HAVEN ENERGY SERVICES INC

How many solar installs has HAVEN ENERGY SERVICES INC done in California, and which license number is on its installs?

HAVEN ENERGY SERVICES INC has 496 residential solar installs interconnected in California, active in the records from 2024 through 2026 (Feb 6, 2024 to Aug 31, 2026), most of them in Los Angeles County (115), Riverside County (74) and San Mateo County (61). CSLB lists license 1104018 (HAVEN ENERGY SERVICES INC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires Apr 30, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
496
Last 24 months
476
Total capacity
2,833.5 kW DC
Median system size
5.2 kW DC
With battery storage
100.0% all time; 100.0% last 24 months
Third-party owned
28.2% of 496 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
277 installs, latest Aug 31, 2026
Ownership types recorded
PPA 34, lease 106
Median battery size
15 kWh (330 installs list a capacity)
First install
Feb 6, 2024
Latest install
Aug 31, 2026
Counties
29
Utilities
SCE 323, PGE 173
CSLB license
1104018

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2024 to 2026

YearInstalls interconnectedWith battery storage
20243636
2025126126
2026 (through Aug 31, 2026)334334

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

277 of its 496 interconnected installs (56.0% of the 495 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0102.0%not counted
NEM 2.020842.0%208 (100.0%)
Net Billing Tariff27756.0%277 (100.0%)
Not recorded1

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 140 of HAVEN ENERGY SERVICES INC’s installs the utility recorded a third-party ownership type: PPA 34, lease 106, prepaid lease 0, other 0. Across all installers, 85 residential systems list a third-party owner name that matches HAVEN ENERGY SERVICES INC exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
Haven Energy Services Inc85
Haven Energy54
Haven Energy Services Incc1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 461 of HAVEN ENERGY SERVICES INC’s 476 installs name a module maker in the “Generator Manufacturer” fields, and most of those (289, 62.7%) used modules recorded as Qcells.

In the last 24 months, 476 of HAVEN ENERGY SERVICES INC’s 476 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (323, 67.9%) used inverters recorded as Enphase.

In the last 24 months, 451 of HAVEN ENERGY SERVICES INC’s 476 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (358, 79.4%) used batteries recorded as FranklinWH.

470 of 496 battery-paired PG&E and SCE installs (94.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells289295
SunPower3133
Canadian Solar1718
REC1415
JA Solar13not in top list
Inverter makerEnphase323330
FranklinWH130132
SolarEdge6064
Tesla4143
SunPower2526
Battery makerFranklinWH358366
Tesla90101
Enphase22
LG11

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 480 of 496 installs, inverters on 496. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names HAVEN ENERGY SERVICES INC as developer on 3,320 battery storage projects and as installer on 3,261 (3,252 name it as both), 3,329 projects in all with 54,326 kWh of storage. 731 have the status Paid, with $12,729,101 in current incentive allocations. Applications were received from May 30, 2023 to Nov 15, 2026.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid73111,672$12,729,101
Reserved1,51625,382$38,666,645
Pending Reservation3044,453$7,172,401
Waitlist4546,639$11,660,223
Cancelled3246,181$9,322,422

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Residential Solar and Storage Equity - AB 209 Non-POU1,52422,714$41,680,772224$4,836,607
Residential Solar and Storage Equity - AB 209 POU5868,041$11,669,8785$119,229
Residential Solar and Storage Equity - Ratepayer4496,730$7,886,145209$3,442,560
Residential Solar and Storage Equity - AB 2092844,266$7,390,98663$1,101,461
Residential Storage Equity2695,202$4,512,787148$2,047,140
Equity Resiliency1625,628$5,714,47353$1,074,524
Small Residential Storage43952$138,18027$85,530
Residential Solar and Storage Equity679$87,1200$0
Large-Scale Storage5215$45,4502$22,050
Non-Residential Storage Equity1500$425,0000$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1104018HAVEN ENERGY SERVICES INC (Corporation)CLEARB General Building Contractor; C-10 Electrical ContractorApr 27, 2023Apr 30, 2027496

License numbers are the ones the utilities recorded on the interconnection applications (496 of 496 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1104018. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list HAVEN ENERGY SERVICES INC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense20252026Total
City and County of San Francisco1104018246
unincorporated San Diego County1104018156

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles115
Riverside74
San Mateo61
San Bernardino54
Ventura28
Orange21
Santa Clara20
Tulare19
Alameda15
Contra Costa15
Fresno12
Kern12
Sonoma9
Marin7
Santa Barbara6
Madera4
Merced3
Solano3
Yolo3
Amador2
Kings2
Lake2
Nevada2
Santa Cruz2
Butte1
Mendocino1
Placer1
San Joaquin1
Yuba1

Top cities

CityInstalls
San Jose12
Daly City11
Victorville11
San Mateo9
Monrovia8
Fresno7
Irvine7
La Puente7
San Bernardino7
Santa Clarita7
Winchester7
Fontana6
Lake Elsinore6
Menifee6
Moreno Valley6

Names as recorded by the utilities

The utilities recorded this installer under 1 spelling. See the methodology for how spellings are combined.

Installer name as recordedInstalls
HAVEN ENERGY SERVICES INC496

Common questions

Where does HAVEN ENERGY SERVICES INC install solar?

Its installs are spread across 29 counties. The most are in Los Angeles County (115 installs), followed by Riverside County (74).

How often does HAVEN ENERGY SERVICES INC install batteries with solar?

100.0% of its interconnected solar installs include battery storage across all years, and 100.0% in the last 24 months (476 of 476).

How many HAVEN ENERGY SERVICES INC installs are under NEM 3.0 (the Net Billing Tariff)?

277 of its 496 interconnected installs (56.0% of the 495 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 100.0% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.