 | 13,909 |
| 4 | Citadel Roofing and Solar | 1,025 | 2,689 |
| 5 | FREEDOM FOREVER LLC | 388 | 1,892 |
| 6 | GOT WATTS ELECTRIC, SOLAR & HVAC | 344 | 762 |
| 7 | SunPower | 208 | 5,670 |
| 8 | V3 Electric | 205 | 747 |
| 9 | Semper Solaris Construction Inc | 183 | 1,168 |
| 10 | AMBROSE SOLAR | 159 | 649 |
| 11 | YOUR ENERGY SOLUTIONS | 147 | 875 |
| 12 | GRID Alternatives | 141 | 1,091 |
| 13 | AXIA SOLAR CORP | 134 | 143 |
| 14 | Empower Electric Solar | 131 | 751 |
| 15 | Complete Solar | 126 | 516 |
| 16 | Solar Optimum Inc. | 116 | 538 |
| 17 | Solar Technologies | 110 | 770 |
| 18 | BETTER EARTH ELECTRIC INC | 109 | 949 |
| 19 | NRG Clean Power | 105 | 494 |
| 20 | West Coast Solar | 104 | 2,632 |
| 21 | UNITED SOLAR ELECTRIC | 100 | 330 |
| 22 | Diablo Solar Services | 90 | 1,316 |
| 23 | NORTH VALLEY LLC | 86 | 146 |
| 24 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 79 | 555 |
| 25 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 78 | 78 |
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 13,909 | 13,909 |
| 2 | Sunrun | 10,634 | 10,634 |
| 3 | SunPower | 5,670 | 5,670 |
| 4 | Vivint Solar Developer, LLC | 3,964 | 3,964 |
| 5 | Citadel Roofing and Solar | 2,689 | 2,689 |
| 6 | West Coast Solar | 2,632 | 2,632 |
| 7 | FREEDOM FOREVER LLC | 1,892 | 1,892 |
| 8 | Bright Planet Solar | 1,703 | 1,703 |
| 9 | PetersenDean | 1,582 | 1,582 |
| 10 | Diablo Solar Services | 1,316 | 1,316 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 11,478 | 1,911 |
| 2023 | 10,541 | 1,906 |
| 2024 | 6,073 | 3,796 |
| 2025 | 6,427 | 5,161 |
| 2026 (through Aug 31, 2026) | 3,617 | 2,848 |
Under the Net Billing Tariff (NEM 3.0)
12,969 of the 91,776 residential solar installs in Contra Costa County (14.1% of the 91,775 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Contra Costa County
| 1 | Sunrun | 3,350 | 3,326 | 99.3% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 1,285 | 1,206 | 93.9% |
| 3 | BRIGHT OPS | 1,234 | 1,206 | 97.7% |
| 4 | FREEDOM FOREVER LLC | 509 | 488 | 95.9% |
| 5 | GOT WATTS ELECTRIC, SOLAR & HVAC | 348 | 332 | 95.4% |
| 6 | V3 Electric | 260 | 250 | 96.2% |
| 7 | Empower Electric Solar | 256 | 194 | 75.8% |
| 8 | Citadel Roofing and Solar | 220 | 83 | 37.7% |
| 9 | Semper Solaris Construction Inc | 207 | 152 | 73.4% |
| 10 | SunPower | 184 | 151 | 82.1% |
| 11 | AMBROSE SOLAR | 180 | 174 | 96.7% |
| 12 | GRID Alternatives | 177 | 47 | 26.6% |
| 13 | BETTER EARTH ELECTRIC INC | 170 | 165 | 97.1% |
| 14 | Solar Optimum Inc. | 143 | 135 | 94.4% |
| 15 | AXIA SOLAR CORP | 140 | 136 | 97.1% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Contra Costa County
| City | All-time installs |
|---|---|
| Antioch | 11,460 |
| Brentwood | 10,444 |
| San Ramon | 7,893 |
| Concord | 7,516 |
| Oakley | 6,108 |
| Danville | 5,838 |
| Walnut Creek | 5,698 |
| Pittsburg | 5,350 |
| Richmond | 5,124 |
| Martinez | 3,500 |
| Lafayette | 2,651 |
| Pleasant Hill | 2,621 |
| Orinda | 1,898 |
| Alamo | 1,793 |
| Discovery Bay | 1,728 |
| Hercules | 1,593 |
| El Cerrito | 1,529 |
| Clayton | 1,303 |
| Moraga | 1,180 |
| Pinole | 1,030 |
ZIP codes in Contra Costa County
ZIP codes with their own page where the utilities recorded Contra Costa County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 94513 | 10,400 | 10,400 | 905 |
| 94531 | 6,468 | 6,468 | 1,029 |
| 94565 | 6,304 | 6,304 | 852 |
| 94561 | 6,108 | 6,108 | 746 |
| 94509 | 4,996 | 4,996 | 607 |
| 94583 | 4,028 | 4,030 | 589 |
| 94582 | 3,876 | 3,971 | 368 |
| 94553 | 3,674 | 3,674 | 473 |
| 94521 | 3,201 | 3,201 | 417 |
| 94526 | 3,189 | 3,189 | 410 |
| 94506 | 2,640 | 2,640 | 356 |
| 94549 | 2,638 | 2,638 | 385 |
| 94523 | 2,621 | 2,621 | 343 |
| 94505 | 2,470 | 2,471 | 331 |
| 94598 | 2,402 | 2,402 | 283 |
| 94563 | 1,899 | 1,899 | 221 |
| 94507 | 1,802 | 1,802 | 216 |
| 94518 | 1,800 | 1,800 | 220 |
| 94806 | 1,671 | 1,671 | 358 |
| 94803 | 1,648 | 1,648 | 253 |
| 94547 | 1,594 | 1,594 | 241 |
| 94804 | 1,542 | 1,542 | 307 |
| 94530 | 1,531 | 1,531 | 240 |
| 94519 | 1,463 | 1,463 | 214 |
| 94517 | 1,303 | 1,303 | 145 |
| 94801 | 1,194 | 1,194 | 161 |
| 94556 | 1,182 | 1,182 | 148 |
| 94596 | 1,159 | 1,159 | 135 |
| 94597 | 1,145 | 1,145 | 237 |
| 94520 | 1,056 | 1,056 | 141 |
| 94564 | 1,030 | 1,030 | 139 |
| 94595 | 1,002 | 1,002 | 116 |
| 94805 | 719 | 719 | 107 |
| 94511 | 446 | 446 | 67 |
| 94572 | 438 | 438 | 72 |
| 94514 | 260 | 261 | 17 |
| 94707 | 180 | 1,360 | 165 |
| 94525 | 166 | 166 | 39 |
| 94708 | 133 | 1,093 | 148 |
| 94528 | 110 | 110 | 19 |
| 94548 | 76 | 76 | 8 |
| 95613 | 39 | 75 | 3 |
Equipment recorded
In the last 24 months, 11,276 of Contra Costa County’s 12,099 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (3,420, 30.3%) used modules recorded as Qcells.
