Solar installers in Orange, California

Most installs here are in Orange County.

Who installs the most solar in Orange?

Ranked by interconnected installs in the last 24 months (Sep 2024 through Aug 2026), the top three installers in Orange are Sunrun (217), Tesla Energy Operations (formerly SolarCity) (60) and ORANGE COUNTY CONTRACTING SERVICES (43). They account for 320 of the 769 residential solar installs interconnected there in that window.

In all, 6,199 homes in Orange have residential solar interconnected by PG&E, SCE or SDG&E through Aug 31, 2026. These are counts of connected systems, not a rating of any installer.

Counts cover homes served by Pacific Gas and Electric, Southern California Edison and San Diego Gas & Electric, the three utilities that report to California DG Stats. Homes served by municipal utilities such as LADWP (City of Los Angeles) and SMUD (Sacramento) are not in this data. See the methodology.

Installers ranked by interconnected installs, last 24 months

Sep 2024 through Aug 2026. Top 25 of 143 installers with installs in this window. 27 installs in the window were self-installed or had no installer recorded.

1Sunrun217683
2Tesla Energy Operations (formerly SolarCity)60775
3ORANGE COUNTY CONTRACTING SERVICES43115
4FREEDOM FOREVER LLC32123
5INFINITY SOLAR2879
6BRIGHT OPS2631
7ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING2064
8AXIA SOLAR CORP1010
9Solar Optimum Inc.1046
10Semper Solaris Construction Inc994
11SOLAR TECH ENERGY SYSTEMS INC922
12FREEDOM FOREVER SOUTHERN CALIFORNIA LLC88
13Peak Power Solutions843
14V3 Electric811
15AMECO SOLAR LLC731
16LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC710
17Powur PBC (Powur Home)725
18CE ENERGY SERVICES INC66
19Renewable Energy Advantage620
20SolarMax Renewable Energy Provider, Inc697
21SWSS ELECTRICAL627
22BETTER EARTH ELECTRIC INC564
23ECOSOLAR USA ELECTRICAL LLC514
24ILUM ENERGY SOLUTIONS55
25NRG Clean Power517

Most installs, all time

1Tesla Energy Operations (formerly SolarCity)775775
2Sunrun683683
3Vivint Solar Developer, LLC303303
4SunPower242242
5Verengo147147
6FREEDOM FOREVER LLC123123
7ORANGE COUNTY CONTRACTING SERVICES115115
8SolarMax Renewable Energy Provider, Inc9797
9Semper Solaris Construction Inc9494
10PetersenDean9191

Installs by year

YearInstalls interconnectedWith battery storage
2022732122
2023877134
2024387253
2025373316
2026 (through Aug 31, 2026)284265

Under the Net Billing Tariff (NEM 3.0)

888 of the 6,199 residential solar installs in Orange (14.3% of the 6,199 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The latest was approved Aug 31, 2026. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023, under CPUC Decision D.22-12-056.

Installers ranked by Net Billing Tariff installs in Orange

1Sunrun24824699.2%
2Tesla Energy Operations (formerly SolarCity)615895.1%
3ORANGE COUNTY CONTRACTING SERVICES4343100.0%
4FREEDOM FOREVER LLC393794.9%
5INFINITY SOLAR353291.4%
6BRIGHT OPS312683.9%
7ENERGY SERVICE PARTNERS INC DBA ESP CONTRACTING262596.2%
8SunPower131292.3%
9Solar Optimum Inc.111090.9%
10AXIA SOLAR CORP1010100.0%
11Semper Solaris Construction Inc10990.0%
12SWSS ELECTRICAL10770.0%
13V3 Electric99100.0%
14FREEDOM FOREVER SOUTHERN CALIFORNIA LLC8675.0%
15LGCY INSTALLATION SERVICES LLC DBA LGCY ELECTRIC8787.5%

Top 15, all Net Billing Tariff installs through Aug 31, 2026. Counts of connected systems, not a rating.

Equipment recorded

In the last 24 months, 761 of Orange’s 769 installs name a module maker in the “Generator Manufacturer” fields, and the most common maker (239, 31.4%) used modules recorded as Qcells.

In the last 24 months, 769 of Orange’s 769 installs name an inverter maker in the “Inverter Manufacturer” fields, and most of those (421, 54.7%) used inverters recorded as Tesla.

