SWELL SERVICES INC DBA SWELL CONTRACTORS

How many solar installs has SWELL SERVICES INC DBA SWELL CONTRACTORS done in California, and which license number is on its installs?

SWELL SERVICES INC DBA SWELL CONTRACTORS has 1,123 residential solar installs interconnected in California, active in the records from 2018 through 2026 (Apr 6, 2018 to Jan 29, 2026), most of them in Ventura County (313), Orange County (280) and Los Angeles County (244). The license number recorded on most of its installs, 1021183, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
1,123
Last 24 months
30
Total capacity
7,535.6 kW DC
Median system size
6 kW DC
With battery storage
81.8% all time; 86.7% last 24 months
Third-party owned
0.0% of 1,123 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
41 installs, latest Oct 9, 2025
Ownership types recorded
none recorded
Median battery size
27 kWh (865 installs list a capacity)
First install
Apr 6, 2018
Latest install
Jan 29, 2026
Counties
26
Utilities
SCE 1,069, PGE 54
CSLB license
1021183

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2018 to 2026

YearInstalls interconnectedWith battery storage
20185959
20199893
2020172171
2021116116
2022242138
2023263178
2024151145
20252017
2026 (through Aug 31, 2026)22

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

41 of its 1,123 interconnected installs (3.7% of the 1,123 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.6% of those include battery storage. The latest Net Billing Tariff install was approved Oct 9, 2025.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.025923.1%not counted
NEM 2.082373.3%620 (75.3%)
Net Billing Tariff413.7%40 (97.6%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on SWELL SERVICES INC DBA SWELL CONTRACTORS’s installs. No residential system in the file lists a third-party owner name that matches SWELL SERVICES INC DBA SWELL CONTRACTORS exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 28 of SWELL SERVICES INC DBA SWELL CONTRACTORS’ 30 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (12, 42.9%) used modules recorded as REC.

In the last 24 months, 30 of SWELL SERVICES INC DBA SWELL CONTRACTORS’ 30 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (16, 53.3%) used inverters recorded as Enphase.

In the last 24 months, 25 of SWELL SERVICES INC DBA SWELL CONTRACTORS’ 30 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (22, 88.0%) used batteries recorded as Tesla.

841 of 919 battery-paired PG&E and SCE installs (91.5%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC12150
Qcells8273
LG490
SunPower3187
Hyundai2not in top list
Inverter makerEnphase16436
Tesla796
SolarEdge6367
Fronius2not in top list
SMA285
Battery makerTesla22827
FranklinWH26
LG13

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,028 of 1,123 installs, inverters on 1,123. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names SWELL SERVICES INC DBA SWELL CONTRACTORS as developer on 4,303 battery storage projects and as installer on 3,885 (3,788 name it as both), 4,400 projects in all with 125,789 kWh of storage. 3,017 have the status Paid, with $42,466,741 in current incentive allocations. Applications were received from May 1, 2017 to Feb 19, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid3,01771,764$42,466,741
PBI in Process231,673$1,556,420
Reserved502,668$2,243,378
Cancelled1,29449,361$36,754,864
RRF Rejected16324$51,990

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage2,39346,687$11,008,6431,830$8,379,277
Equity Resiliency1,78668,218$66,849,9221,134$33,328,316
Residential Storage Equity1323,854$3,276,24020$448,800
Large-Scale Storage686,429$1,650,97733$310,348
Non-Residential Storage Equity5277$235,6200$0
Not stated16324$51,9900$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1021183Not found in the CSLB License Master file pulled Nov 4, 20261,118

License numbers are the ones the utilities recorded on the interconnection applications (1,123 of 1,123 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.

Local solar permits naming its license

Solar permits in city and county open data that list SWELL SERVICES INC DBA SWELL CONTRACTORS’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20202021202220232024Total
City and County of San Francisco1021183111205
unincorporated San Diego County10211830582131371409
unincorporated Marin County1021183400004

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Ventura313
Orange280
Los Angeles244
Santa Barbara155
Riverside36
San Bernardino24
San Luis Obispo10
Santa Clara10
San Mateo8
Tulare8
Alameda6
Contra Costa5
Kern5
Solano3
Humboldt2
Inyo2
Mono2
Sonoma2
El Dorado1
Kings1
Marin1
Mendocino1
Monterey1
San Francisco1
San Joaquin1
Santa Cruz1

Top cities

CityInstalls
Santa Barbara124
Santa Ana123
Ventura75
Ojai55
Stanton36
Thousand Oaks36
Camarillo27
Irvine26
Newbury Park26
Simi Valley26
Goleta23
Santa Clarita17
Moorpark16
Long Beach15
Yorba Linda15

Names as recorded by the utilities

The utilities recorded this installer under 7 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SWELL SERVICES INC DBA SWELL CONTRACTORS688
SWELL SERVICES INC372
Swell Services Inc.55
Swell Services Inc5
Swell Services1
SWELL SERVICES INC.1
Swell Services, Inc.1

Common questions

Where does SWELL SERVICES INC DBA SWELL CONTRACTORS install solar?

Its installs are spread across 26 counties. The most are in Ventura County (313 installs), followed by Orange County (280).

How often does SWELL SERVICES INC DBA SWELL CONTRACTORS install batteries with solar?

81.8% of its interconnected solar installs include battery storage across all years, and 86.7% in the last 24 months (26 of 30).

How many SWELL SERVICES INC DBA SWELL CONTRACTORS installs are under NEM 3.0 (the Net Billing Tariff)?

41 of its 1,123 interconnected installs (3.7% of the 1,123 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 97.6% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.