Solar installers in Santa Clarita, California

Most installs here are in Los Angeles County.

Who installs the most solar in Santa Clarita?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Santa Clarita are Sunrun (483), GAF Energy (260) and SUNNOVA ENERGY CORPORATION (135). They account for 878 of the 1,556 residential solar installs interconnected there in that window.

In all, 9,251 homes in Santa Clarita have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 128 installers with installs in this window. 13 installs in the window were self-installed or had no installer recorded.

1Sunrun483901
2GAF Energy260261
3SUNNOVA ENERGY CORPORATION135374
4SunPower982,872
5Tesla Energy Operations (formerly SolarCity)97804
6ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING2461
7Complete Solar2239
8FREEDOM FOREVER LLC20151
9Green Convergence20307
10Solar Optimum Inc.18104
11SOLAR TECH ENERGY SYSTEMS INC1819
12TREEPUBLIC SOLAR1825
13A P ELECTRICAL17167
14BRIGHT OPS1515
15HOMELINK CONSTRUCTION LLC DBA HOMELINK SOLAR1314
16CALIFORNIA SOLAR & ELECTRIC INC1213
17SOLAR SHOPPERS CONSTRUCTION1219
18Plug It In Solar1015
19AMECO SOLAR LLC928
20CLEAN POWER GROUP INC89
21FREEDOM FOREVER SOUTHERN CALIFORNIA LLC77
22Paradise Renewables716
23SKY SOLAR PRO78
24SOUTH WEST BUILDERS715
25EXO Energy613

Most installs, all time

1SunPower2,8722,872
2Sunrun901901
3Tesla Energy Operations (formerly SolarCity)804804
4SUNNOVA ENERGY CORPORATION374374
5SunStreet Energy Group LLC331331
6Green Convergence307307
7GAF Energy261261
8Verengo223223
9A P ELECTRICAL167167
10FREEDOM FOREVER LLC151151

Installs by year

YearInstalls interconnectedWith battery storage
2022927146
2023971226
2024745527
2025716665
2026 (through Aug 31, 2026)581561

Under the Net Billing Tariff (NEM 3.0)

1,568 of the 9,251 residential solar installs in Santa Clarita (16.9% of the 9,251 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.3% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Santa Clarita

1Sunrun50649197.0%
2GAF Energy259259100.0%
3SunPower1347455.2%
4Tesla Energy Operations (formerly SolarCity)11310693.8%
5SUNNOVA ENERGY CORPORATION3232100.0%
6FREEDOM FOREVER LLC3131100.0%
7ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING2626100.0%
8Solar Optimum Inc.252184.0%
9A P ELECTRICAL222090.9%
10Green Convergence212095.2%
11Complete Solar2020100.0%
12SOLAR TECH ENERGY SYSTEMS INC1818100.0%
13TREEPUBLIC SOLAR1616100.0%
14BRIGHT OPS151386.7%
15HOMELINK CONSTRUCTION LLC DBA HOMELINK SOLAR1414100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 1,547 of Santa Clarita’s 1,556 installs name a module maker in the “Generator Manufacturer” fields, and most of those (874, 56.5%) used modules recorded as Qcells.

In the last 24 months, 1,556 of Santa Clarita’s 1,556 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (785, 50.4%) used inverters recorded as Tesla.

In the last 24 months, 1,409 of Santa Clarita’s 1,556 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (981, 69.6%) used batteries recorded as Tesla.

2,297 of 2,377 battery-paired PG&E and SCE installs (96.6%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells8741,796
SunPower1972,415
LONGi130326
JA Solar116244
Elin Energy95not in top list
Inverter makerTesla785938
Enphase5362,723
SolarEdge1922,049
SunPower1321,795
ABB41725
Battery makerTesla9811,518
Enphase322505
FranklinWH4854
SolarEdge4159
Lunar Energy99

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 7,258 of 9,251 installs, inverters on 9,248. See the methodology and the equipment index.

ZIP codes in Santa Clarita

ZIP codes with their own page where the utilities recorded Santa Clarita on at least 10% of the ZIP’s installs, through Aug 31, 2026.

913503,2435,637674
913901,9992,173239
913541,6793,850814
913871,4073,390367
913513772,188269
913213001,522209
913552161,878197

SGIP battery storage projects in Santa Clarita

The SGIP report lists 1,233 battery storage projects with the city Santa Clarita, 791 with the status Paid ($14,046,528 in current incentive allocations, 18,334 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid79118,334$14,046,528
PBI in Process1348$121,800
Reserved766,131$3,853,253
Pending Reservation223$70,524
Waitlist12260$326,947
Cancelled35011,136$7,780,752
RRF Rejected113$1,740

Installers named on the most SGIP storage projects in Santa Clarita

InstallerProjectsPaid
LA Solar Group241200
Sunrun15395
Semper Solaris Construction Inc11595
Plug It In Solar10140
PLUG IT IN SYSTEMS INC9633
SunPower7340
Solar Optimum Inc.6044
Green Convergence4232
Tesla3934
SWELL SERVICES INC DBA SWELL CONTRACTORS3121

111 of the 1,233 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
9,251
Last 24 months
1,556
Capacity
57.8 MW DC
Median system size
5.1 kW DC
With battery storage
25.7% all time; 91.8% last 24 months
Third-party owned
39.7% where reported
Ownership types recorded
PPA 2,125, lease 1,033, prepaid lease 4, other 29
Median battery size
13.5 kWh
Earliest install in data
Feb 22, 1999

Common questions

How many homes in Santa Clarita have solar?

9,251 residential solar systems in Santa Clarita were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 1,556 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Santa Clarita?

128 installer names have at least one install interconnected in Santa Clarita in the last 24 months, and 519 appear in the full record.

How common are batteries with new solar in Santa Clarita?

25.7% of the solar installs interconnected in Santa Clarita include battery storage across all years, and 91.8% in the last 24 months (1,428 of 1,556).

How many solar installs in Santa Clarita are under NEM 3.0?

1,568 of the 9,251 residential solar installs in Santa Clarita (16.9% of the 9,251 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.3% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.