In the last 24 months, 659 of Orange’s 769 installs name a battery maker in the “Generator Manufacturer” fields, and most of those (489, 74.2%) used batteries recorded as Tesla.

1,201 of 1,259 battery-paired PG&E and SCE installs (95.4%) name a battery maker in the Generator fields. SDG&E files a battery as its own project record, so SDG&E solar records name modules and inverters only.

EquipmentMaker as recordedInstalls, last 24 monthsInstalls, all years
Module makerQcells2391,035
LONGi103285
JA Solar83208
Silfab81not in top list
REC61365
Inverter makerTesla421537
Enphase2142,109
SolarEdge1311,850
Delta Electronics13137
Qcells11not in top list
Battery makerTesla489732
Enphase95184
SolarEdge3947
FranklinWH1923
LG8163

Counts are installs that name the maker at least once, not panel or inverter quantities. Modules and batteries are read from “Generator Manufacturer 1” to “Generator Manufacturer 7”; inverters from “Inverter Manufacturer 1” to “Inverter Manufacturer 26”. Installs with these fields blank, or naming no maker (for example “UNKNOWN”), are not counted: modules are named on 4,889 of 6,199 installs, inverters on 6,197. See the methodology and the equipment index.

ZIP codes in Orange

ZIP codes with their own page where the utilities recorded Orange on at least 10% of the ZIP’s installs, through Aug 31, 2026.

928672,3922,410274
928692,0802,080280
92865993993132
9286841841939
9286630931743

SGIP battery storage projects in Orange

The SGIP report lists 335 battery storage projects with the city Orange, 202 with the status Paid ($4,312,446 in current incentive allocations, 9,688 kWh).

Status as publishedProjectsStorage kWhCurrent incentive
Paid2029,688$4,312,446
PBI in Process3754$232,447
Reserved17369$360,555
Pending Reservation483$62,742
Waitlist353$90,161
Cancelled1018,929$4,573,728
RRF Rejected5647$292,863

Installers named on the most SGIP storage projects in Orange

InstallerProjectsPaid
Sunrun5335
Semper Solaris Construction Inc3726
SunPower2415
TLP Electric Integrations, Inc.1710
LA Solar Group139
ORANGE COUNTY CONTRACTING SERVICES136
Solar Optimum Inc.128
SolarMax Renewable Energy Provider, Inc126
Orange County Solar105
PetersenDean108

47 of the 335 projects name no installer with a page in this index, so they are counted above but not in this list.

Each project is one SGIP application with the equipment type Electrochemical Storage in the program administrators’ Real-Time Public Report, downloaded Nov 16, 2026. Incentive amounts are its Current Incentive field, which the SGIP report defines as “The latest and most current incentive allocation.” For the Residential Solar and Storage Equity categories that amount includes the solar incentive. Status is the Budget Classification field (“Payment status based on the application's fully qualified state.”), or the Fully Qualified State where it is blank. Amounts are as published, not payments verified by this site.

All SGIP battery projects, and SGIP battery incentive money by county.

At a glance

Residential solar installs
6,199
Last 24 months
769
Capacity
47.2 MW DC
Median system size
7 kW DC
With battery storage
20.3% all time; 87.9% last 24 months
Third-party owned
33.7% where reported
Ownership types recorded
PPA 1,428, lease 391, prepaid lease 3, other 81
Median battery size
13.5 kWh
Earliest install in data
Mar 13, 2001

Common questions

How many homes in Orange have solar?

6,199 residential solar systems in Orange were interconnected by PG&E, SCE or SDG&E through Aug 31, 2026, 769 of them in the last 24 months. Homes on municipal utilities are not included.

How many solar installers work in Orange?

143 installer names have at least one install interconnected in Orange in the last 24 months, and 703 appear in the full record.

How common are batteries with new solar in Orange?

20.3% of the solar installs interconnected in Orange include battery storage across all years, and 87.9% in the last 24 months (676 of 769).

How many solar installs in Orange are under NEM 3.0?

888 of the 6,199 residential solar installs in Orange (14.3% of the 6,199 with a tariff recorded) were interconnected under the Net Billing Tariff, the successor to NEM 2.0 often called NEM 3.0, and 86.7% of those include battery storage. The Net Billing Tariff applies to interconnection applications submitted on or after April 15, 2023.

Sources

Records last pulled Nov 16, 2026. Every entry links to the original public record.