Paradise Renewables

How many solar installs has Paradise Renewables done in California, and which license number is on its installs?

Paradise Renewables has 747 residential solar installs interconnected in California, active in the records from 2015 through 2026 (Jun 22, 2015 to Jul 29, 2026), most of them in Los Angeles County (295), Orange County (165) and Ventura County (138). CSLB lists license 986062 (sole owner license, name not shown) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications C-10, expires Aug 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
747
Last 24 months
175
Total capacity
6,193.4 kW DC
Median system size
7.4 kW DC
With battery storage
28.8% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 95.9% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
Third-party owned
9.4% of 747 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
186 installs, latest Jul 29, 2026
Ownership types recorded
PPA 70
Median battery size
10 kWh (191 installs list a capacity)
First install
Jun 22, 2015
Latest install
Jul 29, 2026
Counties
11
Utilities
SCE 662, SDGE 78, PGE 7
CSLB license
986062

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2015 to 2026

YearInstalls interconnectedWith battery storage
201590
2016210
2017320
2018400
2019684
2020836
2021837
20221003
20231182
20244632
202510094
2026 (through Aug 31, 2026)4745

The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

186 of its 747 interconnected installs (24.9% of the 747 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those include battery storage. The latest Net Billing Tariff install was approved Jul 29, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.0445.9%not counted
NEM 2.051769.2%21 (4.8%)
Net Billing Tariff18624.9%172 (92.5%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.

Leases, PPAs and third-party owners

On 70 of Paradise Renewables’s installs the utility recorded a third-party ownership type: PPA 70, lease 0, prepaid lease 0, other 0. No residential system in the file lists a third-party owner name that matches Paradise Renewables exactly.

Third-party owner named on its installsInstalls
Goodleap46
Lightreach20
Palmetto2
Concert Finance1
Palmetto Lightreach1

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 175 of Paradise Renewables’ 175 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (59, 33.7%) used modules recorded as Qcells.

In the last 24 months, 175 of Paradise Renewables’ 175 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (145, 82.9%) used inverters recorded as Enphase.

In the last 24 months, 162 of Paradise Renewables’ 175 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (121, 74.7%) used batteries recorded as Enphase.

189 of 193 battery-paired PG&E and SCE installs (97.9%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells59228
Hyundai5865
Trina Solar20not in top list
LONGi10not in top list
VSUN (Vietnam Sunergy)10not in top list
Inverter makerEnphase145368
Tesla3043
Battery makerEnphase121132
Tesla4142

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 732 of 747 installs, inverters on 747. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names Paradise Renewables as developer on 12 battery storage projects and as installer on 21 (12 name it as both), 21 projects in all with 326 kWh of storage. 14 have the status Paid, with $80,927 in current incentive allocations. Applications were received from May 1, 2017 to Sep 30, 2021.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid14214$80,927
Cancelled7113$43,541

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Small Residential Storage14172$42,97810$29,807
Equity Resiliency463$56,1703$39,520
Large-Scale Storage392$25,3201$11,600

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
986062Sole owner license (name not shown)CLEARC-10 Electrical ContractorAug 14, 2013Aug 31, 2027745

License numbers are the ones the utilities recorded on the interconnection applications (745 of 747 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 986062. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Local solar permits naming its license

Solar permits in city and county open data that list Paradise Renewables’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense2019202020212022Total
unincorporated San Diego County98606221126

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Counties

CountyInstalls
Los Angeles295
Orange165
Ventura138
Riverside55
San Bernardino48
San Diego27
Kern9
Santa Barbara5
Tulare3
Contra Costa1
Marin1

Top cities

CityInstalls
Simi Valley44
Thousand Oaks31
San Clemente26
Palmdale23
Lancaster22
Moorpark22
Santa Clarita16
Yorba Linda14
Newbury Park13
Placentia13
Lakewood12
Corona11
Westlake Village11
Agoura Hills10
Fontana10

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
PARADISE RENEWABLES508
Paradise Renewables239

Common questions

Where does Paradise Renewables install solar?

Its installs are spread across 11 counties. The most are in Los Angeles County (295 installs), followed by Orange County (165).

How often does Paradise Renewables install batteries with solar?

28.8% of its interconnected solar installs include battery storage across all years, and 95.9% in the last 24 months (164 of 171). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.

How many Paradise Renewables installs are under NEM 3.0 (the Net Billing Tariff)?

186 of its 747 interconnected installs (24.9% of the 747 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 92.5% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.