Solar installers in Chico, California

Most installs here are in Butte County.

Who installs the most solar in Chico?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Chico are Sunrun (190), OHM SOLAR SOLUTIONS (96) and Alternative Energy Systems, Inc. (82). They account for 368 of the 1,145 residential solar installs interconnected there in that window.

In all, 12,800 homes in Chico have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 96 installers with installs in this window. 105 installs in the window were self-installed or had no installer recorded.

1Sunrun190727
2OHM SOLAR SOLUTIONS96406
3Alternative Energy Systems, Inc.821,632
4BRIGHT OPS7482
5Royal Aire, Inc.64762
6WEBB BILL CONSTRUCTION INC62134
7BLM HOLDINGS INC45230
8FEATHER RIVER AIRE AND SOLAR35250
9URBAN DESIGN34185
10United Sun Energy26394
11Tesla Energy Operations (formerly SolarCity)24867
12CHICO SOLAR WORKS21155
13Westhaven Inc20192
14B J K CONSTRUCTORS1416
15CALIFORNIA BUILDERS1461
16REVAMP SOLAR ENERGY LLC1277
17ALL AROUND HEATING, AIR AND SOLAR CONSTRUCTION1056
18LINKUS ENTERPRISES LLC1010
19SENGA ENERGY LLC1020
20SonRay Construction Inc.1010
21APEX ELECTRICAL924
22Citadel Roofing and Solar99
23FREEDOM FOREVER LLC8211
24Marks Solar859
25PREMIER SOLAR ENERGY INC8223

Most installs, all time

1Alternative Energy Systems, Inc.1,6321,632
2Tesla Energy Operations (formerly SolarCity)867867
3Royal Aire, Inc.762762
4Vivint Solar Developer, LLC740740
5Sunrun727727
6OHM SOLAR SOLUTIONS406406
7United Sun Energy394394
8Chico Electric368368
9Urban Design Solar305305
10FEATHER RIVER AIRE AND SOLAR250250

Installs by year

YearInstalls interconnectedWith battery storage
20221,36846
20231,73986
2024712288
2025642373
2026 (through Aug 31, 2026)298150

Under the Net Billing Tariff (NEM 3.0)

941 of the 12,800 residential solar installs in Chico (7.4% of the 12,800 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Chico

1Sunrun17016999.4%
2OHM SOLAR SOLUTIONS848095.2%
3BRIGHT OPS817288.9%
4Royal Aire, Inc.585289.7%
5Alternative Energy Systems, Inc.504692.0%
6WEBB BILL CONSTRUCTION INC43818.6%
7Tesla Energy Operations (formerly SolarCity)353291.4%
8FEATHER RIVER AIRE AND SOLAR322990.6%
9PREMIER SOLAR ENERGY INC242395.8%
10URBAN DESIGN232191.3%
11Westhaven Inc2323100.0%
12CHICO SOLAR WORKS191789.5%
13CALIFORNIA BUILDERS161168.8%
14B J K CONSTRUCTORS15960.0%
15FREEDOM FOREVER LLC151493.3%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 1,047 of Chico’s 1,145 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (278, 26.6%) used modules recorded as Qcells.

In the last 24 months, 1,145 of Chico’s 1,145 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (712, 62.2%) used inverters recorded as Enphase.

In the last 24 months, 557 of Chico’s 1,145 installs name a battery maker in the “Generator Manufacturer” fields, and the most common maker (237, 42.5%) used batteries recorded as Tesla.

902 of 1,085 battery-paired PG&E and SCE installs (83.1%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2782,714
LONGi163527
Canadian Solar1311,430
JA Solar118not in top list
Trina Solar60415
Inverter makerEnphase7127,243
Tesla311584
SolarEdge1792,534
SMA29845
SunPower20985
Battery makerTesla237416
Enphase232337
SolarEdge75100
FranklinWH49
LG436

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 11,620 of 12,800 installs, inverters on 12,798. See the methodology and the equipment index.

ZIP codes in Chico

ZIP codes with their own page where the utilities recorded Chico on at least 10% of the ZIP’s installs, through Aug 31, 2026.

959735,5505,579515
959283,7853,786337
959263,4533,453297

SGIP battery storage projects in Chico

The SGIP report lists 189 battery storage projects with the city Chico, 104 with the status Paid ($1,314,789 in current incentive allocations, 3,008 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1043,008$1,314,789
Reserved571$117,218
Pending Reservation573$107,679
Cancelled651,985$1,053,273
RRF Rejected10147$22,638

Installers named on the most SGIP storage projects in Chico

InstallerProjectsPaid
Alternative Energy Systems, Inc.5340
Phoenix Solar Energy199
Infinity Energy, Inc167
Climate and Energy Solutions157
Westhaven Solar149
HAVEN ENERGY SERVICES INC91
Sunrun76
FREEDOM FOREVER LLC63
SWELL SERVICES INC DBA SWELL CONTRACTORS63
Hooked On Solar42

11 of the 189 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
12,800
Last 24 months
1,145
Capacity
93.7 MW DC
Median system size
6.6 kW DC
With battery storage
8.5% all time; 56.1% last 24 months
Third-party owned
13.6% where reported
Ownership types recorded
PPA 1,432, lease 235, prepaid lease 6, other 66
Median battery size
13.5 kWh
Earliest install in data
Jul 27, 2001

Common questions

How many homes in Chico have solar?

12,800 residential solar systems in Chico were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,145 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Chico?

96 installer names have at least one install interconnected in Chico in the last 24 months, and 476 appear in the full record.

How common are batteries with new solar in Chico?

8.5% of the solar installs interconnected in Chico include battery storage across all years, and 56.1% in the last 24 months (642 of 1,145).

How many solar installs in Chico are under NEM 3.0?

941 of the 12,800 residential solar installs in Chico (7.4% of the 12,800 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 82.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.