A P ELECTRICAL

How many solar installs has A P ELECTRICAL done in California, and which license number is on its installs?

A P ELECTRICAL has 3,078 residential solar installs interconnected in California, active in the records from 2019 through 2026 (Dec 27, 2019 to Aug 31, 2026), most of them in Los Angeles County (1,143), Ventura County (333) and Orange County (237). CSLB lists license 974115 (A P ELECTRICAL) with status Judgement Susp in the License Master file pulled Nov 4, 2026, classifications C-10, C-39, C-46, expires Jun 30, 2028.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
3,078
Last 24 months
557
Total capacity
25,467.1 kW DC
Median system size
7.6 kW DC
With battery storage
51.0% all time; 87.4% last 24 months
Third-party owned
25.9% of 3,078 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
789 installs, latest Aug 31, 2026
Ownership types recorded
PPA 395, lease 278, prepaid lease 77, other 46
Median battery size
27 kWh (1,293 installs list a capacity)
First install
Dec 27, 2019
Latest install
Aug 31, 2026
Counties
48
Utilities
SCE 2,185, PGE 893
CSLB license
974115

Is A P ELECTRICAL still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (241 in all).

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2019 to 2026

YearInstalls interconnectedWith battery storage
201911
20201716
2021561224
2022770315
2023831294
2024429310
2025338290
2026 (through Aug 31, 2026)131120

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

789 of its 3,078 interconnected installs (25.6% of the 3,078 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.8% of those include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.060.2%not counted
NEM 2.02,28374.2%967 (42.4%)
Net Billing Tariff78925.6%598 (75.8%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

On 796 of A P ELECTRICAL’s installs the utility recorded a third-party ownership type: PPA 395, lease 278, prepaid lease 77, other 46. Across all installers, 89 residential systems list a third-party owner name that matches A P ELECTRICAL exactly (after removing case, punctuation and suffixes such as Inc or LLC).

Third-party owner named on its installsInstalls
LA Solar Group395
LASG240
A P ELECTRICAL89
Ara Petrosyan26
Service Finance26

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 246 of A P ELECTRICAL’s 557 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (36, 14.6%) used modules recorded as Panasonic.

In the last 24 months, 557 of A P ELECTRICAL’s 557 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (272, 48.8%) used inverters recorded as Tesla.

In the last 24 months, 453 of A P ELECTRICAL’s 557 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (414, 91.4%) used batteries recorded as Tesla.

1,435 of 1,570 battery-paired PG&E and SCE installs (91.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerPanasonic36295
Qcells35368
VSUN (Vietnam Sunergy)33not in top list
SunPower19161
LG17145
Inverter makerTesla272521
Enphase1191,030
Hoymiles106607
SolarEdge69752
SMA12not in top list
Battery makerTesla4141,311
Enphase34115
Shenzhen Growatt New Energy Co., Ltd.66

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 1,544 of 3,078 installs, inverters on 3,078. See the methodology and the equipment index.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
974115A P ELECTRICAL (Corporation)Judgement Susp, DISC Bond Filed| Pending Case/CIT| Judgement PendC-10 Electrical Contractor; C-39 Roofing Contractor; C-46 Solar ContractorJun 20, 2012Jun 30, 20283,078

License numbers are the ones the utilities recorded on the interconnection applications (3,078 of 3,078 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

CSLB’s License Master file lists a disciplinary bond on license 974115 (bond reason recorded: Conditional), required Mar 19, 2024, $50,000, CSLB case number 2021000152, bond cancelled Jun 13, 2024. CSLB lists license 974115 under the business name A P ELECTRICAL; the bond is on the license, as CSLB records it. Current CSLB record: 974115.

What a disciplinary bond is: CSLB’s Bond Basics page says that when a license has been revoked, or in some instances suspended, for a violation of the Contractors State License Law, the contractor must file a disciplinary bond with the Registrar to reinstate, reissue or reapply for a license, and that the bond must stay on file for at least two years (CSLB Bond Basics). The file gives one disciplinary bond entry per license and does not say which of those circumstances applied, what the case was about or how it ended. CSLB’s license detail page shows any public disciplinary action.

Local solar permits naming its license

Solar permits in city and county open data that list A P ELECTRICAL’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.

Permit dataLicense201820192020202120222023202420252026Total
City and County of San Francisco97411511020943135065
unincorporated San Diego County9741151061255512147
unincorporated Marin County97411541721000015

Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.

Other names reported under the same license

Counties

CountyInstalls
Los Angeles1,143
Ventura333
Orange237
San Bernardino205
Riverside172
Santa Clara168
Alameda126
Contra Costa106
Kern84
Fresno56
San Mateo53
San Joaquin39
Tulare35
Santa Barbara34
San Francisco27
Sonoma27
San Luis Obispo25
Solano20
El Dorado14
Merced12
Placer12
Mendocino11
Madera10
Marin10
San Benito10
Yuba10
Humboldt9
Monterey9
Lake8
Shasta8
Napa7
Amador6
Colusa6
Santa Cruz6
Sutter6
Butte5
Calaveras5
Yolo5
Kings4
Tehama4
Mariposa2
Plumas2
Tuolumne2
Glenn1
Inyo1
Nevada1
Sacramento1
Stanislaus1

Top cities

CityInstalls
Santa Clarita167
Simi Valley149
San Jose95
Calabasas58
Canyon Country56
Thousand Oaks56
Valencia47
Fremont44
Palmdale44
Fresno42
Lancaster36
Irvine33
La Canada32
Agoura Hills31
Bakersfield31

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
A P ELECTRICAL3,073
A-P-ELECTRICAL5

Common questions

Where does A P ELECTRICAL install solar?

Its installs are spread across 48 counties. The most are in Los Angeles County (1,143 installs), followed by Ventura County (333).

How often does A P ELECTRICAL install batteries with solar?

51.0% of its interconnected solar installs include battery storage across all years, and 87.4% in the last 24 months (487 of 557).

How many A P ELECTRICAL installs are under NEM 3.0 (the Net Billing Tariff)?

789 of its 3,078 interconnected installs (25.6% of the 3,078 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 75.8% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.