Shepard & Sun Solar

How many solar installs has Shepard & Sun Solar done in California, and which license number is on its installs?

Shepard & Sun Solar has 79 residential solar installs interconnected in California, active in the records from 2022 through 2026 (Oct 12, 2022 to Aug 5, 2026), most of them in Butte County (40), Shasta County (21) and Tehama County (11). CSLB lists license 1074814 (SHEPARD & SUN SOLAR INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-46, expires Aug 31, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
79
Last 24 months
35
Total capacity
533.9 kW DC
Median system size
6.1 kW DC
With battery storage
8.9% all time; 20.0% last 24 months
Third-party owned
0.0% of 79 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
32 installs, latest Aug 5, 2026
Ownership types recorded
none recorded
Median battery size
40 kWh (3 installs list a capacity)
First install
Oct 12, 2022
Latest install
Aug 5, 2026
Counties
5
Utilities
PGE 79
CSLB license
1074814

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2022 to 2026

YearInstalls interconnectedWith battery storage
202230
2023310
2024141
2025202
2026 (through Aug 31, 2026)114

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

32 of its 79 interconnected installs (40.5% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 21.9% of those include battery storage. The latest Net Billing Tariff install was approved Aug 5, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.04759.5%0 (0.0%)
Net Billing Tariff3240.5%7 (21.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on Shepard & Sun Solar’s installs. No residential system in the file lists a third-party owner name that matches Shepard & Sun Solar exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 33 of Shepard & Sun Solar’s 35 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (13, 39.4%) used modules recorded as Canadian Solar.

In the last 24 months, 35 of Shepard & Sun Solar’s 35 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (31, 88.6%) used inverters recorded as Enphase.

In the last 24 months, 6 of Shepard & Sun Solar’s 35 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (4, 66.7%) used batteries recorded as Enphase.

6 of 7 battery-paired PG&E and SCE installs (85.7%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerCanadian Solar1330
CertainTeed79
Qcells723
LONGi37
Mission Solar2not in top list
Inverter makerEnphase3175
Tesla33
SolarEdge12
SunPower11
Battery makerEnphase44
Tesla22

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 75 of 79 installs, inverters on 79. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1074814SHEPARD & SUN SOLAR INC (Corporation)CLEARC-46 Solar ContractorApr 15, 2021Aug 31, 202879

License numbers are the ones the utilities recorded on the interconnection applications (79 of 79 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1074814. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Butte40
Shasta21
Tehama11
Glenn6
Plumas1

Top cities

CityInstalls
Cottonwood21
Chico19
Paradise11
Durham4
Hamilton City3
Orland3
Oroville3
Red Bluff3
Redding3
Palo Cedro2
Richvale2
Anderson1
Chester1
Gerber1
Magalia1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
SHEPARD & SUN SOLAR INC52
Shepard & Sun Solar27

Common questions

Where does Shepard & Sun Solar install solar?

Its installs are spread across 5 counties. The most are in Butte County (40 installs), followed by Shasta County (21).

How often does Shepard & Sun Solar install batteries with solar?

8.9% of its interconnected solar installs include battery storage across all years, and 20.0% in the last 24 months (7 of 35).

How many Shepard & Sun Solar installs are under NEM 3.0 (the Net Billing Tariff)?

32 of its 79 interconnected installs (40.5% of the 79 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 21.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.