XERO SOLAR
How many solar installs has XERO SOLAR done in California, and which license number is on its installs?
XERO SOLAR has 1,115 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Nov 28, 2011 to Aug 25, 2026), most of them in Los Angeles County (1,061), Orange County (25) and Marin County (9). CSLB lists license 992157 (XERO SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to XERO SOLAR here carry more than one CSLB license number: 992157 on 1,097 (CSLB holder XERO SOLAR, El Segundo) and 1015892 on 15 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 1,115
- Last 24 months
- 267
- Total capacity
- 9,024.9 kW DC
- Median system size
- 6.8 kW DC
- With battery storage
- 68.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 72.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 0.4% of 1,091 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 241 installs, latest Aug 25, 2026
- Ownership types recorded
- lease 3, other 1
- Median battery size
- 13.5 kWh (751 installs list a capacity)
- First install
- Nov 28, 2011
- Latest install
- Aug 25, 2026
- Counties
- 12
- Utilities
- SCE 1,097, PGE 16, SDGE 2
- CSLB license
- 992157, 1015892
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2011 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2011 | 1 | 0 |
| 2012 | 8 | 0 |
| 2013 | 8 | 0 |
| 2014 | 15 | 0 |
| 2015 | 29 | 0 |
| 2016 | 19 | 0 |
| 2017 | 29 | 14 |
| 2018 | 89 | 78 |
| 2019 | 89 | 79 |
| 2020 | 78 | 68 |
| 2021 | 98 | 84 |
| 2022 | 145 | 105 |
| 2023 | 162 | 85 |
| 2024 | 123 | 91 |
| 2025 | 137 | 106 |
| 2026 (through Aug 31, 2026) | 85 | 53 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
241 of its 1,115 interconnected installs (21.6% of the 1,115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 179 | 16.1% | not counted |
| NEM 2.0 | 695 | 62.3% | 514 (74.1%) |
| Net Billing Tariff | 241 | 21.6% | 159 (66.0%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 4 of XERO SOLAR’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches XERO SOLAR exactly.
| Third-party owner named on its installs | Installs |
|---|---|
| McLaughlin, Elizabeth | 1 |
| Sunpower Capital, LLC | 1 |
| SunPower Solar Program 1, LLC | 1 |
| SunPower Solar Program I, LLC | 1 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 267 of XERO SOLAR’s 267 installs name a module maker in the “Generator Manufacturer” fields, and most of those (136, 50.9%) used modules recorded as REC.
In the last 24 months, 267 of XERO SOLAR’s 267 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (199, 74.5%) used inverters recorded as Tesla.
In the last 24 months, 191 of XERO SOLAR’s 267 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (185, 96.9%) used batteries recorded as Tesla.
734 of 763 battery-paired PG&E and SCE installs (96.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 136 | 269 |
| SunPower | 111 | 485 | |
| LG | 5 | 202 | |
| Hyundai | 2 | not in top list | |
| Qcells | 2 | not in top list | |
| Inverter maker | Tesla | 199 | 245 |
| Enphase | 34 | 259 | |
| SolarEdge | 15 | 214 | |
| SMA | 10 | 86 | |
| SunPower | 7 | 254 | |
| Battery maker | Tesla | 185 | 727 |
| FranklinWH | 4 | 4 | |
| SunPower | 1 | 1 | |
| Telsa | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,048 of 1,115 installs, inverters on 1,115. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names XERO SOLAR as developer on 659 battery storage projects and as installer on 659 (658 name it as both), 660 projects in all with 16,546 kWh of storage. 571 have the status Paid, with $3,415,827 in current incentive allocations. Applications were received from Feb 23, 2016 to Sep 11, 2024.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 571 | 13,530 | $3,415,827 |
| PBI in Process | 5 | 468 | $124,500 |
| Reserved | 1 | 26 | $6,600 |
| Cancelled | 79 | 2,460 | $967,372 |
| RRF Rejected | 4 | 63 | $23,610 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 552 | 11,038 | $2,727,365 | 501 | $2,475,525 |
| Large-Scale Storage | 90 | 4,794 | $1,171,384 | 63 | $716,302 |
| Equity Resiliency | 12 | 422 | $421,200 | 7 | $224,000 |
| Non-Residential Storage Equity | 1 | 223 | $189,550 | 0 | $0 |
| Not stated | 5 | 69 | $28,410 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 992157 | XERO SOLAR (Corporation) | CLEAR | C-10 Electrical Contractor; C-46 Solar Contractor | Apr 16, 2014 | Apr 30, 2028 | 1,097 |
| 1015892 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 15 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (1,113 of 1,115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 992157. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list XERO SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2020 | 2021 | 2023 | 2026 | Total |
|---|---|---|---|---|---|---|
| City and County of San Francisco | 992157 | 0 | 0 | 1 | 1 | 2 |
| unincorporated Marin County | 992157 | 2 | 2 | 0 | 0 | 4 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- SULLIVAN SOLAR POWER OF CALIFORNIA INC: 348 installs, license 1015892
- RSI Communities: 232 installs, license 1015892
- RSI Solar: 147 installs, license 1015892
Counties
| County | Installs |
|---|---|
| Los Angeles | 1,061 |
| Orange | 25 |
| Marin | 9 |
| Riverside | 7 |
| Mono | 2 |
| Napa | 2 |
| San Bernardino | 2 |
| San Diego | 2 |
| San Francisco | 2 |
| San Mateo | 1 |
| Santa Barbara | 1 |
| Santa Cruz | 1 |
Top cities
| City | Installs |
|---|---|
| Manhattan Beach | 456 |
| Hermosa Beach | 143 |
| Redondo Beach | 76 |
| Palos Verdes Estates | 49 |
| Rancho Palos Verdes | 42 |
| Torrance | 42 |
| Santa Monica | 40 |
| Topanga | 32 |
| Malibu | 23 |
| El Segundo | 20 |
| Culver City | 15 |
| Rolling Hills | 14 |
| Hawthorne | 13 |
| Long Beach | 13 |
| Rolling Hills Estates | 13 |
Names as recorded by the utilities
The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| XERO SOLAR | 1,028 |
| Xero Solar | 87 |
Common questions
Where does XERO SOLAR install solar?
Its installs are spread across 12 counties. The most are in Los Angeles County (1,061 installs), followed by Orange County (25).
How often does XERO SOLAR install batteries with solar?
68.6% of its interconnected solar installs include battery storage across all years, and 72.3% in the last 24 months (193 of 267). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many XERO SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?
241 of its 1,115 interconnected installs (21.6% of the 1,115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.