Solar installers in Canyon Country, California
Most installs here are in Los Angeles County.
Who installs the most solar in Canyon Country?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Canyon Country are Sunrun (143), Tesla Energy Operations (formerly SolarCity) (38) and BRIGHT OPS (19). They account for 200 of the 446 residential solar installs interconnected there in that window.
In all, 3,846 homes in Canyon Country have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 93 installers with installs in this window. 10 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Sunrun | 526 | 526 |
| 2 | Tesla Energy Operations (formerly SolarCity) | 416 | 416 |
| 3 | Vivint Solar Developer, LLC | 206 | 206 |
| 4 | Verengo | 188 | 188 |
| 5 | Green Convergence | 141 | 141 |
| 6 | SunPower | 138 | 138 |
| 7 | FREEDOM FOREVER LLC | 110 | 110 |
| 8 | Bright Planet Solar | 74 | 74 |
| 9 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 72 | 72 |
| 10 | Horizon Solar Power | 66 | 66 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 492 | 116 |
| 2023 | 551 | 91 |
| 2024 | 222 | 173 |
| 2025 | 262 | 247 |
| 2026 (through Aug 31, 2026) | 120 | 117 |
Under the Net Billing Tariff (NEM 3.0)
532 of the 3,846 residential solar installs in Canyon Country (13.8% of the 3,846 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Canyon Country
| 1 | Sunrun | 167 | 166 | 99.4% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 45 | 40 | 88.9% |
| 3 | FREEDOM FOREVER LLC | 34 | 32 | 94.1% |
| 4 | BRIGHT OPS | 19 | 17 | 89.5% |
| 5 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 16 | 15 | 93.8% |
| 6 | Powur PBC (Powur Home) | 13 | 11 | 84.6% |
| 7 | SunPower | 11 | 9 | 81.8% |
| 8 | A P ELECTRICAL | 10 | 9 | 90.0% |
| 9 | HOMELINK CONSTRUCTION LLC DBA HOMELINK SOLAR | 10 | 10 | 100.0% |
| 10 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 8 | 8 | 100.0% |
| 11 | SOUTH WEST BUILDERS | 8 | 8 | 100.0% |
| 12 | TREEPUBLIC SOLAR | 8 | 7 | 87.5% |
| 13 | AMECO SOLAR LLC | 6 | 5 | 83.3% |
| 14 | Semper Solaris Construction Inc | 6 | 5 | 83.3% |
| 15 | ACE SOLARIS | 5 | 5 | 100.0% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 440 of Canyon Country’s 446 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (152, 34.5%) used modules recorded as Qcells.
In the last 24 months, 446 of Canyon Country’s 446 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (207, 46.4%) used inverters recorded as Tesla.
In the last 24 months, 416 of Canyon Country’s 446 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (300, 72.1%) used batteries recorded as Tesla.
863 of 906 battery-paired PG&E and SCE installs (95.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 152 | 679 |
| JA Solar | 68 | 187 | |
| LONGi | 53 | 257 | |
| REC | 44 | 161 | |
| Elin Energy | 25 | not in top list | |
| Inverter maker | Tesla | 207 | 286 |
| Enphase | 121 | 1,102 | |
| SolarEdge | 102 | 1,260 | |
| Delta Electronics | 16 | not in top list | |
| ABB | 9 | 318 | |
| Battery maker | Tesla | 300 | 539 |
| Enphase | 60 | 109 | |
| SolarEdge | 30 | 42 | |
| FranklinWH | 19 | 22 | |
| LG | 2 | 116 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,968 of 3,846 installs, inverters on 3,844. See the methodology and the equipment index.
ZIP codes in Canyon Country
ZIP codes with their own page where the utilities recorded Canyon Country on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Canyon Country
The SGIP report lists 290 battery storage projects with the city Canyon Country, 162 with the status Paid ($3,159,216 in current incentive allocations, 4,055 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 162 | 4,055 | $3,159,216 |
| Reserved | 16 | 239 | $180,709 |
| Pending Reservation | 3 | 41 | $81,207 |
| Waitlist | 5 | 106 | $152,411 |
| Cancelled | 103 | 2,760 | $2,381,306 |
| RRF Rejected | 1 | 65 | $32,590 |
Installers named on the most SGIP storage projects in Canyon Country
| Installer | Projects | Paid |
|---|---|---|
| LA Solar Group | 42 | 35 |
| PLUG IT IN SYSTEMS INC | 21 | 6 |
| SunPower | 21 | 11 |
| Plug It In Solar | 20 | 4 |
| Semper Solaris Construction Inc | 19 | 14 |
| Green Convergence | 18 | 11 |
| Solar Optimum Inc. | 18 | 10 |
| SWELL SERVICES INC DBA SWELL CONTRACTORS | 13 | 9 |
| Sunrun | 11 | 7 |
| CERVUS INC DBA CERVUS CONSTRUCTION | 7 | 3 |
34 of the 290 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 3,846
- Last 24 months
- 446
- Capacity
- 29.1 MW DC
- Median system size
- 7 kW DC
- With battery storage
- 23.6% all time; 94.6% last 24 months
- Third-party owned
- 43.7% where reported
- Ownership types recorded
- PPA 1,190, lease 343, prepaid lease 2, other 24
- Median battery size
- 13.5 kWh
- Earliest install in data
- Jul 16, 2001
Common questions
How many homes in Canyon Country have solar?
3,846 residential solar systems in Canyon Country were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 446 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Canyon Country?
93 installer names have at least one install interconnected in Canyon Country in the last 24 months, and 469 appear in the full record.
How common are batteries with new solar in Canyon Country?
23.6% of the solar installs interconnected in Canyon Country include battery storage across all years, and 94.6% in the last 24 months (422 of 446).
How many solar installs in Canyon Country are under NEM 3.0?
532 of the 3,846 residential solar installs in Canyon Country (13.8% of the 3,846 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.