Solar installers in Yuba City, California

Most installs here are in Sutter County.

Who installs the most solar in Yuba City?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Yuba City are Sunrun (186), Citadel Roofing and Solar (138) and Westhaven Inc (76). They account for 400 of the 971 residential solar installs interconnected there in that window.

In all, 8,289 homes in Yuba City have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 98 installers with installs in this window. 20 installs in the window were self-installed or had no installer recorded.

1Sunrun186582
2Citadel Roofing and Solar138154
3Westhaven Inc761,182
4FOCUS SOLAR ENERGY INC7074
5SonRay Construction Inc.5455
6HAMMOND JIM ELECTRIC INC38212
7BRIGHT OPS3240
8Tesla Energy Operations (formerly SolarCity)29795
9POWUR HOME CONSTRUCTION2760
10FREEDOM FOREVER LLC20145
11NORTH VALLEY LLC2057
12V3 Electric19345
13OHM SOLAR SOLUTIONS1738
14POWER UP SOLUTIONS LLC1216
15SENGA ENERGY LLC926
16DYNAMIC ENERGY & ELECTRIC821
17FIVE STAR SOLAR830
18FLAGSHIP SOLAR88
19BETTER EARTH ELECTRIC INC722
20CONTINUUM77
21AMBROSE SOLAR626
22AXIA SOLAR CORP66
23SOLAR AND ROOF DIRECT66
24SOLAR SAVINGS DIRECT INC614
25Empower Electric Solar540

Most installs, all time

1Westhaven Inc1,1821,182
2Tesla Energy Operations (formerly SolarCity)795795
3Sunrun582582
4Vivint Solar Developer, LLC436436
5V3 Electric345345
6Infinity Energy, Inc297297
7Bright Planet Solar253253
8HAMMOND JIM ELECTRIC INC212212
9Gold Rush Energy Solutions155155
10Citadel Roofing and Solar154154

Installs by year

YearInstalls interconnectedWith battery storage
202290548
202397698
2024483344
2025516358
2026 (through Aug 31, 2026)288193

Under the Net Billing Tariff (NEM 3.0)

1,056 of the 8,289 residential solar installs in Yuba City (12.7% of the 8,289 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.0% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Yuba City

1Sunrun240240100.0%
2Westhaven Inc11611397.4%
3Citadel Roofing and Solar6000.0%
4FOCUS SOLAR ENERGY INC5959100.0%
5POWUR HOME CONSTRUCTION565598.2%
6BRIGHT OPS403690.0%
7NORTH VALLEY LLC3939100.0%
8Tesla Energy Operations (formerly SolarCity)383284.2%
9V3 Electric3131100.0%
10FREEDOM FOREVER LLC272385.2%
11HAMMOND JIM ELECTRIC INC221986.4%
12OHM SOLAR SOLUTIONS222195.5%
13POWER UP SOLUTIONS LLC1414100.0%
14Empower Electric Solar121083.3%
15SENGA ENERGY LLC121191.7%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 908 of Yuba City’s 971 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (269, 29.6%) used modules recorded as Qcells.

In the last 24 months, 971 of Yuba City’s 971 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (442, 45.5%) used inverters recorded as Enphase.

In the last 24 months, 543 of Yuba City’s 971 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (269, 49.5%) used batteries recorded as Tesla.

899 of 1,100 battery-paired PG&E and SCE installs (81.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2691,698
JA Solar171293
LONGi105533
Canadian Solar95617
Silfab95not in top list
Inverter makerEnphase4423,100
Tesla433632
SolarEdge1552,796
PointGuard Energy Inc.17not in top list
SMA17753
Battery makerTesla269393
Enphase167302
SolarEdge6299
PointGuard Energy Inc.1717
LG831

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,495 of 8,289 installs, inverters on 8,288. See the methodology and the equipment index.

ZIP codes in Yuba City

ZIP codes with their own page where the utilities recorded Yuba City on at least 10% of the ZIP’s installs, through Aug 31, 2026.

959934,8644,864622
959913,4243,424349

SGIP battery storage projects in Yuba City

The SGIP report lists 92 battery storage projects with the city Yuba City, 46 with the status Paid ($1,014,481 in current incentive allocations, 2,469 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid462,469$1,014,481
Reserved133,307$742,921
Pending Reservation229$72,363
Cancelled22365$268,133
RRF Rejected9121$22,103

Installers named on the most SGIP storage projects in Yuba City

InstallerProjectsPaid
Westhaven Solar139
V3 Electric72
Hooked On Solar65
HAVEN ENERGY SERVICES INC51
SOLAR SAVINGS DIRECT INC50
SunPower54
GRID Alternatives42
Infinity Energy, Inc43
PetersenDean32
SOLAR 4 AMERICA32

8 of the 92 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

SolarAPP+ automated permitting

Yuba City is on SolarAPP+’s public list of jurisdictions where its automated solar permitting is available, as read on Nov 16, 2026, marked for PV, PV+ST. The list gives no start date.

Matched by exact name to the SolarAPP+ public list. A listing says the jurisdiction accepts SolarAPP+ permits; it is not a statement about any installer or permit. All California SolarAPP+ jurisdictions.

At a glance

Residential solar installs
8,289
Last 24 months
971
Capacity
62.5 MW DC
Median system size
7 kW DC
With battery storage
13.3% all time; 69.6% last 24 months
Third-party owned
27.0% where reported
Ownership types recorded
PPA 1,874, lease 270, prepaid lease 8, other 85
Median battery size
13.5 kWh
Earliest install in data
Nov 14, 2001

Common questions

How many homes in Yuba City have solar?

8,289 residential solar systems in Yuba City were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 971 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Yuba City?

98 installer names have at least one install interconnected in Yuba City in the last 24 months, and 452 appear in the full record.

How common are batteries with new solar in Yuba City?

13.3% of the solar installs interconnected in Yuba City include battery storage across all years, and 69.6% in the last 24 months (676 of 971).

How many solar installs in Yuba City are under NEM 3.0?

1,056 of the 8,289 residential solar installs in Yuba City (12.7% of the 8,289 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.