Solar installers in Canyon Country, California

Most installs here are in Los Angeles County.

Who installs the most solar in Canyon Country?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Canyon Country are Sunrun (143), Tesla Energy Operations (formerly SolarCity) (38) and BRIGHT OPS (19). They account for 200 of the 446 residential solar installs interconnected there in that window.

In all, 3,846 homes in Canyon Country have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 93 installers with installs in this window. 10 installs in the window were self-installed or had no installer recorded.

1Sunrun143526
2Tesla Energy Operations (formerly SolarCity)38416
3BRIGHT OPS1919
4FREEDOM FOREVER LLC19110
5ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING1372
6A P ELECTRICAL1156
7Powur PBC (Powur Home)1128
8FREEDOM FOREVER SOUTHERN CALIFORNIA LLC88
9HOMELINK CONSTRUCTION LLC DBA HOMELINK SOLAR810
10TREEPUBLIC SOLAR813
11SOUTH WEST BUILDERS714
12AMECO SOLAR LLC612
13BETTER EARTH ELECTRIC INC636
14ACE SOLARIS55
15AXIA SOLAR CORP55
16Semper Solaris Construction Inc564
17SKY SOLAR PRO55
18SKYLINE SMART ENERGY518
19V3 Electric58
20CALIFORNIA SOLAR & ELECTRIC INC46
21CERVUS INC DBA CERVUS CONSTRUCTION411
22Solar Optimum Inc.456
23CLEAN POWER GROUP INC34
24EXO Energy35
25Green Convergence3141

Most installs, all time

1Sunrun526526
2Tesla Energy Operations (formerly SolarCity)416416
3Vivint Solar Developer, LLC206206
4Verengo188188
5Green Convergence141141
6SunPower138138
7FREEDOM FOREVER LLC110110
8Bright Planet Solar7474
9ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING7272
10Horizon Solar Power6666

Installs by year

YearInstalls interconnectedWith battery storage
2022492116
202355191
2024222173
2025262247
2026 (through Aug 31, 2026)120117

Under the Net Billing Tariff (NEM 3.0)

532 of the 3,846 residential solar installs in Canyon Country (13.8% of the 3,846 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The latest was approved Aug 28, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Canyon Country

1Sunrun16716699.4%
2Tesla Energy Operations (formerly SolarCity)454088.9%
3FREEDOM FOREVER LLC343294.1%
4BRIGHT OPS191789.5%
5ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING161593.8%
6Powur PBC (Powur Home)131184.6%
7SunPower11981.8%
8A P ELECTRICAL10990.0%
9HOMELINK CONSTRUCTION LLC DBA HOMELINK SOLAR1010100.0%
10FREEDOM FOREVER SOUTHERN CALIFORNIA LLC88100.0%
11SOUTH WEST BUILDERS88100.0%
12TREEPUBLIC SOLAR8787.5%
13AMECO SOLAR LLC6583.3%
14Semper Solaris Construction Inc6583.3%
15ACE SOLARIS55100.0%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 440 of Canyon Country’s 446 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (152, 34.5%) used modules recorded as Qcells.

In the last 24 months, 446 of Canyon Country’s 446 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (207, 46.4%) used inverters recorded as Tesla.

In the last 24 months, 416 of Canyon Country’s 446 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (300, 72.1%) used batteries recorded as Tesla.

863 of 906 battery-paired PG&E and SCE installs (95.3%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells152679
JA Solar68187
LONGi53257
REC44161
Elin Energy25not in top list
Inverter makerTesla207286
Enphase1211,102
SolarEdge1021,260
Delta Electronics16not in top list
ABB9318
Battery makerTesla300539
Enphase60109
SolarEdge3042
FranklinWH1922
LG2116

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,968 of 3,846 installs, inverters on 3,844. See the methodology and the equipment index.

ZIP codes in Canyon Country

ZIP codes with their own page where the utilities recorded Canyon Country on at least 10% of the ZIP’s installs, through Aug 31, 2026.

913871,9803,390367
913511,8112,188269

SGIP battery storage projects in Canyon Country

The SGIP report lists 290 battery storage projects with the city Canyon Country, 162 with the status Paid ($3,159,216 in current incentive allocations, 4,055 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid1624,055$3,159,216
Reserved16239$180,709
Pending Reservation341$81,207
Waitlist5106$152,411
Cancelled1032,760$2,381,306
RRF Rejected165$32,590

Installers named on the most SGIP storage projects in Canyon Country

InstallerProjectsPaid
LA Solar Group4235
PLUG IT IN SYSTEMS INC216
SunPower2111
Plug It In Solar204
Semper Solaris Construction Inc1914
Green Convergence1811
Solar Optimum Inc.1810
SWELL SERVICES INC DBA SWELL CONTRACTORS139
Sunrun117
CERVUS INC DBA CERVUS CONSTRUCTION73

34 of the 290 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
3,846
Last 24 months
446
Capacity
29.1 MW DC
Median system size
7 kW DC
With battery storage
23.6% all time; 94.6% last 24 months
Third-party owned
43.7% where reported
Ownership types recorded
PPA 1,190, lease 343, prepaid lease 2, other 24
Median battery size
13.5 kWh
Earliest install in data
Jul 16, 2001

Common questions

How many homes in Canyon Country have solar?

3,846 residential solar systems in Canyon Country were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 446 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Canyon Country?

93 installer names have at least one install interconnected in Canyon Country in the last 24 months, and 469 appear in the full record.

How common are batteries with new solar in Canyon Country?

23.6% of the solar installs interconnected in Canyon Country include battery storage across all years, and 94.6% in the last 24 months (422 of 446).

How many solar installs in Canyon Country are under NEM 3.0?

532 of the 3,846 residential solar installs in Canyon Country (13.8% of the 3,846 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 90.4% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.