AMECO SOLAR LLC
How many solar installs has AMECO SOLAR LLC done in California, and which license number is on its installs?
AMECO SOLAR LLC has 2,680 residential solar installs interconnected in California, active in the records from 2007 through 2026 (May 23, 2007 to Aug 31, 2026), most of them in Los Angeles County (1,278), Orange County (511) and Ventura County (168). CSLB lists license 1053172 (AMECO SOLAR LLC) with status CLEAR in the License Master file pulled Nov 4, 2026, classifications B, C-10, expires May 31, 2027.
License status changes daily. Confirm it on CSLB’s own license check before relying on it.
The installs credited to AMECO SOLAR LLC here carry more than one CSLB license number: 1053172 on 2,198 (CSLB holder AMECO SOLAR LLC, Valley Village) and 483280 on 476 (not found in the CSLB License Master file), in the License Master file pulled Nov 4, 2026. They are grouped under one installer by the name written on the applications; the records do not say whether these numbers belong to the same legal entity.
- Interconnected installs
- 2,680
- Last 24 months
- 828
- Total capacity
- 20,573.4 kW DC
- Median system size
- 7.2 kW DC
- With battery storage
- 36.1% of PG&E and SCE installs (SDG&E does not record storage on the solar record) all time; 92.3% of PG&E and SCE installs (SDG&E does not record storage on the solar record) last 24 months
- Third-party owned
- 1.6% of 2,639 installs where ownership was reported
- Net Billing Tariff (NEM 3.0)
- 905 installs, latest Aug 31, 2026
- Ownership types recorded
- PPA 12, lease 23, other 7
- Median battery size
- 13.5 kWh (766 installs list a capacity)
- First install
- May 23, 2007
- Latest install
- Aug 31, 2026
- Counties
- 29
- Utilities
- SCE 2,249, PGE 364, SDGE 67
- CSLB license
- 1053172, 483280
Is AMECO SOLAR LLC still installing solar in California? Its latest install and its count in each month from September 2025 through August 2026 (517 in all).
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installs by year, 2007 to 2026
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2007 | 15 | 0 |
| 2008 | 26 | 0 |
| 2009 | 47 | 0 |
| 2010 | 33 | 0 |
| 2011 | 30 | 0 |
| 2012 | 43 | 0 |
| 2013 | 53 | 0 |
| 2014 | 44 | 0 |
| 2015 | 56 | 0 |
| 2016 | 47 | 0 |
| 2017 | 43 | 0 |
| 2018 | 26 | 0 |
| 2019 | 42 | 0 |
| 2020 | 53 | 0 |
| 2021 | 155 | 0 |
| 2022 | 398 | 27 |
| 2023 | 571 | 68 |
| 2024 | 243 | 180 |
| 2025 | 397 | 353 |
| 2026 (through Aug 31, 2026) | 358 | 315 |
The battery column counts PG&E and SCE records only. SDG&E files a battery as its own project record, so its solar records never show storage.
Net metering tariff: NEM 1.0, NEM 2.0 and the Net Billing Tariff (NEM 3.0)
905 of its 2,680 interconnected installs (33.8% of the 2,680 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.9% of those on PG&E and SCE records include battery storage. The latest Net Billing Tariff install was approved Aug 31, 2026.
| Tariff recorded by the utility | Installs | Share of installs with a tariff | With battery storage |
|---|---|---|---|
| NEM 1.0 | 423 | 15.8% | not counted |
| NEM 2.0 | 1,352 | 50.4% | 146 (11.0%) |
| Net Billing Tariff | 905 | 33.8% | 793 (91.9%) |
The tariff is the NEM Tariff field on each DG Stats record. The CPUC’s Decision D.22-12-056 set the Net Billing Tariff for customers who submit an interconnection application on or after April 15, 2023 (CPUC), so installs approved before mid 2023 are almost all NEM 1.0 or NEM 2.0. A count of tariffs is not a measure of what a system saves. Battery shares use PG&E and SCE installs only: SDG&E files a battery as its own project record, not on the solar record, so its solar records never show storage.
