CERVUS INC DBA CERVUS CONSTRUCTION

How many solar installs has CERVUS INC DBA CERVUS CONSTRUCTION done in California, and which license number is on its installs?

CERVUS INC DBA CERVUS CONSTRUCTION has 56 residential solar installs interconnected in California, active in the records from 2020 through 2026 (Jul 29, 2020 to Jul 7, 2026), most of them in Los Angeles County (49), Ventura County (4) and Orange County (2). CSLB lists license 1061704 (CERVUS CONSTRUCTION) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, expires Dec 31, 2027.

License status changes daily. Confirm it on CSLB’s own license check before relying on it.

Interconnected installs
56
Last 24 months
24
Total capacity
472.7 kW DC
Median system size
7.6 kW DC
With battery storage
30.4% all time; 70.8% last 24 months
Third-party owned
0.0% of 56 installs where ownership was reported
Net Billing Tariff (NEM 3.0)
21 installs, latest Jul 7, 2026
Ownership types recorded
none recorded
Median battery size
24.9 kWh (17 installs list a capacity)
First install
Jul 29, 2020
Latest install
Jul 7, 2026
Counties
4
Utilities
SCE 56
CSLB license
1061704

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installs by year, 2020 to 2026

YearInstalls interconnectedWith battery storage
202020
202120
202280
2023170
202441
20251210
2026 (through Aug 31, 2026)116

Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)

21 of its 56 interconnected installs (37.5% of the 56 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 61.9% of those include battery storage. The latest Net Billing Tariff install was approved Jul 7, 2026.

Tariff recorded by the utilityInstallsShare of installs with a tariffWith battery storage
NEM 1.000.0%not counted
NEM 2.03562.5%4 (11.4%)
Net Billing Tariff2137.5%13 (61.9%)

The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves.

Leases, PPAs and third-party owners

The utilities recorded no third-party ownership type (PPA or lease) on CERVUS INC DBA CERVUS CONSTRUCTION’s installs. No residential system in the file lists a third-party owner name that matches CERVUS INC DBA CERVUS CONSTRUCTION exactly.

Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.

Equipment recorded

In the last 24 months, 24 of CERVUS INC DBA CERVUS CONSTRUCTION’s 24 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (6, 25.0%) used modules recorded as Silfab.

In the last 24 months, 24 of CERVUS INC DBA CERVUS CONSTRUCTION’s 24 installs name an inverter maker in the “Inverter Manufacturer” fields, and the most common maker (11, 45.8%) used inverters recorded as Enphase.

In the last 24 months, 15 of CERVUS INC DBA CERVUS CONSTRUCTION’s 24 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (9, 60.0%) used batteries recorded as Tesla.

15 of 17 battery-paired PG&E and SCE installs (88.2%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerSilfab68
Hyundai44
Canadian Solar39
Qcells318
REC36
Inverter makerEnphase1126
APsystems (Altenergy Power System)66
SolarEdge416
SMA2not in top list
Delta Electronics13
Battery makerTesla99
FranklinWH33
NeoVolta Inc.33

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 55 of 56 installs, inverters on 56. See the methodology and the equipment index.

SGIP battery storage projects

The SGIP report names CERVUS INC DBA CERVUS CONSTRUCTION as developer on 0 battery storage projects and as installer on 70 (0 name it as both), 70 projects in all with 2,109 kWh of storage. 15 have the status Paid, with $431,239 in current incentive allocations. Applications were received from Jul 17, 2021 to Nov 3, 2025.

By status

Status as publishedProjectsStorage kWhCurrent incentive
Paid15458$431,239
Reserved31916$895,364
Pending Reservation372$143,969
Cancelled21663$656,572

By budget category

Budget categoryProjectsStorage kWhCurrent incentivePaid projectsPaid: current incentive
Equity Resiliency672,045$2,013,50715$431,239
Residential Solar and Storage Equity - AB 209 Non-POU113$87,5690$0
Residential Storage Equity126$22,4400$0
Small Residential Storage124$3,6280$0

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.

Contractor license

LicenseCSLB business nameCSLB status, file pulled Nov 4, 2026ClassificationsIssuedExpiresInstalls reported
1061704CERVUS CONSTRUCTION (Corporation)CLEARB General Building ContractorDec 24, 2019Dec 31, 202756

License numbers are the ones the utilities recorded on the interconnection applications (56 of 56 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. Check the current record at CSLB.

Disciplinary bonds and pending actions in the License Master file

The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1061704. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.

Counties

CountyInstalls
Los Angeles49
Ventura4
Orange2
Kern1

Top cities

CityInstalls
Canyon Country11
Santa Clarita10
Palmdale5
Valencia4
Calabasas2
Commerce2
Newbury Park2
Simi Valley2
Stevenson Ranch2
Whittier2
Canoga Park1
Compton1
La Palma1
La Puente1
Lancaster1

Names as recorded by the utilities

The utilities recorded this installer under 2 spellings. See the methodology for how spellings are combined.

Installer name as recordedInstalls
CERVUS INC DBA CERVUS CONSTRUCTION53
CERVUS INC3

Common questions

Where does CERVUS INC DBA CERVUS CONSTRUCTION install solar?

Its installs are spread across 4 counties. The most are in Los Angeles County (49 installs), followed by Ventura County (4).

How often does CERVUS INC DBA CERVUS CONSTRUCTION install batteries with solar?

30.4% of its interconnected solar installs include battery storage across all years, and 70.8% in the last 24 months (17 of 24).

How many CERVUS INC DBA CERVUS CONSTRUCTION installs are under NEM 3.0 (the Net Billing Tariff)?

21 of its 56 interconnected installs (37.5% of the 56 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 61.9% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.