XERO SOLAR

How many solar installs has XERO SOLAR done in California, and which license number is on its installs?

XERO SOLAR has 1,115 residential solar installs interconnected in California, active in the records from 2011 through 2026 (Nov 28, 2011 to Aug 25, 2026), most of them in Los Angeles County (1,061), Orange County (25) and Marin County (9). CSLB lists license 992157 (XERO SOLAR) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, C-46, expires Apr 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

The installs credited to XERO SOLAR here carry more than one CSLB license number: 992157 on 1,097 (CSLB holder XERO SOLAR, El Segundo) and 1015892 on 15 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.

Interconnected installs
1,115
Last 24 months
267
Total capacity
9,024.9 kW DC
Median system size
6.8 kW DC
With battery storage
68.6% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 72.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
0.4% of 1,091 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
241 installs, latest Aug 25, 2026
Ownership types recorded
lease 3, other 1
Median battery size
13.5 kWh (751 installs list a capacity)
First install
Nov 28, 2011
Latest install
Aug 25, 2026
Counties
12
Utilities
SCE 1,097, PGE 16, SDGE 2
CSLB license
992157, 1015892

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2011 to 2026

YearInstalls interconnectedWith battery storage
201110
201280
201380
2014150
2015290
2016190
20172914
20188978
20198979
20207868
20219884
2022145105
202316285
202412391
2025137106
2026 (through Aug 31, 2026)8553

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

241 of its 1,115 interconnected installs (21.6% of the 1,115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 25, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.017916.1%not counted
NEM 2.069562.3%514 (74.1%)
Net Billing Tariff24121.6%159 (66.0%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 4 of XERO SOLAR’s installs the utility recorded a third-party ownership type: PPA 0, lease 3, prepaid lease 0, other 1. No residential system in the file lists a third-party owner name that matches XERO SOLAR exactly.

Third-party owner named on its installsInstalls
McLaughlin, Elizabeth1
Sunpower Capital, LLC1
SunPower Solar Program 1, LLC1
SunPower Solar Program I, LLC1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 267 of XERO SOLAR’s 267 installs name a module maker in the “Generator Manufacturer” fields, and most of those (136, 50.9%) used modules recorded as REC.

In the last 24 months, 267 of XERO SOLAR’s 267 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (199, 74.5%) used inverters recorded as Tesla.

In the last 24 months, 191 of XERO SOLAR’s 267 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (185, 96.9%) used batteries recorded as Tesla.

734 of 763 battery-paired PG&E and SCE installs (96.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerREC136269
SunPower111485
LG5202
Hyundai2not in top list
Qcells2not in top list
Inverter makerTesla199245
Enphase34259
SolarEdge15214
SMA1086
SunPower7254
Battery makerTesla185727
FranklinWH44
SunPower11
Telsa11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,048 of 1,115 installs, inverters on 1,115. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names XERO SOLAR as developer on 659 battery storage projects and as installer on 659 (658 name it as both), 660 projects in all with 16,546 kWh of storage. 571 have the status Paid, with $3,415,827 in current incentive allocations. Applications were received from Feb 23, 2016 to Sep 11, 2024.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid57113,530$3,415,827
PBI in Process5468$124,500
Reserved126$6,600
Cancelled792,460$967,372
RRF Rejected463$23,610

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage55211,038$2,727,365501$2,475,525
Large-Scale Storage904,794$1,171,38463$716,302
Equity Resiliency12422$421,2007$224,000
Non-Residential Storage Equity1223$189,5500$0
Not stated569$28,4100$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
992157XERO SOLAR (Corporation)CLEARC-10 Electrical Contractor; C-46 Solar ContractorApr 16, 2014Apr 30, 20281,097
1015892Not found in the CSLB License Master file pulled Nov 4, 202615

License numbers are the ones the utilities recorded on the interconnection applications (1,113 of 1,115 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 992157. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list XERO SOLAR’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2020202120232026Total
City and County of San Francisco99215700112
unincorporated Marin County99215722004

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles1,061
Orange25
Marin9
Riverside7
Mono2
Napa2
San Bernardino2
San Diego2
San Francisco2
San Mateo1
Santa Barbara1
Santa Cruz1

Top cities

CityInstalls
Manhattan Beach456
Hermosa Beach143
Redondo Beach76
Palos Verdes Estates49
Rancho Palos Verdes42
Torrance42
Santa Monica40
Topanga32
Malibu23
El Segundo20
Culver City15
Rolling Hills14
Hawthorne13
Long Beach13
Rolling Hills Estates13

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
XERO SOLAR1,028
Xero Solar87

Common questions

Where does XERO SOLAR install solar?

Its installs are spread across 12 counties. The most are in Los Angeles County (1,061 installs), followed by Orange County (25).

How often does XERO SOLAR install batteries with solar?

68.6% of its interconnected solar installs include battery storage across all years, and 72.3% in the last 24 months (193 of 267). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many XERO SOLAR installs are under NEM 3.0 (the Net Billing Tariff)?

241 of its 1,115 interconnected installs (21.6% of the 1,115 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 66.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.