Leases, PPAs and third-party owners
On 42 of AMECO SOLAR LLC’s installs the utility recorded a third-party ownership type: PPA 12, lease 23, prepaid lease 0, other 7. Across all installers, 2 residential systems list a third-party owner name that matches AMECO SOLAR LLC exactly (after removing case, punctuation and suffixes such as Inc or LLC).
| Third-party owner named on its installs | Installs |
|---|---|
| SunPower SolarProgram I, LLC | 10 |
| SunPower Capital, LLC | 9 |
| AMECO | 4 |
| Concert Finance | 3 |
| SunPower Solar Program I, LLC | 3 |
Owner names are written as the utilities recorded them, matched only on exact spelling after that clean-up, so one company can appear under more than one name. The record shows who was named as owner when the system was connected; it does not show later sales of a contract or a portfolio.
Equipment recorded
In the last 24 months, 819 of AMECO SOLAR LLC’s 828 installs name a module maker in the “Generator Manufacturer” fields, and most of those (449, 54.8%) used modules recorded as REC.
In the last 24 months, 828 of AMECO SOLAR LLC’s 828 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (445, 53.7%) used inverters recorded as Enphase.
In the last 24 months, 677 of AMECO SOLAR LLC’s 828 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (354, 52.3%) used batteries recorded as Tesla.
875 of 943 battery-paired PG&E and SCE installs (92.8%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | REC | 449 | 1,165 |
| Hyundai | 230 | 280 | |
| SEG Solar | 65 | 250 | |
| Qcells | 26 | 160 | |
| Tesla | 26 | not in top list | |
| Inverter maker | Enphase | 445 | 1,130 |
| Tesla | 377 | 441 | |
| SolarEdge | 20 | 653 | |
| SunPower | 13 | 298 | |
| SMA | 7 | 119 | |
| Battery maker | Tesla | 354 | 368 |
| Enphase | 306 | 467 | |
| FranklinWH | 16 | 16 | |
| SolarEdge | 1 | 1 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 2,279 of 2,680 installs, inverters on 2,679. See the methodology and the equipment index.
SGIP battery storage projects
The SGIP report names AMECO SOLAR LLC as developer on 136 battery storage projects and as installer on 137 (135 name it as both), 138 projects in all with 2,304 kWh of storage. 57 have the status Paid, with $334,091 in current incentive allocations. Applications were received from Jul 19, 2021 to Jan 2, 2026.
By status
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 57 | 860 | $334,091 |
| Reserved | 7 | 119 | $108,597 |
| Pending Reservation | 2 | 40 | $64,018 |
| Cancelled | 56 | 1,054 | $483,425 |
| RRF Rejected | 16 | 232 | $34,963 |
By budget category
| Budget category | Projects | Storage kWh | Current incentive | Paid projects | Paid: current incentive |
|---|---|---|---|---|---|
| Small Residential Storage | 71 | 927 | $138,564 | 39 | $74,287 |
| Equity Resiliency | 35 | 776 | $691,890 | 15 | $242,410 |
| Large-Scale Storage | 13 | 330 | $86,227 | 2 | $7,139 |
| Residential Solar and Storage Equity - AB 209 Non-POU | 3 | 40 | $73,449 | 1 | $10,255 |
| Not stated | 16 | 232 | $34,963 | 0 | $0 |
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
A project counts here when its Developer Company Name or Installer Name, normalized the same way as the utilities’ installer names, equals this installer’s name or one of the spellings combined on this page. The SGIP report has no license number, so no license join is made. See all SGIP battery projects and the methodology.
Contractor license
| License | CSLB business name | CSLB status, file pulled Nov 4, 2026 | Classifications | Issued | Expires | Installs reported |
|---|---|---|---|---|---|---|
| 1053172 | AMECO SOLAR LLC (Limited Liability) | CLEAR | B General Building Contractor; C-10 Electrical Contractor | May 6, 2019 | May 31, 2027 | 2,198 |
| 483280 | Not found in the CSLB License Master file pulled Nov 4, 2026 | 476 | ||||
License numbers are the ones the utilities recorded on the interconnection applications (2,675 of 2,680 installs carry one). Numbers seen on fewer than 1% of an installer’s installs are treated as typos and not looked up. CSLB’s License Master lists active licenses and expired licenses that can still be renewed; cancelled and revoked licenses, and licenses expired more than five years, are not in it. The file was searched by license number only. That is not a finding about the contractor beyond that search: the file leaves out cancelled, revoked and long-expired licenses, and a number in the utilities’ data can be mistyped. Check the current record at CSLB.
