How many solar installs has RSI Communities done in California, and which license number is on its installs?
RSI Communities has 232 residential solar installs interconnected in California, active in the records from 2017 through 2019 (Aug 29, 2017 to Oct 15, 2019), most of them in Riverside County (224) and San Bernardino County (8). The license number recorded on most of its installs, 1015892, was not found in the CSLB License Master file pulled Nov 4, 2026. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 232
- Last 24 months
- 0
- Total capacity
- 626 kW DC
- Median system size
- 2.7 kW DC
- With battery storage
- 0.0% all time; no installs in the last 24 months last 24 months
- Third-party owned
- 0.0% of 232 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 0 installs
- Ownership types recorded
- none recorded
- First install
- Aug 29, 2017
- Latest install
- Oct 15, 2019
- Counties
- 2
- Utilities
- SCE 232
- CSLB license
- 1015892
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2017 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2017 | 7 | 0 |
| 2018 | 136 | 0 |
| 2019 | 89 | 0 |
| 2020 | 0 | 0 |
| 2021 | 0 | 0 |
| 2022 | 0 | 0 |
| 2023 | 0 | 0 |
| 2024 | 0 | 0 |
| 2025 | 0 | 0 |
| 2026 (through Aug 31, 2026) | 0 | 0 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
None of its 232 interconnected installs with a tariff recorded (232) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 0 | 0.0% | not counted |
| NEM 2.0 | 232 | 100.0% | 0 (0.0%) |
| Net Billing Tariff | 0 | 0.0% | 0 |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
The utilities recorded no third-party ownership type (PPA or lease) on RSI Communities’s installs. No residential system in the file lists a third-party owner name that matches RSI Communities exactly.
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
Across all years, 232 of RSI Communities’ 232 installs name a module maker in the “Generator Manufacturer” fields, and most of those (133, 57.3%) used modules recorded as DuCal Solar Technology.
Across all years, 232 of RSI Communities’ 232 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (230, 99.1%) used inverters recorded as Enphase.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | DuCal Solar Technology | 0 | 133 |
| RSI Holding | 0 | 99 | |
| Inverter maker | Enphase | 0 | 230 |
| Northern Electric & Power | 0 | 2 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 232 of 232 installs, inverters on 232. See the methodology and the equipment index.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1015892 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 227 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (227 of 232 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped.
Other names reported under the same license
- XERO SOLAR: 1,115 installs, license 1015892
- SULLIVAN SOLAR POWER OF CALIFORNIA INC: 348 installs, license 1015892
- RSI Solar: 147 installs, license 1015892
Counties
| County | Installs |
|---|---|
| Riverside | 224 |
| San Bernardino | 8 |
Top cities
| City | Installs |
|---|---|
| Beaumont | 48 |
| Menifee | 44 |
| San Jacinto | 44 |
| Lake Elsinore | 43 |
| Murrieta | 26 |
| Hemet | 19 |
| Fontana | 8 |
Names as recorded by the utilities
The utilities recorded this installer under 4 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| RSI Communities | 210 |
| RSI COMMUNITIES | 14 |
| rsi communities | 5 |
| RSI communities | 3 |
Common questions
Where does RSI Communities install solar?
Its installs are spread across 2 counties. The most are in Riverside County (224 installs), followed by San Bernardino County (8).
How often does RSI Communities install batteries with solar?
0.0% of its interconnected solar installs include battery storage across all years.
How many RSI Communities installs are under NEM 3.0 (the Net Billing Tariff)?
None of its 232 interconnected installs with a tariff recorded (232) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.