Solar installers in Tehama County, California
Who installs the most solar in Tehama County?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Tehama County are Sunrun (99), BRIGHT OPS (76) and FREEDOM FOREVER LLC (65). They account for 240 of the 649 residential solar installs interconnected there in that window.
In all, 5,945 homes in Tehama County have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 89 installers with installs in this window. 47 installs in the window were self-installed or had no installer recorded.
| 1 | Sunrun | 99 | 310 |
| 2 | BRIGHT OPS | 76 | 86 |
| 3 | FREEDOM FOREVER LLC | 65 | 490 |
| 4 | OHM SOLAR SOLUTIONS | 59 | 319 |
| 5 | CORONEL SOLAR | 22 | 25 |
| 6 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 16 | 16 |
| 7 | Alternative Energy Systems, Inc. | 15 | 295 |
| 8 | Westhaven Inc | 11 | 23 |
| 9 | ACCELERATED ENVIRONMENTAL SERVICES INC | 10 | 10 |
| 10 | Huhn Electric | 10 | 119 |
| 11 | ORIGIN SOLAR USA INC | 10 | 10 |
| 12 | PEAK ENERGY GROUP | 10 | 10 |
| 13 | Wing Solar & Wood Energy, Inc. | 10 | 203 |
| 14 | AXIA SOLAR CORP | 9 | 9 |
| 15 | Hufft Solar inc | 9 | 10 |
| 16 | Shepard & Sun Solar | 9 | 11 |
| 17 | INTEGRITY HEATING, AIR & SOLAR | 8 | 57 |
| 18 | NORTH VALLEY LLC | 8 | 19 |
| 19 | POWUR HOME CONSTRUCTION | 8 | 16 |
| 20 | D W PLUMBING INC | 7 | 18 |
| 21 | IE CONSTRUCTION | 7 | 31 |
| 22 | PREMIER SOLAR ENERGY INC | 7 | 172 |
| 23 | Electric Solar Solutions Inc. | 6 | 55 |
| 24 | FOCUS SOLAR ENERGY INC | 5 | 5 |
| 25 | EVERGREEN SOLAR | 4 | 4 |
Most installs, all time
| 1 | FREEDOM FOREVER LLC | 490 | 490 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 342 | 342 |
| 3 | OHM SOLAR SOLUTIONS | 319 | 319 |
| 4 | Sunrun | 310 | 310 |
| 5 | Alternative Energy Systems, Inc. | 295 | 295 |
| 6 | Vivint Solar Developer, LLC | 264 | 264 |
| 7 | Wing Solar & Wood Energy, Inc. | 203 | 203 |
| 8 | PREMIER SOLAR ENERGY INC | 172 | 172 |
| 9 | Complete Solar | 158 | 158 |
| 10 | Huhn Electric | 119 | 119 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 689 | 35 |
| 2023 | 882 | 74 |
| 2024 | 434 | 254 |
| 2025 | 364 | 271 |
| 2026 (through Aug 31, 2026) | 177 | 142 |
Under the Net Billing Tariff (NEM 3.0)
795 of the 5,945 residential solar installs in Tehama County (13.4% of the 5,945 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.0% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Tehama County
| 1 | Sunrun | 126 | 125 | 99.2% |
| 2 | FREEDOM FOREVER LLC | 98 | 93 | 94.9% |
| 3 | OHM SOLAR SOLUTIONS | 97 | 94 | 96.9% |
| 4 | BRIGHT OPS | 86 | 75 | 87.2% |
| 5 | PREMIER SOLAR ENERGY INC | 25 | 24 | 96.0% |
| 6 | Alternative Energy Systems, Inc. | 16 | 15 | 93.8% |
| 7 | FREEDOM FOREVER NORTHERN CALIFORNIA LLC | 16 | 16 | 100.0% |
| 8 | POWUR HOME CONSTRUCTION | 16 | 16 | 100.0% |
| 9 | NORTH VALLEY LLC | 12 | 12 | 100.0% |
| 10 | ACCELERATED ENVIRONMENTAL SERVICES INC | 10 | 10 | 100.0% |
| 11 | Hufft Solar inc | 10 | 10 | 100.0% |
| 12 | Huhn Electric | 10 | 4 | 40.0% |
| 13 | ORIGIN SOLAR USA INC | 10 | 10 | 100.0% |
| 14 | PEAK ENERGY GROUP | 10 | 10 | 100.0% |
| 15 | Westhaven Inc | 10 | 10 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Cities in Tehama County
| City | All-time installs |
|---|---|
| Red Bluff | 3,030 |
| Corning | 1,555 |
| Cottonwood | 547 |
| Los Molinos | 372 |
| Gerber | 227 |
| Tehama | 48 |
| Orland | 41 |
| Vina | 39 |
| Manton | 31 |
| Proberta | 13 |
| Flournoy | 11 |
| Paskenta | 10 |
| Paynes Creek | 9 |
| Chico | 2 |
| Capay | 1 |
| Platina | 1 |
ZIP codes in Tehama County
ZIP codes with their own page where the utilities recorded Tehama County on at least 10% of the ZIP’s installs, through Aug 31, 2026.
| 96080 | 3,030 | 3,030 | 295 |
| 96021 | 1,556 | 1,556 | 163 |
| 96022 | 546 | 1,890 | 210 |
| 96055 | 372 | 372 | 48 |
| 96035 | 227 | 227 | 25 |
| 96090 | 48 | 48 | 6 |
| 96092 | 39 | 39 | 5 |
| 96059 | 31 | 38 | 4 |
Equipment recorded
In the last 24 months, 610 of Tehama County’s 649 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (213, 34.9%) used modules recorded as Qcells.
