Solar installers in Orange, California
Most installs here are in Orange County.
Who installs the most solar in Orange?
Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Orange are Sunrun (217), Tesla Energy Operations (formerly SolarCity) (60) and ORANGE COUNTY CONTRACTING SERVICES (43). They account for 320 of the 769 residential solar installs interconnected there in that window.
In all, 6,199 homes in Orange have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.
Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.
Installers ranked by interconnected installs, last 24 months
Sep 2024 through Aug 2026. Top 25 of 143 installers with installs in this window. 27 installs in the window were self-installed or had no installer recorded.
Most installs, all time
| 1 | Tesla Energy Operations (formerly SolarCity) | 775 | 775 |
| 2 | Sunrun | 683 | 683 |
| 3 | Vivint Solar Developer, LLC | 303 | 303 |
| 4 | SunPower | 242 | 242 |
| 5 | Verengo | 147 | 147 |
| 6 | FREEDOM FOREVER LLC | 123 | 123 |
| 7 | ORANGE COUNTY CONTRACTING SERVICES | 115 | 115 |
| 8 | SolarMax Renewable Energy Provider, Inc | 97 | 97 |
| 9 | Semper Solaris Construction Inc | 94 | 94 |
| 10 | PetersenDean | 91 | 91 |
Installs by year
| Year | Installs interconnected | With battery storage |
|---|---|---|
| 2022 | 732 | 122 |
| 2023 | 877 | 134 |
| 2024 | 387 | 253 |
| 2025 | 373 | 316 |
| 2026 (through Aug 31, 2026) | 284 | 265 |
Under the Net Billing Tariff (NEM 3.0)
888 of the 6,199 residential solar installs in Orange (14.3% of the 6,199 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.
Installers ranked by Net Billing Tariff installs in Orange
| 1 | Sunrun | 248 | 246 | 99.2% |
| 2 | Tesla Energy Operations (formerly SolarCity) | 61 | 58 | 95.1% |
| 3 | ORANGE COUNTY CONTRACTING SERVICES | 43 | 43 | 100.0% |
| 4 | FREEDOM FOREVER LLC | 39 | 37 | 94.9% |
| 5 | INFINITY SOLAR | 35 | 32 | 91.4% |
| 6 | BRIGHT OPS | 31 | 26 | 83.9% |
| 7 | ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING | 26 | 25 | 96.2% |
| 8 | SunPower | 13 | 12 | 92.3% |
| 9 | Solar Optimum Inc. | 11 | 10 | 90.9% |
| 10 | AXIA SOLAR CORP | 10 | 10 | 100.0% |
| 11 | Semper Solaris Construction Inc | 10 | 9 | 90.0% |
| 12 | SWSS ELECTRICAL | 10 | 7 | 70.0% |
| 13 | V3 Electric | 9 | 9 | 100.0% |
| 14 | FREEDOM FOREVER SOUTHERN CALIFORNIA LLC | 8 | 6 | 75.0% |
| 15 | LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC | 8 | 7 | 87.5% |
Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.
Equipment recorded
In the last 24 months, 761 of Orange’s 769 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (239, 31.4%) used modules recorded as Qcells.
In the last 24 months, 769 of Orange’s 769 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (421, 54.7%) used inverters recorded as Tesla.
In the last 24 months, 659 of Orange’s 769 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (489, 74.2%) used batteries recorded as Tesla.
1,201 of 1,259 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.
| Equipment | Maker as recorded | Installs, last 24 months | Installs, all years |
|---|---|---|---|
| Module maker | Qcells | 239 | 1,035 |
| LONGi | 103 | 285 | |
| JA Solar | 83 | 208 | |
| Silfab | 81 | not in top list | |
| REC | 61 | 365 | |
| Inverter maker | Tesla | 421 | 537 |
| Enphase | 214 | 2,109 | |
| SolarEdge | 131 | 1,850 | |
| Delta Electronics | 13 | 137 | |
| Qcells | 11 | not in top list | |
| Battery maker | Tesla | 489 | 732 |
| Enphase | 95 | 184 | |
| SolarEdge | 39 | 47 | |
| FranklinWH | 19 | 23 | |
| LG | 8 | 163 |
Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,889 of 6,199 installs, inverters on 6,197. See the methodology and the equipment index.
ZIP codes in Orange
ZIP codes with their own page where the utilities recorded Orange on at least 10% of the ZIP’s installs, through Aug 31, 2026.
SGIP battery storage projects in Orange
The SGIP report lists 335 battery storage projects with the city Orange, 202 with the status Paid ($4,312,446 in current incentive allocations, 9,688 kWh).
| Status as published | Projects | Storage kWh | Current incentive |
|---|---|---|---|
| Paid | 202 | 9,688 | $4,312,446 |
| PBI in Process | 3 | 754 | $232,447 |
| Reserved | 17 | 369 | $360,555 |
| Pending Reservation | 4 | 83 | $62,742 |
| Waitlist | 3 | 53 | $90,161 |
| Cancelled | 101 | 8,929 | $4,573,728 |
| RRF Rejected | 5 | 647 | $292,863 |
Installers named on the most SGIP storage projects in Orange
| Installer | Projects | Paid |
|---|---|---|
| Sunrun | 53 | 35 |
| Semper Solaris Construction Inc | 37 | 26 |
| SunPower | 24 | 15 |
| TLP Electric Integrations, Inc. | 17 | 10 |
| LA Solar Group | 13 | 9 |
| ORANGE COUNTY CONTRACTING SERVICES | 13 | 6 |
| Solar Optimum Inc. | 12 | 8 |
| SolarMax Renewable Energy Provider, Inc | 12 | 6 |
| Orange County Solar | 10 | 5 |
| PetersenDean | 10 | 8 |
47 of the 335 projects name no installer with a page in this index, so they are counted above but not in this list.
Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.
All SGIP battery projects, and SGIP battery incentive money by county.
At a glance
- Residential solar installs
- 6,199
- Last 24 months
- 769
- Capacity
- 47.2 MW DC
- Median system size
- 7 kW DC
- With battery storage
- 20.3% all time; 87.9% last 24 months
- Third-party owned
- 33.7% where reported
- Ownership types recorded
- PPA 1,428, lease 391, prepaid lease 3, other 81
- Median battery size
- 13.5 kWh
- Earliest install in data
- Mar 13, 2001
Common questions
How many homes in Orange have solar?
6,199 residential solar systems in Orange were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 769 of them in the last 24 months. Homes on municipal utilities are not included.
How many solar installers work in Orange?
143 installer names have at least one install interconnected in Orange in the last 24 months, and 703 appear in the full record.
How common are batteries with new solar in Orange?
20.3% of the solar installs interconnected in Orange include battery storage across all years, and 87.9% in the last 24 months (676 of 769).
How many solar installs in Orange are under NEM 3.0?
888 of the 6,199 residential solar installs in Orange (14.3% of the 6,199 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.
Sources
- California Distributed Generation Statistics: Interconnected Project Sites Data Set (PG&E, SCE, SDG&E)
- Contractors State License Board: Master List of California Licensed Contractors
- California Public Utilities Commission: NEM Revisit proceeding R.20-08-020 and Decision D.22-12-056
Records last pulled Nov 16, 2026. Every entry links to the original public record.