In the last 24 months, 12,099 of Contra Costa County’s 12,099 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (6,180, 51.1%) used inverters recorded as Tesla.
In the last 24 months, 7,779 of Contra Costa County’s 12,099 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4,630, 59.5%) used batteries recorded as Tesla.
15,507 of 18,482 battery-paired PG&E and SCE installs (83.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 3,420 | 15,815 |
| JA Solar | 2,715 | 5,007 | |
| REC | 1,274 | 8,884 | |
| LONGi | 813 | 5,562 | |
| Hyundai | 540 | not in top list | |
| Inverter maker | Tesla | 6,180 | 12,150 |
| Enphase | 4,450 | 30,964 | |
| SolarEdge | 2,326 | 29,371 | |
| SunPower | 301 | 8,176 | |
| FranklinWH | 287 | not in top list | |
| Battery maker | Tesla | 4,630 | 8,883 |
| Enphase | 1,335 | 2,348 | |
| SolarEdge | 1,187 | 1,583 | |
| FranklinWH | 277 | 372 | |
| Lunar Energy | 154 | 154 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 85,372 of 91,776 installs, inverters on 91,770. See the methodology and the equipment index.
SGIP battery storage projects in Contra Costa County
The SGIP public project report downloaded Nov 16, 2026 lists 2,511 battery storage projects in Contra Costa County with the status Paid, carrying $19,017,393 in current incentive allocations and 49,325 kWh of storage. Across every status it lists 3,962 storage projects there, 949 of them cancelled and 502 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 2,511 | 49,325 | $19,017,393 |
| PBI in Process | 18 | 25,790 | $8,002,163 |
| Reserved | 272 | 15,279 | $9,912,015 |
| Pending Reservation | 43 | 1,326 | $2,278,378 |
| Cancelled | 949 | 51,594 | $29,160,333 |
| RRF Rejected | 169 | 2,516 | $435,842 |
Installers named on the most SGIP storage projects in Contra Costa County
| Installer | Projects | Paid |
|---|---|---|
| Semper Solaris Construction Inc | 725 | 489 |
| Sunrun | 305 | 190 |
| SunPower | 251 | 159 |
| Hooked On Solar | 215 | 173 |
| Tesla | 191 | 165 |
| SOLAR 4 AMERICA | 153 | 99 |
| Tesla Energy Operations (formerly SolarCity) | 150 | 132 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 149 | 112 |
| HAVEN ENERGY SERVICES INC | 147 | 45 |
| Infinity Energy, Inc | 134 | 92 |
215 of the 3,962 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Contra Costa County (EIA)
EIA’s 2025 Service Territory file lists 2 utilities serving Contra Costa County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
SolarAPP+ automated permitting
Contra Costa County is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MPU. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
Solar contractor licenses in Contra Costa County
49 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Contra Costa County as the county: 33 with the business type Corporation, Limited Liability, Partnership or JointVenture and 16 Sole Owner. 19 C-10 Electrical licenses in Contra Costa County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Contra Costa County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 91,776
- Last 24 months
- 12,099
- Capacity
- 595.3 MW DC
- Median system size
- 5.7 kW DC
- With battery storage
- 20.1% all time; 79.0% last 24 months
- Third-party owned
- 23.1% where reported
- Ownership types recorded
- PPA 16,670, lease 3,510, prepaid lease 429, other 621
- Median battery size
- 13.5 kWh
- Earliest install in data
- May 16, 1997
Common questions
How many homes in Contra Costa County have solar?
91,776 residential solar systems in Contra Costa County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 12,099 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Contra Costa County?
413 installer names have at least one install interconnected in Contra Costa County in the last 24 months, and 1,804 appear in the full record.
How common are batteries with new solar in Contra Costa County?
20.1% of the solar installs interconnected in Contra Costa County include battery storage across all years, and 79.0% in the last 24 months (9,554 of 12,099).
How many solar installs in Contra Costa County are under NEM 3.0?
12,969 of the 91,776 residential solar installs in Contra Costa County (14.1% of the 91,775 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 89.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.