Solar installers in Murrieta, California
Most installs here are in Riverside County.
Who installs the most solar in Murrieta?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Murrieta are Sunrun (492), Tesla Energy Operations (formerly SolarCity) (119) and SUNNOVA ENERGY CORPORATION (105). They account for 716 of the 1,590 residential solar installs interconnected there in that window.
In all, 16,328 homes in Murrieta have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 161 installers with installs in this window. 29 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 492 | 1,683 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 119 | 1,367 |
| 3 | SUNNOVA ENERGY CORPORATION | 105 | 338 |
| 4 | New Day Solar | 59 | 450 |
| 5 | FREEDOM FOREVER LLC | 57 | 350 |
| 6 | BRIGHT OPS | 53 | 62 |
| 7 | Current Home | 53 | 266 |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 41 | 124 |
| 9 | Empower Electric Solar | 30 | 58 |
| 10 | MY SMART HOUSE LLC | 30 | 33 |
| 11 | Blalock electric | 28 | 179 |
| 12 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 28 | 45 |
| 13 | EXO Energy | 21 | 99 |
| 14 | Semper Solaris Construction Inc | 20 | 288 |
| 15 | BETTER EARTH ELECTRIC INC | 18 | 75 |
| 16 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 16 | 16 |
| 17 | Pacific Sun Technologies | 16 | 39 |
| 18 | BAKER HOME ENERGY | 15 | 16 |
| 19 | GAF Energy | 14 | 15 |
| 20 | ORANGE COUNTY CONTRACTING SERVICES | 14 | 23 |
| 21 | SOLAR TECH ENERGY SYSTEMS INC | 14 | 73 |
| 22 | AXIA SOLAR CORP | 13 | 13 |
| 23 | POWER UP SOLUTIONS LLC | 13 | 16 |
| 24 | Powur PBC (Powur Home) | 13 | 95 |
| 25 | SolarMax Renewable Energy Provider, Inc | 11 | 190 |
Most installs, all time
| 1 | SunPower | 1,841 | 1,841 |
| 2 | Sunrun | 1,683 | 1,683 |
| 3 | Tesla Energy Operations (formerly SolarCity) | 1,367 | 1,367 |
| 4 | Solcius | 790 | 790 |
| 5 | Vivint Solar Developer, LLC | 602 | 602 |
| 6 | New Day Solar | 450 | 450 |
| 7 | Horizon Solar Power | 372 | 372 |
| 8 | FREEDOM FOREVER LLC | 350 | 350 |
| 9 | SUNNOVA ENERGY CORPORATION | 338 | 338 |
| 10 | Semper Solaris Construction Inc | 288 | 288 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 1,956 | 230 |
| 2023 | 1,833 | 266 |
| 2024 | 943 | 732 |
| 2025 | 808 | 762 |
| 2026 (through Aug 31, 2026) | 480 | 426 |
Under the Net Billing Tariff (NEM 3.0)
2,082 of the 16,328 residential solar installs in Murrieta (12.8% of the 16,328 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Murrieta
| 1 | Sunrun | 632 | 594 | 94.0% |
| 2 | SUNNOVA ENERGY CORPORATION | 215 | 190 | 88.4% |
| 3 | Tesla Energy Operations (formerly SolarCity) | 116 | 107 | 92.2% |
| 4 | FREEDOM FOREVER LLC | 73 | 72 | 98.6% |
| 5 | Current Home | 69 | 68 | 98.6% |
| 6 | BRIGHT OPS | 62 | 60 | 96.8% |
| 7 | New Day Solar | 54 | 50 | 92.6% |
| 8 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 43 | 43 | 100.0% |
| 9 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 39 | 36 | 92.3% |
| 10 | SunPower | 38 | 33 | 86.8% |
| 11 | Empower Electric Solar | 37 | 37 | 100.0% |
| 12 | MY SMART HOUSE LLC | 33 | 33 | 100.0% |
| 13 | EXO Energy | 30 | 24 | 80.0% |
| 14 | Semper Solaris Construction Inc | 29 | 27 | 93.1% |
| 15 | Blalock electric | 28 | 25 | 89.3% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 1,584 of Murrieta’s 1,590 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (708, 44.7%) used modules recorded as Qcells.
In the last 24 months, 1,590 of Murrieta’s 1,590 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (819, 51.5%) used inverters recorded as Tesla.
In the last 24 months, 1,434 of Murrieta’s 1,590 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (1,050, 73.2%) used batteries recorded as Tesla.
2,654 of 2,770 battery-paired PG&E and SCE installs (95.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 708 | 3,205 |
| LONGi | 211 | 902 | |
| JA Solar | 178 | 595 | |
| Silfab | 111 | not in top list | |
| SunPower | 82 | 2,070 | |
| Inverter maker | Tesla | 819 | 1,108 |
| Enphase | 528 | 5,152 | |
| SolarEdge | 301 | 5,119 | |
| SunPower | 51 | 2,237 | |
| Delta Electronics | 37 | 387 | |
| Battery maker | Tesla | 1,050 | 1,601 |
| Enphase | 211 | 395 | |
| SolarEdge | 106 | 202 | |
| FranklinWH | 27 | 41 | |
| LG | 22 | 303 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 12,980 of 16,328 installs, inverters on 16,321. See the methodology and the equipment index.
ZIP codes in Murrieta
ZIP codes with their own page where the utilities recorded Murrieta on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Murrieta
The SGIP report lists 643 battery storage projects with the city Murrieta, 359 with the status Paid ($4,882,066 in current incentive allocations, 8,038 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 359 | 8,038 | $4,882,066 |
| PBI in Process | 1 | 223 | $55,750 |
| Reserved | 44 | 663 | $613,349 |
| Pending Reservation | 16 | 1,090 | $488,434 |
| Waitlist | 25 | 438 | $596,523 |
| Cancelled | 186 | 12,908 | $8,623,472 |
| RRF Rejected | 12 | 173 | $23,112 |
Installers named on the most SGIP storage projects in Murrieta
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 128 | 83 |
| Semper Solaris Construction Inc | 69 | 51 |
| SunPower | 41 | 21 |
| APOLLO HOME POWER LLC | 26 | 0 |
| New Day Solar | 25 | 16 |
| Tesla | 21 | 16 |
| SolarMax Renewable Energy Provider, Inc | 18 | 14 |
| Infinity Energy, Inc | 16 | 8 |
| Pacific Sun Technologies | 14 | 9 |
| Solar Pros Inc. | 14 | 1 |
71 of the 643 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
SolarAPP+ automated permitting
Murrieta is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST, MBD. The list gives no start date.
Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.
At a glance
- Residential solar installs
- 16,328
- Last 24 months
- 1,590
- Capacity
- 118.5 MW DC
- Median system size
- 6.6 kW DC
- With battery storage
- 17.0% all time; 92.3% last 24 months
- Third-party owned
- 42.8% where reported
- Ownership types recorded
- PPA 4,244, lease 1,598, prepaid lease 13, other 469
- Median battery size
- 13.5 kWh
- Earliest install in data
- Aug 14, 2001
Common questions
How many homes in Murrieta have solar?
16,328 residential solar systems in Murrieta were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,590 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Murrieta?
161 installer names have at least one install interconnected in Murrieta in the last 24 months, and 825 appear in the full record.
How common are batteries with new solar in Murrieta?
17.0% of the solar installs interconnected in Murrieta include battery storage across all years, and 92.3% in the last 24 months (1,467 of 1,590).
How many solar installs in Murrieta are under NEM 3.0?
2,082 of the 16,328 residential solar installs in Murrieta (12.8% of the 16,328 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.