Solar installers in Mono County, California
Who installs the most solar in Mono County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Mono County are BERGER SOLAR ELECTRIC LLC (15), GRID Alternatives (8) and LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC (7). They account for 30 of the 58 residential solar installs interconnected there in that window.
In all, 313 homes in Mono County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 15 of 15 installers with installs in this window. 2 installs in the window were self-installed or had no installer recorded.
| 1 | BERGER SOLAR ELECTRIC LLC | 15 | 71 |
| 2 | GRID Alternatives | 8 | 10 |
| 3 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 7 | 7 |
| 4 | Sierra Solar Inc. | 7 | 79 |
| 5 | HIGH POINT SOLAR | 6 | 44 |
| 6 | BRYTON POWER LLC | 3 | 3 |
| 7 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 2 | 2 |
| 8 | American Array Solar | 1 | 1 |
| 9 | Bishop Heating & Air Conditioning, Inc | 1 | 1 |
| 10 | FREEDOM FOREVER LLC | 1 | 4 |
| 11 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 1 | 1 |
| 12 | MMC ELECTRIC INC | 1 | 1 |
| 13 | Patton Consulting LLC | 1 | 1 |
| 14 | SKYLINE SMART ENERGY | 1 | 1 |
| 15 | VIBE SOLAR | 1 | 1 |
Most installs, all time
| 1 | Sierra Solar Inc. | 79 | 79 |
| 2 | BERGER SOLAR ELECTRIC LLC | 71 | 71 |
| 3 | HIGH POINT SOLAR | 44 | 44 |
| 4 | Highpoint Solar | 17 | 17 |
| 5 | GRID Alternatives | 10 | 10 |
| 6 | Sierra Solar/James Michael Harper | 8 | 8 |
| 7 | Generic Installer | 7 | 7 |
| 8 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 7 | 7 |
| 9 | FREEDOM FOREVER LLC | 4 | 4 |
| 10 | Sungevity, Inc. | 4 | 4 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 28 | 12 |
| 2023 | 22 | 12 |
| 2024 | 22 | 14 |
| 2025 | 31 | 30 |
| 2026 (through Aug 31, 2026) | 16 | 15 |
Under the Net Billing Tariff (NEM 3.0)
61 of the 313 residential solar installs in Mono County (19.5% of the 313 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.5% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Mono County
| 1 | BERGER SOLAR ELECTRIC LLC | 11 | 11 | 100.0% |
| 2 | HIGH POINT SOLAR | 10 | 7 | 70.0% |
| 3 | Sierra Solar Inc. | 9 | 8 | 88.9% |
| 4 | GRID Alternatives | 8 | 8 | 100.0% |
| 5 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 7 | 6 | 85.7% |
| 6 | BRYTON POWER LLC | 3 | 3 | 100.0% |
| 7 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 2 | 2 | 100.0% |
| 8 | American Array Solar | 1 | 1 | 100.0% |
| 9 | BISHOP HEATING & AIR CONDITIONING INCORPORATED | 1 | 0 | 0.0% |
| 10 | Bright Planet Solar | 1 | 0 | 0.0% |
| 11 | FREEDOM FOREVER LLC | 1 | 1 | 100.0% |
| 12 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 1 | 1 | 100.0% |
| 13 | MMC ELECTRIC INC | 1 | 1 | 100.0% |
| 14 | SKYLINE SMART ENERGY | 1 | 1 | 100.0% |
| 15 | VIBE SOLAR | 1 | 1 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Mono County
| City | All-time installs |
|---|---|
| Crowley Lake | 91 |
| Mammoth Lakes | 76 |
| Benton | 41 |
| Lee Vining | 26 |
| Bridgeport | 20 |
| June Lake | 20 |
| Swall Meadows | 17 |
| Chalfant Valley | 13 |
| Bishop | 4 |
| Chalfant | 2 |
| Hammil Valley | 1 |
| Terra Bella | 1 |
| Yucaipa | 1 |
ZIP codes in Mono County
ZIP codes with their own page where the utilities recorded Mono County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
Equipment recorded
In the last 24 months, 58 of Mono County’s 58 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (15, 25.9%) used modules recorded as SunPower.
In the last 24 months, 58 of Mono County’s 58 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (31, 53.4%) used inverters recorded as Enphase.
In the last 24 months, 51 of Mono County’s 58 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (31, 60.8%) used batteries recorded as Enphase.
88 of 98 battery-paired PG&E and SCE installs (89.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | SunPower | 15 | 63 |
| Qcells | 13 | 29 | |
| REC | 8 | 53 | |
| Silfab | 8 | 9 | |
| Canadian Solar | 6 | 24 | |
| Inverter maker | Enphase | 31 | 138 |
| Tesla | 16 | 23 | |
| SunPower | 5 | 41 | |
| EG4 | 2 | not in top list | |
| Sol-Ark | 2 | not in top list | |
| Battery maker | Enphase | 31 | 55 |
| Tesla | 19 | 27 | |
| Endurenergy | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 237 of 313 installs, inverters on 313. See the methodology and the equipment index.
SGIP battery storage projects in Mono County
The SGIP public project report downloaded Nov 16, 2026 lists 45 battery storage projects in Mono County with the status Paid, carrying $483,928 in current incentive allocations and 1,006 kWh of storage. Across every status it lists 76 storage projects there, 12 of them cancelled and 19 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 45 | 1,006 | $483,928 |
| PBI in Process | 5 | 3,493 | $2,945,664 |
| Reserved | 13 | 288 | $274,443 |
| Waitlist | 1 | 15 | $28,464 |
| Cancelled | 12 | 856 | $639,486 |
Installers named on the most SGIP storage projects in Mono County
3 of the 76 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Mono County (EIA)
EIA’s 2025 Service Territory file lists 3 utilities serving Mono County. 2 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Southern California Edison Co | Investor Owned | 746,002 | 734,452 | 6,267.868 | AC | 130,848 |
| Liberty Utilities | Investor Owned | 837 | 744 | 5.366 | AC | 60 |
Also listed for this county, with no utility-level net metering row in the 2025 file: Valley Electric Assn, Inc.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in Mono County
3 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Mono County as the county: 1 with the business type Corporation, Limited Liability, Partnership or JointVenture and 2 Sole Owner. 0 C-10 Electrical licenses in Mono County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Mono County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 313
- Last 24 months
- 58
- Capacity
- 1,964.3 kW DC
- Median system size
- 5.8 kW DC
- With battery storage
- 31.3% all time; 91.4% last 24 months
- Third-party owned
- 9.6% where reported
- Ownership types recorded
- PPA 14, lease 5, other 8
- Median battery size
- 16.2 kWh
- Earliest install in data
- May 23, 2001
Common questions
How many homes in Mono County have solar?
313 residential solar systems in Mono County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 58 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Mono County?
15 installer names have at least one install interconnected in Mono County in the last 24 months, and 50 appear in the full record.
How common are batteries with new solar in Mono County?
31.3% of the solar installs interconnected in Mono County include battery storage across all years, and 91.4% in the last 24 months (53 of 58).
How many solar installs in Mono County are under NEM 3.0?
61 of the 313 residential solar installs in Mono County (19.5% of the 313 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 88.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.