Disciplinary bonds and pending actions in the License Master file
The CSLB License Master file pulled Nov 4, 2026 lists no disciplinary bond, pending suspension date or pending classification removal date for license 1053172. The file does not list citations, accusations or complaints, which appear only on CSLB’s license detail page.
Local solar permits naming its license
Solar permits in city and county open data that list AMECO SOLAR LLC’s primary license number, the one the utilities recorded on the most of its installs. Matched by CSLB license number only, never by name. A license can be shared by several names in this index, so the count is for the license, not only this name. A permit is not an install: one home can have more than one permit, and a permit does not show the system was finished or connected.
| Permit data | License | 2022 | 2023 | 2025 | 2026 | Total |
|---|---|---|---|---|---|---|
| City and County of San Francisco | 1053172 | 0 | 1 | 0 | 0 | 1 |
| unincorporated San Diego County | 1053172 | 1 | 0 | 5 | 3 | 9 |
Of the permit portals this index reads, only these publish the contractor’s license number: City and County of San Francisco, unincorporated San Diego County and unincorporated Marin County. Permits elsewhere are not linked to installers. Checked Nov 16, 2026.
Counties
| County | Installs |
|---|---|
| Los Angeles | 1,278 |
| Orange | 511 |
| Ventura | 168 |
| San Bernardino | 156 |
| Santa Clara | 135 |
| Riverside | 119 |
| Alameda | 92 |
| San Mateo | 66 |
| San Diego | 52 |
| Santa Barbara | 22 |
| Contra Costa | 21 |
| Solano | 11 |
| Kern | 10 |
| Santa Cruz | 9 |
| San Joaquin | 6 |
| Yolo | 4 |
| Kings | 3 |
| Napa | 3 |
| Fresno | 2 |
| San Francisco | 2 |
| Tulare | 2 |
| Lake | 1 |
| Madera | 1 |
| Marin | 1 |
| Merced | 1 |
| Monterey | 1 |
| Sacramento | 1 |
| San Benito | 1 |
| San Luis Obispo | 1 |
Top cities
| City | Installs |
|---|---|
| Long Beach | 240 |
| Rancho Palos Verdes | 68 |
| San Jose | 63 |
| Torrance | 61 |
| Los Alamitos | 57 |
| Huntington Beach | 49 |
| Redondo Beach | 46 |
| Fullerton | 39 |
| Simi Valley | 38 |
| Whittier | 38 |
| Lakewood | 32 |
| Orange | 31 |
| Irvine | 29 |
| Santa Clarita | 28 |
| Downey | 27 |
Names as recorded by the utilities
The utilities recorded this installer under 12 spellings. See the methodology for how spellings are combined.
| Installer name as recorded | Installs |
|---|---|
| AMECO SOLAR LLC | 2,135 |
| AMECO SOLAR INC | 196 |
| AMECO SOLAR INC. | 152 |
| AMECO Solar Inc | 68 |
| Ameco Solar | 44 |
| AMECO Solar | 34 |
| Ameco Solar LLC | 22 |
| AMECO Solar, Inc. | 13 |
| AMECO Solar Inc. | 12 |
| Ameco Solar Inc | 2 |
| AMECO SOLAR | 1 |
| ameco solar, inc | 1 |
Common questions
Where does AMECO SOLAR LLC install solar?
Its installs are spread across 29 counties. The most are in Los Angeles County (1,278 installs), followed by Orange County (511).
How often does AMECO SOLAR LLC install batteries with solar?
36.1% of its interconnected solar installs include battery storage across all years, and 92.3% in the last 24 months (728 of 789). Shares use PG&E and SCE installs only, because SDG&E files batteries as separate project records.
How many AMECO SOLAR LLC installs are under NEM 3.0 (the Net Billing Tariff)?
905 of its 2,680 interconnected installs (33.8% of the 2,680 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 91.9% of those on PG&E and SCE records include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Install counts are the utilities’ interconnection records as published by California DG Stats, current through Aug 31, 2026. License facts are copied from CSLB’s License Master file pulled Nov 4, 2026. A status such as a bond or insurance suspension is CSLB’s record at that time, not a finding by this site, and statuses change daily. Confirm any license directly with CSLB. Report an error or add a company response.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
- Self-Generation Incentive Program (SGIP) program administrators: Real-Time Public Report of SGIP applications (selfgenca.com)
Records last pulled Nov 16, 2026. Every entry links to the original public record.