POWUR HOME CONSTRUCTION

How many solar installs has POWUR HOME CONSTRUCTION done in California, and which license number is on its installs?

POWUR HOME CONSTRUCTION has 690 residential solar installs interconnected in California, active in the records from 2023 through 2026 (Sep 28, 2023 to Aug 28, 2026), most of them in Fresno County (92), Contra Costa County (67) and Sutter County (65). CSLB lists license 1060243 (POWUR HOME CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Nov 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
690
Last 24 months
492
Total capacity
5,876.1 kW DC
Median system size
8.1 kW DC
With battery storage
91.7% all time; 94.1% last 24 months
Third-party owned
4.8% of 690 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
648 installs, latest Aug 28, 2026
Ownership types recorded
PPA 4, lease 29
Median battery size
14 kWh (355 installs list a capacity)
First install
Sep 28, 2023
Latest install
Aug 28, 2026
Counties
38
Utilities
PGE 690
CSLB license
1060243

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2023 to 2026

YearInstalls interconnectedWith battery storage
20232213
2024240218
2025272262
2026 (through Aug 31, 2026)156140

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

648 of its 690 interconnected installs (93.9% of the 690 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.1% of those include battery storage. The latest Net Billing Tariff install was approved Aug 28, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0162.3%not counted
NEM 2.0263.8%17 (65.4%)
Net Billing Tariff64893.9%603 (93.1%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 33 of POWUR HOME CONSTRUCTION’s installs the utility recorded a third-party ownership type: PPA 4, lease 29, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches POWUR HOME CONSTRUCTION exactly.

Third-party owner named on its installsInstalls
Sunnova24
GoodLeap9

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 467 of POWUR HOME CONSTRUCTION’s 492 installs name a module maker in the “Generator Manufacturer” fields, and most of those (298, 63.8%) used modules recorded as Qcells.

In the last 24 months, 492 of POWUR HOME CONSTRUCTION’s 492 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (338, 68.7%) used inverters recorded as Tesla.

In the last 24 months, 357 of POWUR HOME CONSTRUCTION’s 492 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (239, 66.9%) used batteries recorded as Tesla.

512 of 633 battery-paired PG&E and SCE installs (80.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells298427
JinkoSolar123126
REC3065
JA Solar1414
Canadian Solar719
Inverter makerTesla338358
Enphase121262
SolarEdge56111
FranklinWH3172
SMA1015
Battery makerTesla239258
Enphase59138
SolarEdge3154
FranklinWH2864

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 649 of 690 installs, inverters on 690. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1060243POWUR HOME CONSTRUCTION (Corporation)CLEAR, Pending Case/CITB General Building Contractor; C-10 Electrical ContractorNov 12, 2019Nov 30, 2027690

License numbers are the ones the utilities recorded on the interconnection applications (690 of 690 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1060243. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list POWUR HOME CONSTRUCTION’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense202120222023202420252026Total
City and County of San Francisco1060243141792033
unincorporated San Diego County1060243343931805162

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Fresno92
Contra Costa67
Sutter65
San Joaquin61
Santa Clara47
Alameda37
Sonoma27
Merced25
San Mateo24
San Luis Obispo23
Lake20
Kern16
Tehama16
Mendocino14
Monterey14
Solano13
Nevada12
Butte11
Placer10
Santa Barbara8
Yolo8
Madera7
El Dorado6
Marin6
Napa6
San Benito6
Tulare6
Yuba6
Glenn5
Kings5
San Francisco5
Shasta5
Stanislaus5
Calaveras4
Santa Cruz3
Amador2
Colusa2
Tuolumne1

Top cities

CityInstalls
Fresno61
Yuba City60
Stockton33
San Jose28
Clovis16
Bakersfield14
Red Bluff12
Merced10
Tracy10
Ukiah10
Penn Valley9
Salinas8
Santa Rosa8
Antioch7
Avila Beach7

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
POWUR HOME CONSTRUCTION690

Common questions

Where does POWUR HOME CONSTRUCTION install solar?

Its installs are spread across 38 counties. The most are in Fresno County (92 installs), followed by Contra Costa County (67).

How often does POWUR HOME CONSTRUCTION install batteries with solar?

91.7% of its interconnected solar installs include battery storage across all years, and 94.1% in the last 24 months (463 of 492).

How many POWUR HOME CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

648 of its 690 interconnected installs (93.9% of the 690 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 93.1% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.