In the last 24 months, 649 of Tehama County’s 649 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (303, 46.7%) used inverters recorded as Enphase.
In the last 24 months, 410 of Tehama County’s 649 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (179, 43.7%) used batteries recorded as Tesla.
715 of 861 battery-paired PG&E and SCE installs (83.0%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 213 | 1,343 |
| JA Solar | 80 | not in top list | |
| LONGi | 60 | 427 | |
| Silfab | 56 | not in top list | |
| Trina Solar | 39 | 256 | |
| Inverter maker | Enphase | 303 | 2,982 |
| Tesla | 224 | 348 | |
| SolarEdge | 169 | 1,674 | |
| Qcells | 12 | not in top list | |
| Sol-Ark | 12 | not in top list | |
| Battery maker | Tesla | 179 | 273 |
| Enphase | 118 | 243 | |
| SolarEdge | 105 | 139 | |
| FranklinWH | 3 | 9 | |
| LG | 2 | 39 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 5,527 of 5,945 installs, inverters on 5,944. See the methodology and the equipment index.
SGIP battery storage projects in Tehama County
The SGIP public project report downloaded Nov 16, 2026 lists 84 battery storage projects in Tehama County with the status Paid, carrying $1,476,314 in current incentive allocations and 1,991 kWh of storage. Across every status it lists 167 storage projects there, 64 of them cancelled and 19 at another stage.
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 84 | 1,991 | $1,476,314 |
| PBI in Process | 5 | 3,569 | $2,891,712 |
| Reserved | 9 | 320 | $241,600 |
| Pending Reservation | 2 | 32 | $65,561 |
| Cancelled | 64 | 15,545 | $4,110,033 |
| RRF Rejected | 3 | 48 | $7,139 |
Installers named on the most SGIP storage projects in Tehama County
| Installer | Projects | Paid |
|---|---|---|
| Infinity Energy, Inc | 39 | 23 |
| Alternative Energy Systems, Inc. | 16 | 11 |
| Sunrun | 12 | 10 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 12 | 10 |
| Top Hat Energy inc | 11 | 3 |
| Phoenix Solar Energy | 10 | 4 |
| Tesla | 9 | 5 |
| KUUBIX GLOBAL LLC | 6 | 3 |
| Kuubix Energy Inc. | 5 | 2 |
| HAVEN ENERGY SERVICES INC | 4 | 1 |
15 of the 167 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
Electric utilities serving Tehama County (EIA)
EIA’s 2025 Service Territory file lists 2 utilities serving Tehama County. 1 filed net metering rows; their counts below cover each utility’s whole California service area, not only this county.
| Utility (EIA name) | Ownership (EIA) | PV installations | Residential | PV capacity MW | Unit | PV-paired batteries |
|---|---|---|---|---|---|---|
| Pacific Gas & Electric Co. | Investor Owned | 949,590 | 924,854 | 9,449.31 | AC | 178,468 |
Also listed for this county, with no utility-level net metering row in the 2025 file: WAPA-- Western Area Power Administration.
From EIA’s Form EIA-861 2025 data files (downloaded Nov 16, 2026). EIA describes the net metering file this way: “The data contain cumulative installation count and capacity of generators that are net metered by technology, state, sector, and balancing authority.” Counts are utility-reported as of December 31, 2025, for each utility’s whole California service area. Unit is the capacity unit the utility reported, AC or DC; EIA’s utility rows are “reported as collected,” so DC and AC figures are not converted here. Blank cells are cells EIA printed as a period. EIA’s file notes: “All Technologies does not include batteries.”
Solar contractor licenses in Tehama County
2 C-46 Solar licenses in the CSLB License Master file downloaded Nov 4, 2026 (latest LastUpdate date in the file: Nov 4, 2026) list Tehama County as the county: 1 with the business type Corporation, Limited Liability, Partnership or JointVenture and 1 Sole Owner. 6 C-10 Electrical licenses in Tehama County carry license numbers the utilities recorded on 10 or more residential solar records.
Solar contractor licenses in Tehama County, with status, bond and workers’ compensation fields as CSLB publishes them. Sole Owner licenses are counted but not named.
At a glance
- Residential solar installs
- 5,945
- Last 24 months
- 649
- Capacity
- 48.4 MW DC
- Median system size
- 7.4 kW DC
- With battery storage
- 14.5% all time; 75.7% last 24 months
- Third-party owned
- 26.0% where reported
- Ownership types recorded
- PPA 1,009, lease 489, prepaid lease 2, other 48
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jan 23, 2002
Common questions
How many homes in Tehama County have solar?
5,945 residential solar systems in Tehama County were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 649 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Tehama County?
89 installer names have at least one install interconnected in Tehama County in the last 24 months, and 365 appear in the full record.
How common are batteries with new solar in Tehama County?
14.5% of the solar installs interconnected in Tehama County include battery storage across all years, and 75.7% in the last 24 months (491 of 649).
How many solar installs in Tehama County are under NEM 3.0?
795 of the 5,945 residential solar installs in Tehama County (13.4% of the 5,945 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 84.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.