POWER UP SOLUTIONS LLC
How many solar installs has POWER UP SOLUTIONS LLC done in California, and which license number is on its installs?
POWER UP SOLUTIONS LLC has 848 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Feb 13, 2024 to Aug 31, 2026), most of them in Riverside County (156), San Joaquin County (136) and Santa Clara County (81). CSLB lists license 1113778 (POWER UP SOLUTIONS LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Dec 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
- Interconnected installs
- 848
- Last 24 months
- 747
- Total capacity
- 6,460.4 kW DC
- Median system size
- 6.9 kW DC
- With battery storage
- 94.5% all time; 95.9% last 24 months
- Third-party owned
- 87.0% of 848 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 792 installs, latest Aug 31, 2026
- Ownership types recorded
- PPA 738
- Median battery size
- 13.5 kWh (280 installs list a capacity)
- First install
- Feb 13, 2024
- Latest install
- Aug 31, 2026
- Counties
- 41
- Utilities
- PGE 582, SCE 266
- CSLB license
- 1113778
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2024 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2024 | 243 | 206 |
| 2025 | 406 | 398 |
| 2026 (through Aug 31, 2026) | 199 | 197 |
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
792 of its 848 interconnected installs (93.4% of the 848 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.3% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 18 | 2.1% | not counted |
| NEM 2.0 | 38 | 4.5% | 37 (97.4%) |
| Net Billing Tariff | 792 | 93.4% | 747 (94.3%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.
Leases, PPAs and third-party owners
On 738 of POWER UP SOLUTIONS LLC’s installs the utility recorded a third-party ownership type: PPA 738, lease 0, prepaid lease 0, other 0. Across all installers, 14 residential systems list a third-party owner name that matches POWER UP SOLUTIONS LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| EverBright | 455 |
| Goodleap | 212 |
| Concert | 30 |
| PROPEL | 14 |
| LightReach | 13 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 667 of POWER UP SOLUTIONS LLC’s 747 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (289, 43.3%) used modules recorded as Qcells.
In the last 24 months, 747 of POWER UP SOLUTIONS LLC’s 747 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (660, 88.4%) used inverters recorded as Enphase.
In the last 24 months, 641 of POWER UP SOLUTIONS LLC’s 747 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (449, 70.0%) used batteries recorded as Enphase.
720 of 801 battery-paired PG&E and SCE installs (89.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 289 | 294 |
| LONGi | 216 | 221 | |
| Mission Solar | 101 | 101 | |
| Canadian Solar | 42 | 122 | |
| JA Solar | 31 | 31 | |
| Inverter maker | Enphase | 660 | 761 |
| Tesla | 181 | 182 | |
| SolarEdge | 63 | 66 | |
| SunPower | 15 | 17 | |
| ABB | 14 | 17 | |
| Battery maker | Enphase | 449 | 528 |
| Tesla | 187 | 187 | |
| FranklinWH | 3 | 3 | |
| PointGuard Energy Inc. | 3 | 3 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 755 of 848 installs, inverters on 848. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names POWER UP SOLUTIONS LLC as developer on 2 battery storage projects and as installer on 1 (1 name it as both), 2 projects in all with 36 kWh of storage. 1 have the status Paid, with $9,706 in current incentive allocations. Applications were received from Aug 1, 2023 to Oct 25, 2025.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 1 | 10 | $9,706 |
| Cancelled | 1 | 26 | $3,960 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Equity Resiliency | 1 | 10 | $9,706 | 1 | $9,706 |
| Small Residential Storage | 1 | 26 | $3,960 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1113778 | POWER UP SOLUTIONS LLC (Limited Liability) | CLEAR | C-10 Electrical Contractor | Dec 12, 2023 | Dec 31, 2027 | 848 |
License numbers are the ones the utilities recorded on the interconnection applications (848 of 848 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1113778. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list POWER UP SOLUTIONS LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2024 | 2025 | 2026 | Total |
|---|---|---|---|---|---|
| unincorporated San Diego County | 1113778 | 3 | 6 | 23 | 32 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Other names reported under the same license
- Power Up: 98 installs, license 1113778
Counties
Top cities
| City | Installs |
|---|---|
| Stockton | 98 |
| San Jose | 55 |
| Hemet | 32 |
| Moreno Valley | 25 |
| Merced | 19 |
| Perris | 18 |
| Manteca | 17 |
| Lincoln | 16 |
| Murrieta | 16 |
| Yuba City | 16 |
| Fresno | 15 |
| Riverbank | 14 |
| Atwater | 13 |
| Olivehurst | 12 |
| Antioch | 11 |
Names as recorded by the utilities
The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| POWER UP SOLUTIONS LLC | 848 |
Common questions
Where does POWER UP SOLUTIONS LLC install solar?
Its installs are spread across 41 counties. The most are in Riverside County (156 installs), followed by San Joaquin County (136).
How often does POWER UP SOLUTIONS LLC install batteries with solar?
94.5% of its interconnected solar installs include battery storage across all years, and 95.9% in the last 24 months (716 of 747).
How many POWER UP SOLUTIONS LLC installs are under NEM 3.0 (the Net Billing Tariff)?
792 of its 848 interconnected installs (93.4% of the 848 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 94.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.